• No results found

A production throughput forecasting system in an automated hard disk drive test operation using GRNN

N/A
N/A
Protected

Academic year: 2020

Share "A production throughput forecasting system in an automated hard disk drive test operation using GRNN"

Copied!
29
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Proposed procedure for development of a forecasting system
Figure 2. GRNN architecture
Figure 3. Output screen capture of the input selection module
Figure 4. Output screen capture of the forecasting module using GRNN calculation
+7

References

Related documents

Students originating from countries in the European Union (EU/EFTA) nations must obtain the International Health Insurance Certification (former E111 or E128) or EHIC-Card from

Alur berita ini diawali oleh tulisan tentang penolakan terhadap potensi penyebaran paham ajaran Negara Islam Irak dan Suriah (ISIS) di Indonesia. Paragraf

Not only do these systems account for less than 90% of the end energy usage, metering all HVAC (or all lighting or receptacle) loads together does not allow building owners to analyze

An industry is considered as an oligopoly if the number of firms therein is small enough as to cause “mutual dependence” recognized, so that in a differentiated oligopoly where

These quite satisfactorily do the job of absorbing or generating reactive power with a faster time response from (FACTS) Flexible AC Transmission system. FACTS

Parallelism method by CUDA on the graphics processing unit, in the case the threads have great access to the global memory and shared memory is not used, runtime

Since the knowledge regarding the role of enteroviruses in young neonates with sepsis is lim- ited in our region, therefore, this study was aimed to determine the etiologic agents

GAQ12 – Organizational/Fund Type Summary Report: This report will return the fiscal year opening balances, as well as the year-to- date revenue, expenses and ending balances for