• No results found

Active Spaces Maintenance Feb 21

N/A
N/A
Protected

Academic year: 2021

Share "Active Spaces Maintenance Feb 21"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

(1)

Active Spaces - Maintenance Funding Application Form

* indicates a required field

Change to Funding Criteria

Due to the financial hardship many sport and recreation clubs are experiencing as a result of the current COVID 19 pandemic, it will not be a requirement for eligible organisations to contribute matched funding.

This proposal is a direct response to the current needs of the community, as Council

recognises that many clubs will not have the financial resources to commit matched funding to their proposed maintenance projects at this time.

The funding will be based on a sliding scale dependant on 2019 membership numbers. This will ensure that every eligible club who applies will receive funding, without the need to contribute financially.

Council Employee - Conflict of Interest

Are you an employee of Logan City Council?

○   Yes ○   No

Full time, part time, temporary

Conflict of Interest Declaration Form

If you are a Council employee you are required to declare any potential conflicts of interest. Please complete the Conflict of Interest Declaration - Assessment Form found on the Buzz and upload here. If you have any questions regarding this process, please contact the Sport and Recreation Project Officer on 3412 4886. If you are an employee of Logan City Council and do not attach a completed Conflict of Interest Declaration - Assessment Form your application will not be processed.

Upload Conflict of Interest Declaration - Assessment Form

Attach a file:

 

Council's Code of Conduct requires ALL employees to declare any potential conflicts of interest. It is your responsibility to comply with the Code of Conduct by completing and signing the declaration.

Organisation Details

Organisation Name *

Organisation Name

 

(2)

 

Organisation Physical Address *

Address

 

 

Suburb   State   Postcode

 

 

 

 

 

Organisations must be operating within the boundaries of Logan City on Council owned or controlled land

Postal Address *

Address

 

 

Suburb   State   Postcode

 

 

 

 

 

Incorporation Number *

 

Are you registered for GST? *

○  Yes ○  No

Note: If your organisation is not registered for GST you will not be eligible to be paid GST as part of the grant payment.

Organisation ABN *

 

The ABN provided will be used to look up the following information. Click Lookup above to check that you have entered the ABN correctly.

 Information from the Australian Business Register  ABN

 Entity name  ABN status  Entity type

 Goods & Services Tax (GST)  DGR Endorsed

 ATO Charity Type More information

 ACNC Registration  Tax Concessions  Main business location

(3)

Contact Details

Accountable Officer * Title   First Name   Last Name

 

 

 

 

 

Accountable Officer

Position *

 

For example: President, Chief Executive Officer, Management Committee Member

Accountable Officer

Phone Number *

 

Accountable Officer

Email *

 

How did you hear about

the Grants Program? * ☐   Logan City Council website☐   Council's Facebook page ☐   Our Logan Magazine ☐   E-mail

☐   Word of mouth ☐   Other

If other, please specify

 

 

Mandatory

* indicates a required field

If your organisation is not able to meet all of the following mandatory

criteria please contact your Sport and Recreation Officer to discuss

 Ensure your organisation is operating on Council owned or controlled land within the boundaries of Logan City

 Ensure your organisation has no outstanding debt to Logan City Council of 30 days or more at closing date of funding program program or has entered into and maintained scheduled payment arrangements with Council

 Ensure your organisation has acquitted previous Active Spaces - Maintenance grant funds at closing date of funding program. This applies to funding rounds prior to September 2020.

 Ensure your organisation is compliant with the Office of Fair Trading at closing date of funding program

Is your organisation one of the following *

○   For-profit ○   School

○   Non-incorporated

(4)

○   None of the above

If you ticked any of the above you are not eligible to receive funding

Queensland Government COVID SAFE Active Clubs Kickstart or Active

Restart Infrastructure Recovery funding programs

Have you received funding under the Queensland Government COVID SAFE Active Clubs Kickstart or Active Restart Infrastructure Recovery funding programs for the same item/expenditure? *

○   Yes ○   No

If yes, please advise project and amount received.

 

Do you hold a lease/tenure with Logan City Council (sublease/right of use/ memorandum of understanding) *

○   Yes ○   No ○ Other:

 

If your organisation is not the Head Lessee of the Council facility you will be required to submit a letter of support for your project from the Head Lessee.

Attach letter of support (if applicable)

Attach a file:

 

Have you provided a current, completed Organisation Planning Took Kit/Strategic Plan to a standard deemed by Logan City Council? *

○   Yes ○   No

Attach a current, completed Organisation Planning Tool Kit/Strategic Plan to a standard deemed by Logan City Council, if not already provided

Attach a file:

 

Have you provided your current Public Liability Insurance ($20 million) *

○   Yes ○   No

Attach current Public Liability Insurance if not already provided.

(5)

 

 

Project Overview/Need

* indicates a required field

What is your grant to be used for? *

○   Maintenance of maintenance equipment or machinery ○   Annual pest spray and termite inspection

○   Removal of non-compliant sponsorship signs* ○   Re-keying facility *

○   Canteen/kitchen ○   Field Lighting - bulbs

○   Hard playing surfaces maintenance ○   Playing fields maintenance

○   Painting ○ Other:

 

Please contact your Sport and Recreation Officer if you are considering applying for funding for removal of non-compliant sponsorship signs or re-keying your facility.

Project description *

 

Word count:

(Must be no more than 100 words) Describe what you are going to do by outlining a scope of works, eg. who (contractor), what (step by step), when (date), and where (location)

Please outline why this project is needed and why this project is a priority for your organisation. *

 

Word count:

(Must be no more than 250 words) Provide an overview of why the project is needed eg. OH & S, lack of funds, increase membership, meet minimum standards by Governing Body

Please describe how your project will be maintained in the future to ensure it has maximum life capacity. *

 

Word count:

(Must be no more than 100 words) Sinking fund, Asset Management Plan, weekly mowing/watering, regular inspections

(6)

Finance

* indicates a required field

Maximum funding amount is based on 2020 Membership Numbers as

listed in the table below

2020 Club Membership

Maximum Grant Amount Per Club

1-100 $1000 101-300 $2000 300 + $3000

Please provide 2020 Playing Membership Numbers

2020 Male Membership Numbers *

 

Must be a number.

2020 Female Membership Numbers *

 

Must be a number.

At lease one (1) written quote is required for your project. *

Attach a file:

 

Note: quote required to show GST amount for project

Total Project Cost *

$

What is the total budgeted cost (dollars) of your project? (GST exclusive)

Total Amount Requested *

$

Maximum amount is based on 2019 Members numbers (GST exclusive)

Payment

(7)

Bank Account Name *

 

Note: Funds will be paid into a club account only.

Bank Name *

 

eg. Westpac, Commonwealth

BSB Number *

 

Bank Account Number *

 

 

Supporting Information

Please upload any additional supporting documentation:

Please attach any other document relevant to your application

Attach a file:

 

Please attach any other document relevant to your application

Attach a file:

 

Please attach any other document relevant to your application

Attach a file:

 

 

Certification / Declaration

In submitting this application I certify / declare that: 1. To the best of my knowledge the information provided is true and correct;

2. I have read the associated funding guidelines detailed on the Logan City Council website; and

3. I understand that if successful, I am required to accept the conditions of this grant in accordance with Council's accountability and reporting principles.

(8)

Please select:  

Privacy Collection Notice

Logan City Council is collecting your contact details and program specifics to correctly place your application through our grants process. The information will only be acessed by employees and/or Councillors of Logan City Council. Your information will not be given to any other person or agency unless you have given permission or we are required by law.

Transfer of personal information overseas

Logan City Council is utilising software that is located overseas to create this online form. You are agreeing that your personal information may be transferred and/or stored in an overseas facility.

References

Related documents

Nominal annual percentage of mortgage schedule determines the excel loan amortization schedule will have other loan using the majority of time.. Borrower to this, mortgage

Job Description Students with Federal Work-Study can do paid 'community service' work by becoming a tutor in either reading or math for at-risk children up to Grade Six at

Conclusion: Eosinophilic inflammation was related to characteristics of asthma and sputum eosinophils. However, neutrophilic in- flammation reflected neither asthma features,

A corporation would be liable for the acts of its Board of Directors and officers if the said acts were performed by them in accordance with powers granted to them under

Almost concurrently with the publication of the Helicosporidium genome, Gao and co-authors reported the genome of another free-living Trebouxiophyceae, Chlorella

the subject of an order of non-disclosure you are not required to reveal those criminal matters on this form. However, a criminal matter that is the subject of an order

Assuming that we have obtained a reasonable base- line model from the standard waveform inversion that fits the baseline survey, we can calculate the Green’s function between any

The seamless data processing capability of Maptek I-Site Studio software ensures that the I-Site 8800 system will become the first choice for all long range scanning