Visualization, Management & Optimization

Keys for an efficient Data Center

(3)

Before to start…

• Lopsided data center budget growth

• Allocating the cost of IT inefficiency

• Data center efficiency gains have hit a plateau

• Killing comatose servers, deleting outdated

applications

• Green certifications and carbon reporting

• Data center capacity trends

• Cloud computing adoption and hurdles

• DCIM adoption through the roof?

(4)
(5)

Agenda

(6)

? ? ? ? ? ? ? ? ? ? ? ?

Challenge to Manage the DC

• Server Deployment is a complex task…

(7)

What is a suitable Cabinet?

• Available Height Space (Rack Units)

• Available Deep Space

• Enough Weight Support

• Free ElectricalOutlets

• Copper/Fiber Cabled Ports:

(8)

Challenge to Manage the DC

• Server Deployment is a complex task…

(9)

Which Services?

Primary LAN Secondary LAN

LAN Core 1

LAN Core 2

LAN OoB

(10)

Company spends money on unnecessary Telecom infrastructure…

… in the rush to provisioning connectivity quickly for new or relocated devices, switch ports that are no longer in use are often left plugged in and money is often spent on new switches that are not actually needed.

(11)

What cause these problems???

Infrastructure Documentation is not unified:

Infrastructure Documentation is not updated:

(12)

Adding Real-Time Management:

+

=

Vision

Knowledge

Control

With the Help of 3 Components:

intelligent Panel

+

intelligent Controller

+

intelligent Software

(13)

Infrared Sensor on every Port:

Trace Button on every Port: LED on every Port:

Components:

intelligent Panel

Detects the presence or absence of a standard cord

Shows where a end of a cord is, or the position for a pendent job

(14)

Components:

intelligent Controller

Receives events from IPatch Panels and forward them to imVision Software

Shows the complete “End to End” Trace for a given port.

Gives text instructions to the technician assisting him on MAC labors. (Spanish & Portuguese)

Produces sounds to alert the technician when Cords are been added or removed.

(15)

Unified & Updated Database:

Geographical*Floor Plan*In-Rack Cabling In-Floor Cabling Circuit Trace

Switch Port Status

Components:

intelligent Software

Services*

Employees*

(16)

Select server template

Template includes size, power, weight, ports, required services

Deploy server

Technicians guided to complete Electronic work orders

Automatic confirmation

Correct service activation detected, service tickets closed

Schedule deployment

Connectivity paths determined electronic work orders issued

Select Rack/Cabinet

Selection based on available rack units, power, maximum load

(17)

Agenda

(18)

DCIM

1.

Interconnectivity

– The Data

Management of assets, resources, and their interdependencies with analytics and predictive modeling (what-if

scenarios)

2.

Visualization

Living, breathing 3D model – linked to the data – featuring myDCIM™

role-based user experience

3.

Open Systems

No vendor or proprietary constraints

4.

Proven Deployment

Methodology

Fast, risk-free deployment with rigorous cost containment

5.

Value-Based Pricing

(19)

Open Systems - Proven

• Open – the natural evolution of DCIM

• Eliminates vendor constraints

• Rapid integrations via DCIM

Open Exchange Framework™

(20)

Interrelationships – Network Connectivity

Granular view of connectivity from Device Network Port to Destination Switch Port

(21)

Interrelationships – Power Chain

End to end power connectivity from the power supply out to the transformer

End to end power

connectivity tears down the silos between IT, Facilities, OPS,

Maintenance, BMS, and the Business to drive a new level of visibility into interdependency and operational

efficiency. DCIM can fully

document the path of power including

(22)

Decisions in Context

Impact analysis of downing a PDU for maintenance

(23)

Decisions in Context

Interrelationships of Assets

An interactive holistic view of the data center lets you point-and-click through the entire IT

(24)

Planning

Capacity planning by power rating – manufacturer’s, benchmark and real time

Accelerate the justification for commissioning new equipment to lower OPEX cost.

Increase rack density using the actual CPU power and temperature readings thus maximizing capacity and delaying infrastructure

(25)

Tech Refresh by Utilization, End of Lease, Asset Type, or Line of Business

Tech Refresh

Proactively reduce energy

consumption by eliminating “ghost servers”, under performing devices and end of life hardware.

Compare power usage at an individual device level, creating an opportunity to conduct asset to asset comparisons to

(26)

Intelligent Commissioning

Define available space for asset deployment

(27)

Workflow Efficiency

Commission assets by available space, power, connectivity, etc.

(28)
(29)

Questions?

(30)

References

Related documents

MOBILE – a data protection solution off ering end-to- end data protection to small businesses looking to backup all user devices in their environment – from desktops and laptops

In addition, we predicted that participants in the gesture-plus condition would not use their extra communication channel to develop a referential symbol system (though they might

Step forward with the right foot into the second square (3) and then laterally move the left foot next to the right foot (4). Step with the right foot, placing it outside the

Therefore, in making the municipal council responsible for making their built environment resilient to disasters it is important to provide them with the required authority

wat is. Liefde gooit zich altijd in het moment, hier en nu, geeft zich helemaal over aan het nu. Op deze manier een relatie hebben is eenvoudig. Het is nederig. Het

H igaonna K anryo Sensei trained his disc ipl es so hard and severely that even Miyag i Choj un Sensei though t more than once abou t quilling.. Sometimes Miyagi

The empirical results of cointegration technique during Johansen test talk about that confined cointegration association among the preferred variables in the present

Identification/Analysis Use the definition of a logarithm to write the expression in exponential form.. The base on the logarithm is 3, so the base for exponential form is