Construction Progress E-mail Update

Bloomfield Public Schools Energy Project

Page 1 of 15

General Items:

1.

Bert plug load management install is to be scheduled by the school district as per meeting on 5/24/17.

2.

Change Order 3 Approved for new Chiller compressor for High School on 8/21/17.

3.

Transformer Replacement at High School will take place on 9/9/17.

Date:

September 8, 2017

Prepared By:

Wyatt Ferguson

Page:

1

Overall Construction Progress: 68%

of:

15

O v er al l P er c ent age B loom fi el d B O E O ff ic es B er k el ey E S B loom fi el d M S B loom fi el d H S B rook dal e E S C ar ter et E S D em ar es t E S F ai r V iew E S F or es t G llen E E C F rank lin E S O ak V iew E S W at s es s ing E S ECM1 - Lighting/Electrical A - Lighting Upgrades 11% B - Vending Misers 0%

C - Plug Load Management 0% D - De-Stratification Fans 100% E - High Efficiency Transformers 0% ECM2 - Mechanical

A - Boiler Replacements 67%

B - Steam Trap/Thermostatic CV Replacement 100%

C - Piping Insulation 100%

ECM3 - Building Management Systems 40%

ECM4 - Building Envelope Improvements 100%

Not Applicable ON Schedule

In Progres s Behind Sched

(2)

Page 2 of 15

ECM 1 – Lighting:

ECM 1a: Lighting Upgrades

Building Start Finish Punch List Date

Carteret ES 7/28/17 9/15/17 TBD

Watsessing ES 9/5/17 9/22/17 TBD Forest Glen EEC 9/25/17 10/13/17 TBD Bloomfield BOE Offices 9/20/17 11/3/17 TBD

Brookdale ES 11/3/17 11/24/17 TBD Oak View ES 11/24/17 12/22/17 TBD Demarest ES 12/22/17 1/12/18 TBD Franklin ES 1/12/18 2/14/18 TBD Fair View ES 2/14/18 3/7/18 TBD Berkeley ES 3/7/18 3/28/18 TBD Bloomfield MS 3/28/18 5/16/18 TBD Bloomfield HS 5/16/18 7/11/18 TBD

Substantial Completion Date: TBD Percent Complete: 11%

Carteret Elementary School

(3)

Page 3 of 15

Room 213 Original Lighting

Room 213 New Fixtures

Watsessing Elementary School

(4)

Page 4 of 15

Room 306 Original Lighting

Room 306 New LED

(5)

Page 5 of 15

ECM 1b: Vending Misers

Building Start Date Est. Completion Date Punch List Date

Bloomfield HS TBD TBD TBD

Forest Glen ECC TBD TBD TBD

Bloomfield BOE Offices TBD TBD TBD

Bloomfield MS TBD TBD TBD

Brookdale ES TBD TBD TBD

Demarest ES TBD TBD TBD

Watsessing ES TBD TBD TBD

Substantial Completion Date: TBD Percent Complete: 0%

ECM 1c: Plug Load Management

Building Start Date Est. Completion Date Punch List Date

Bloomfield BOE Offices TBD TBD TBD

Berkeley ES TBD TBD TBD Bloomfield MS TBD TBD TBD Bloomfield HS TBD TBD TBD Brookdale ES TBD TBD TBD Carteret ES TBD TBD TBD Demarest ES TBD TBD TBD Fair View ES TBD TBD TBD

Forest Glen EEC TBD TBD TBD

Franklin ES TBD TBD TBD

Oak View ES TBD TBD TBD

Watsessing ES TBD TBD TBD

Substantial Completion Date: TBD Percent Complete: 0%

ECM 1d: De-Stratification Fans

Building Start Date Est. Completion Date Punch List Date

Oak View ES 6/26/17 6/27/17 TBD

Brookdale ES 6/28/17 6/29/17 TBD

(6)

Page 6 of 15

Forest Glen EEC 7/3/17 7/5/17 TBD

Fair View ES 7/6/17 7/7/17 TBD Bloomfield MS 7/7/17 8/23/17 TBD Franklin ES 7/17/17 7/19/17 TBD Berkeley ES 7/18/17 7/18/17 TBD Carteret ES 7/20/17 7/21/17 TBD Bloomfield HS 7/21/17 8/4/17 TBD Watsessing ES 8/7/17 8/9/17 TBD

Substantial Completion Date: 8/23/17 Percent Complete: 100%

ECM 1e: High Efficiency Transformers

Building Start Date Est. Completion Date Punch List Date

Bloomfield HS 9/9/17 9/9/17 TBD

Substantial Completion Date: TBD Percent Complete: 0%

ECM 2 – Mechanical Systems Upgrades:

ECM 2a: Boiler Replacements

Building Start Date Est. Completion Date Punch List Date

Franklin ES 7/17/17 9/29/17 TBD

Forest Glen ECC 7/31/17 10/13/17 TBD

Substantial Completion Date: TBD Percent Complete: 67%

(7)

Page 7 of 15

Original Franklin Boilers

(8)

Page 8 of 15

After Abatement of Franklin Boilers

New Pads – Franklin Boilers

(9)

Page 9 of 15

Progress of Franklin Boilers

(10)
(11)

Page 11 of 15

Forest Glen Boiler Old Boiler

(12)

Page 12 of 15

Progress

(13)

Page 13 of 15

ECM 2b: Steam Trap/Thermostatic Control Valve Replacement

Building Start Date Est. Completion Date Punch List Date

Carteret ES 6/12/17 7/18/17 TBD Watsessing ES 6/19/17 7/17/17 TBD Berkeley ES 6/21/17 6/27/17 TBD Oak View ES 6/22/17 7/5/17 TBD Demarest ES 7/5/17 7/12/17 TBD Fair View ES 7/13/17 7/19/17 TBD Brookdale ES 7/13/17 7/25/17 TBD Franklin ES 7/14/17 8/1/17 TBD

Substantial Completion Date: 8/15/17 Percent Complete: 100%

ECM 2c: Piping Insulation

Building Start Date Est. Completion Date Punch List Date

Watsessing ES 8/10/17 8/15/17 TBD

Fairview ES 8/15/17 8/25/17 TBD

Substantial Completion Date: 8/25/17 Percent Complete: 100%

Watsessing Elementary

(14)
(15)

Page 15 of 15

ECM 3 – Building Management Systems

ECM 3: Building Management System Upgrades

Building Start Date Est. Completion Date Punch List Date

Bloomfield High School 7/11/17 9/15/17 TBD

Demarest ES 7/17/17 12/8/17 TBD

Franklin ES 10/2/17 12/8/17 TBD

Substantial Completion Date: TBD Percent Complete: 40%

ECM 4 – Building Envelope

ECM 4: Building Envelope

Building Start Date Est. Completion Date Punch List Date

Bloomfield HS 6/12/17 6/15/17 8/31/17 Bloomfield BOE Offices 6/15/17 6/15/17 8/31/17

Watsessing ES 6/16/17 6/20/17 8/31/17 Demarest ES 6/20/17 6/22/17 8/31/17 Carteret ES 6/22/17 6/23/17 8/31/17 Fair View ES 6/23/17 6/23/17 8/31/17 Forest Glen EEC 6/26/17 6/26/17 8/31/17 Franklin ES 6/26/17 6/28/17 8/31/17 Berkeley ES 6/28/17 6/30/17 8/31/17

Oak View ES 7/3/17 7/5/17 8/31/17

Bloomfield MS 7/5/17 7/7/17 8/31/17

Brookdale ES 7/7/17 8/31/17 TBD

Substantial Completion Date: 7/12/17 Percent Complete: 100%

(16)

ID Task Name Start Finish

1

Lighting Upgrades

Mon 9/11/17 Fri 9/22/17

2

Watsessing Elementary

Mon 9/11/17 Fri 9/22/17

3

Carteret Elementary

Mon 9/11/17 Fri 9/15/17

4

5

ECM-2 Schedule - Boiler Replacement

Mon 9/11/17 Fri 9/22/17

6

Franklin Elementary

Mon 9/11/17 Fri 9/22/17

7

Forest Glen

Mon 9/11/17 Fri 9/22/17

8

9

ECM - 3 BMS Upgrades

Mon 9/11/17 Fri 9/22/17

10

Demarest Elementary

Mon 9/11/17 Fri 9/22/17

11

High School Upgrades

Mon 9/11/17 Fri 9/22/17

12

13

ECM - 1 Transformers Upgrade

Sat 9/9/17

Sat 9/9/17

14

High School

Sat 9/9/17

Sat 9/9/17

Watsessing Elementary Carteret Elementary Franklin Elementary Forest Glen Demarest Elementary High School Upgrades High School

W T F S Sep 10, '17S M T W T F S Sep 17, '17S M T W T F S Sep 24, '17S

Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only

Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Progress Manual Progress Page 1 Project: Bloomfield Date: Fri 9/8/17