19-R-4721

AN AMENDED RESOLUTION BY FINANCE/EXECUTIVE COMMITTEE AUTHORIZING THE MAYOR, OR HER DESIGNEE, TO ENTER INTO AMENDMENT NO. 17 TO FC-9323, COOPERATIVE AGREEMENT FOR INDEFINITE QUANTITY CONSTRUCTION WITH EIGHT (8) CONTRACTORS FC-9323(A): ASTRA GROUP, INC.; FC-9323(F): GREEN & BURDETTE PROPERTY MANAGEMENT, LLC.; FC-9323(H): OSPREY MANAGEMENT, LLC. FC-9323(1): PRIME CONTRACTORS, INC.; FC-9323(K): RUBIO AND SON INTERIORS, INC.; FC-9323(L): HCR.

CONSTRUCTION, INC.; FC-9323 (N): JOHNSON-LAUX CONSTRUCTION, LLC.; FC-9323 (O): HITT CONSTRUCTION, INC. ON BEHALF OF DEPARTMENT OF ENTERPRISE ASSETS MANAGEMENT, RENEW ATLANTA, DEPARTMENT OF FINANCE AND MUNICIPAL COURT IN AN AMOUNT NOT TO EXCEED TWO MILLION FIFTY-FIVE THOUSAND SIX HUNDRED TWELVE DOLLARS AND EIGHTY-FIVE CENTS ($2,055,612.85); ALL CONTRACTED WORK SHALL BE CHARGED TO AND PAID FROM ACCOUNTS LISTED; AND FOR OTHER PURPOSES.

WHEREAS, the Department of Enterprise Assets Management has identified the need to make improvements to various City owned facilities; and

WHEREAS, on November 7, 2016 the Atlanta City Council approved Resolution 16-R-4518 authorizing the Mayor to enter into a Cooperative Agreement with fifteen (15) contractors to make necessary improvements to various City owned facilities; and

WHEREAS, resolution 17-R-3109, adopted by the Atlanta City Council on February 20, 2017 and approved as per City Charter Section 2-403 on March 1, 2017, corrected Resolution 16-R-4518 by listing the names of the fifteen (15) contractors and contract numbers as follows: FC-9323 (A): Astra Construction Services, LLC.; FC-9323 (B): Brown & Root; FC-9323 (C): Centennial Contractor Enterprises, Inc.; FC-9323 (D): Engineering Design Technologies, Inc.; FC-9323 (E): F.H. Paschen/ S.

N. Neilson & Associates; FC-9323 (F): Green & Burdette Property Management, LLC.; FC-9323 (G):

JOC Construction formerly known as Lesco Restoration, Inc.; FC-9323 (H): Osprey Management, LLC.; FC-9323 (I): Prime Contractors, Inc.; FC-9323 (J): Red Cloud Services, LLC.; FC-9323 (K):

Rubio And Son Interiors, Inc.; FC-9323 (L): HCR Construction, Inc.; FC-9323 (M): JJ Morley Enterprises, Inc.; FC-9323 (N): Johnson-Laux Construction, LLC.; FC-9323 (O): HITT Construction, Inc.; and

WHEREAS, pursuant to 17-R-3230, adopted by the Atlanta City Council on March 6, 2017 and approved as per City Charter Section 2-403 on March 15, 2017, the City entered into Amendment No 1.

to FC-9323, Cooperative Agreement with fifteen (15) contractors FC-9323 (A): Astra Construction Services, LLC.; FC-9323 (B): Brown & Root; FC-9323 (C): Centennial Contractor Enterprises, Inc.;

FC-9323 (D): Engineering Design Technologies, Inc.; FC-9323 (E): F.H. Paschen/ S. N. Neilson &

Associates; FC-9323 (F): Green & Burdette Property Management, LLC.; FC-9323 (G): JOC Construction formerly known as Lesco Restoration, Inc.; FC-9323 (H): Osprey Management, LLC.; FC- 9323 (I): Prime Contractors, Inc.; FC-9323 (J): Red Cloud Services, LLC.; FC-9323 (K): Rubio and Son Interiors, Inc.; FC-9323 (L): HCR Construction, Inc.; FC-9323 (M): JJ Morley Enterprises, Inc.; FC- 9323 (N): Johnson-Laux Construction, LLC.; FC-9323 (O): HITT Construction, Inc., to add the Department of Planning and Community Development as an authorized user and to add funding; and

(2)

WHEREAS, pursuant to 17-R-3521, adopted by the Atlanta City Council on May 1, 2017 and approved as per City Charter Section 2-403 on May 10, 2017, the City entered into Amendment No. 2 to FC-9323, Cooperative Agreement with fifteen (15) contractors FC-9323 (A): Astra Construction Services, LLC.;

FC-9323 (B): Brown & Root; FC-9323 (C): Centennial Contractor Enterprises, Inc.; FC-9323 (D):

Engineering Design Technologies, Inc.; FC-9323 (E): F.H. Paschen/ S. N. Neilson & Associates; FC- 9323 (F): Green & Burdette Property Management, LLC.; FC-9323 (G): JOC Construction formerly known as Lesco Restoration, Inc.; FC-9323 (H): Osprey Management, LLC.; FC-9323 (I): Prime Contractors, Inc.; FC-9323 (J): Red Cloud Services, LLC.; FC-9323 (K): Rubio and Son Interiors, Inc.;

FC-9323 (L): HCR Construction, Inc.; FC-9323 (M): JJ Morley Enterprises, Inc.; FC-9323 (N):

Johnson-Laux Construction, LLC.; FC-9323 (O): HITT Construction, Inc., to add the Department of Watershed Management as an authorized user and to issue a task order to FC-9323 (N): Johnson-Laux Construction, LLC; and

WHEREAS, pursuant to 17-R-3940, adopted by the Atlanta City Council on July 17, 2017 and approved as per City Charter Section 2-403 on July 26, 2017, the City entered into Amendment No. 3 to FC-9323 (L): HCR Construction, Inc. on behalf of the Department of City Planning to add funding and to issue task orders; and

WHEREAS, pursuant to 17-R-4020, adopted by the Atlanta City Council on August 21, 2017 and approved as per City Charter Section 2-403 on August 30, 2017, the City entered into Amendment No. 4 to FC-9323, Cooperative Agreement with fifteen (15) contractors FC-9323 (A): Astra Construction Services, LLC.; FC-9323 (B): Brown & Root; FC-9323 (C): Centennial Contractor Enterprises, Inc.;

FC-9323 (D): Engineering Design Technologies, Inc.; FC-9323 (E): F.H. Paschen/ S. N. Neilson &

Associates; FC-9323 (F): Green & Burdette Property Management, LLC.; FC-9323 (G): JOC Construction (formerly known as Lesco Restoration, Inc.).; FC-9323 (H): Osprey Management, LLC.;

FC-9323 (I): Prime Contractors, Inc.; FC-9323 (J): Red Cloud Services, LLC.; FC-9323 (K): Rubio And Son Interiors, Inc.; FC-9323 (L): HCR Construction, Inc.; FC-9323 (M): JJ Morley Enterprises, Inc.;

FC-9323 (N): Johnson-Laux Construction, LLC.; FC-9323 (O): HITT Construction, Inc., to add Renew Atlanta Bond Program as an authorized user and to establish a task order fund; and

WHEREAS, pursuant to 17-R-4285, adopted by the Atlanta City Council on September 18, 2017 and approved as per City Charter Section 2-403 on September 27, 2017, the City entered into Amendment No. 5 to FC-9323, Cooperative Agreement with eight (8) contractors FC-9323 (A): Astra Construction Services, LLC.; FC-9323 (F): Green & Burdette Property Management, LLC.; FC-9323 (H): Osprey Management, LLC.; FC-9323 (I): Prime Contractors, Inc.; FC-9323 (K): Rubio And Son Interiors, Inc.;

FC-9323 (L): HCR Construction, Inc.; FC-9323 (N): Johnson-Laux Construction, LLC.; FC-9323 (O):

HITT Construction, Inc., to add the Office of Enterprise Assets Management Real Estate Division, The Atlanta Fire Rescue Department, The Atlanta Police Department, and the Department of Aviation as authorized users and to add funding on behalf of the aforementioned departments and to issue a task order to FC-9323 (H): Osprey Management, LLC. for the renovation of the Georgia Hill Neighborhood Center; and

WHEREAS, pursuant to 17-R-4666, adopted by the Atlanta City Council on November 20, 2017 and approved as per City Charter Section 2-403 on November 29, 2017, the City entered into Amendment

(3)

No. 6 to FC-9323, Cooperative Agreement with eight (8) contractors FC-9323 (A): Astra Construction Services, LLC.; FC-9323 (F): Green & Burdette Property Management, LLC.; FC-9323 (H): Osprey Management, LLC.; FC-9323 (I): Prime Contractors, Inc.; FC-9323 (K): Rubio And Son Interiors, Inc.;

FC-9323 (L): HCR Construction, Inc.; FC-9323 (N): Johnson-Laux Construction, LLC.; FC-9323 (O):

HITT Construction, Inc., to add additional Renew Atlanta bond program projects and add additional funds; and

WHEREAS, pursuant to 17-R-4756, adopted by the Atlanta City Council on December 13, 2017 and approved by Mayor Kasim Reed on December 15, 2017, the City entered into Amendment No. 7 to FC- 9323, Cooperative Agreement with FC-9323 (A): Astra Construction Services, LLC. on behalf of the Office of Enterprise Assets Management to add funding and issue a task order for the Trinity Lot Project; and

WHEREAS, pursuant to 18-R-3390, adopted by the Atlanta City Council on April 16, 2018 and approved as per City Charter Section 2-403 on April 25, 2018, the City entered into Amendment No. 8 to FC-9323, Cooperative agreement with eight (8) contractors FC-9323 (A): Astra Construction Services, LLC.; FC-9323 (F): Green & Burdette Property Management, LLC.; FC-9323 (H): Osprey Management, LLC.; FC-9323 (I): Prime Contractors, Inc.; FC-9323 (K): Rubio And Son Interiors, Inc.;

FC-9323 (L): HCR Construction, Inc.; FC-9323 (N): Johnson-Laux Construction, LLC.; FC-9323 (O):

HITT Construction, Inc., on behalf of the Office of Enterprise Assets Management to add funding and issue a task order for phase one (1) of the Municipal Court Renovations; and

WHEREAS, pursuant to 18-R-3391, adopted by the Atlanta City Council on April 16, 2018 and approved as per City Charter Section 2-403 on April 25, 2018, the City entered into Amendment No. 9 to FC-9323, Cooperative Agreement with eight (8) contractors FC-9323 (A): Astra Construction Services, LLC.; FC-9323 (F): Green & Burdette Property Management, LLC.; FC-9323 (H): Osprey Management, LLC.; FC-9323 (I): Prime Contractors, Inc.; FC-9323 (K): Rubio And Son Interiors, Inc.;

FC-9323 (L): HCR Construction, Inc.; FC-9323 (N): Johnson-Laux Construction, LLC.; FC-9323 (O):

HITT Construction, Inc., on behalf of the Department of Enterprise Assets Management for the renovation of the ground and fourth (4th) floor restrooms and the ground floor locker rooms at City Hall South; and

WHEREAS, pursuant to 18-R-3378, adopted by the Atlanta City Council on April 16, 2018 and approved as per City Charter Section 2-403 on April 25, 2018, the City entered into Amendment No. 10 to FC-9323, Cooperative Agreement with eight (8) contractors FC-9323 (A): Astra Construction Services, LLC.; FC-9323 (F): Green & Burdette Property Management, LLC.; FC-9323 (H): Osprey Management, LLC.; FC-9323 (I): Prime Contractors, Inc.; FC-9323 (K): Rubio And Son Interiors, Inc.;

FC-9323 (L): HCR Construction, Inc.; FC-9323 (N): Johnson-Laux Construction, LLC.; FC-9323 (O):

HITT Construction, Inc., on behalf of the Department of Enterprise Assets Management for City Hall Interior Renovations; and

WHEREAS, pursuant to 18-R-3763, adopted by the Atlanta City Council on June 18, 2018 and approved as per City Charter Section 2-403 on June 27, 2018, the City entered into Amendment No. 11 to FC-9323 (A), a Cooperative Purchasing Agreement for Indefinite Quantity Construction with Astra

(4)

Construction Services, LLC., on behalf of the Department of Enterprise Assets Management, to issue a task order for the renovation of the Public Safety Annex parking lot; and

WHEREAS, pursuant to 18-R-3730, adopted by the Atlanta City Council on June 18, 2018 and approved as per City Charter Section 2-403 on June 27, 2018, entered into Amendment No. 12 to the Agreement to add funds to the Renew Atlanta Bond Task Order Fund; and

WHEREAS, pursuant to Resolution 18-R-4359, adopted by the Atlanta City Council on November 19, 2018 and approved as per City Charter Section 2-403 on November 20, 2018, entered into Amendment No. 14 to add funding on behalf of the Department of Watershed Management, Department of City Planning, Atlanta Police Department, and the Renew Atlanta Renew Atlanta Bond Program to renovate City owned facilities, in an amount of $6,726,178.71; and

WHEREAS, pursuant to Resolution 19-R-3278, adopted by the Atlanta City Council on March 4, 2019 and approved per City Charter Section 2-403 on March 13, 2019 entered into Renewal No. 1 and Amendment No. 15 to add funding on behalf of Renew Atlanta in an amount of $410, 000.00; and

WHEREAS, pursuant to Resolution 19-R-3277, adopted by the Atlanta City Council on May 6, 2019 and approved per City Charter Section 2-403 on May 15, 2019 corrected Resolution 17-R-4020 on behalf of Renew Atlanta to correct the funding sources from task level to district roll up level; and

WHEREAS, pursuant to Resolution 19-R-3533, adopted by the Atlanta City Council on March 4, 2019 and approved per City Charter Section 2-403 on March 13, 2019 corrected Resolution 18-R-3278 to include an additional contractor that was omitted; and

WHEREAS, pursuant to Resolution 19-R-3860, approved in Full Council on July 1, 2019, entered into Amendment No. 16 on behalf of the Department of City Planning for the Electronic Document Review (EDR) Pilot Space construction in an amount not to exceed $41,933.67; and

WHEREAS, the Director of Facilities has identified a need for additional funding in an amount of

$20,171.20 to continue City Hall Annex 5th Floor HVAC system replacement; and

WHEREAS, Renew Atlanta has identified a need for additional funding in an amount of $420,000.00 for projects in various districts; and

WHEREAS, the Department of Finance will renovate 14th and 15th floors of City Hall Tower side in an amount of $ 1,315,441.65; and

WHEREAS, the Atlanta Municipal Court will renovation of the assembly room in an amount of

$50,000.00; and

(5)

WHEREAS, Renew Atlanta has identified artwork for the MLK Mural Wall build-out in the amount of

$250,000.00; and

NOW, THEREFORE BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ATLANTA, GEORGIA, that the Mayor, or her designee, is authorized to enter into Amendment No. 17 to FC-9323, Cooperative Agreement with eight (8) contractors FC-9323 (A): Astra Construction Services, LLC.; FC- 9323 (F): Green & Burdette Property Management, LLC.; FC-9323 (H): Osprey Management, LLC.;

FC-9323 (I): Prime Contractors, Inc.; FC-9323 (K): Rubio And Son Interiors, Inc.; FC-9323 (L): HCR Construction, Inc.; FC-9323 (N): Johnson-Laux Construction, LLC.; FC-9323 (O): HITT Construction, Inc., on behalf of the Department of Enterprise Assets Management, Renew Atlanta, Department of Finance and Municipal Court in an Amount Not To Exceed Two Million Fifty-Five Thousand Six Hundred Twelve Dollars and Eighty-Five Cents ($2,055,612.85).

BE IT FURTHER RESOLVED, that all contracted work shall be charged to and paid from Renew Atlanta- 3148 (2015 Municipal Facilities Bond Fund) 310301 (EAM Capital Projects) 1512000 (Accounting) 5999999 (Projects and Grants Budget Summary) 04112224 (District 3 - Facilities) 22281 (Infrastructure Bond)- CD3 - Additional Authority - $100,000.00, 3148 (2015 Municipal Facilities Bond Fund) 310301 (EAM Capital Projects) 1512000 (Accounting) 5999999 (Projects and Grants Budget Summary) 04112217 (Municipal Facilities) 22281 (Infrastructure Bond)-City Wide Additional Authority - $50,000.00, 3148 (2015 Municipal Facilities Bond Fund) 310301 (EAM Capital Projects) 1512000 (Accounting) 5999999 (Projects and Grants Budget Summary) 04112217 (Municipal Facilities) 3201.3 (Landmark Projects) 22281 (Infrastructure Bond-OEAM)-MLK Artwork-

$250,000.00, 3148 (2015 Municipal Facilities Bond Fund) 310301 (EAM Capital Projects) 1512000 (Accounting) 5999999 (Projects and Grants Budget Summary) 04112229 (District 8 - Facilities) 22281 (Infrastructure Bond)- $270, 000.00; and DEAM-3603 (2018 Public Safety Projects) 310301 (EXE Capital Projects) 5999999 (Projects and Grants) 1512000 (Accounting) 04112705 (Capital Improvements) 360322491 (GMA 2018)- $20,171.20; Department of Finance-1001 (General Fund) 100101 (DOF Chief Financial Officer) 5212001 (Consulting/Professional) 1320000 (Chief Executive)-

$1,315,442.00; Municipal Court- 1001 (General Fund) 190101 (Department) 5212001 (Consulting/Professional Services) 2650000 (Function Activity)-$50,000.00.

BE IT FURTHER RESOLVED, that the Chief Procurement Officer, in consultation with the City Attorney, is directed to prepare all appropriate documents for execution by the Mayor, or her designee.

BE IT FINALLY RESOLVED, that Amendment No. 17 will not become binding upon the City, and the City will incur no liability under it until it is executed by the Mayor or her designee, attested to by the Municipal Clerk, approved as to form by the City Attorney and delivered to the contractors.

(6)

CITY COUNCIL ATLANTA, GEORGIA

19-R-4721

AN AMENDED RESOLUTION BY FINANCE/EXECUTIVE COMMITTEE AUTHORIZING THE MAYOR, OR HER DESIGNEE, TO ENTER INTO AMENDMENT NO. 17 TO FC-9323, COOPERATIVE AGREEMENT FOR INDEFINITE QUANTITY CONSTRUCTION WITH EIGHT (8) CONTRACTORS FC-9323(A): ASTRA GROUP, INC.; FC-9323(F): GREEN & BURDETTE PROPERTY MANAGEMENT, LLC.; FC-9323(H): OSPREY MANAGEMENT, LLC. FC-9323(1): PRIME CONTRACTORS, INC.; FC-9323(K): RUBIO AND SON INTERIORS, INC.; FC-9323(L): HCR.

CONSTRUCTION, INC.; FC-9323 (N): JOHNSON-LAUX CONSTRUCTION, LLC.; FC-9323 (O): HITT CONSTRUCTION, INC. ON BEHALF OF DEPARTMENT OF ENTERPRISE ASSETS MANAGEMENT, RENEW ATLANTA, DEPARTMENT OF FINANCE AND MUNICIPAL COURT IN AN AMOUNT NOT TO EXCEED TWO MILLION FIFTY-FIVE THOUSAND SIX HUNDRED TWELVE DOLLARS AND EIGHTY-FIVE CENTS ($2,055,612.85); ALL CONTRACTED WORK SHALL BE CHARGED TO AND PAID FROM ACCOUNTS LISTED; AND FOR OTHER PURPOSES.

Workflow List:

Carl L Christie Completed 09/12/2019 1:35 PM

Chris Davis Completed 09/12/2019 2:15 PM

Finance Completed 09/12/2019 2:23 PM

Roosevelt Council Completed 09/12/2019 3:00 PM

Procurement Completed 09/13/2019 3:46 PM

David Wilson Completed 09/13/2019 4:23 PM

Mayor's Office Completed 09/13/2019 4:36 PM

Office of Research and Policy Analysis Completed 09/18/2019 5:41 PM Finance/Executive Committee Completed 09/25/2019 1:00 PM

Atlanta City Council Completed 10/07/2019 1:00 PM

Atlanta City Council Completed 10/07/2019 1:00 PM

Mayor's Office Pending

HISTORY:

09/25/19 Finance/Executive Committee FAVORABLE AS AMENDED

RESULT: FAVORABLE AS AMENDED [5 TO 1] Next: 10/7/2019 1:00 PM MOVER: JP Matzigkeit, District 8

SECONDER: Andrea L Boone, District 10

AYES: Boone, Dickens, Ide, Matzigkeit, Westmoreland NAYS: Howard Shook

ABSENT: Natalyn Mosby Archibong

10/07/2019 Atlanta City Council ADOPTED AS AMENDED

LE G ISL ATI ON H IST OR Y – BL UE BAC K

(7)

RESULT: ADOPTED AS AMENDED [12 TO 2]

MOVER: Howard Shook, Councilmember, District 7 SECONDER: Andrea L Boone, Councilmember, District 10

AYES: Bond, Dickens, Smith, Farokhi, Brown, Winslow, Archibong, Matzigkeit, Hillis, Boone, Overstreet, Sheperd

NAYS: Jennifer N Ide, Howard Shook AWAY: Matt Westmoreland

(8)

19-R-4721

AN AMENDED RESOLUTION BY FINANCE/EXECUTIVE COMMITTEE AUTHORIZING THE MAYOR, OR HER DESIGNEE, TO ENTER INTO AMENDMENT NO. 17 TO FC-9323, COOPERATIVE AGREEMENT FOR INDEFINITE QUANTITY CONSTRUCTION WITH EIGHT (8) CONTRACTORS FC-9323(A): ASTRA GROUP, INC.; FC-9323(F): GREEN & BURDETTE PROPERTY MANAGEMENT, LLC.; FC-9323(H): OSPREY MANAGEMENT, LLC. FC-9323(1):

PRIME CONTRACTORS, INC.; FC-9323(K): RUBIO AND SON INTERIORS, INC.; FC-9323(L):

HCR. CONSTRUCTION, INC.; FC-9323 (N): JOHNSON-LAUX CONSTRUCTION, LLC.; FC-9323 (O): HITT CONSTRUCTION, INC. ON BEHALF OF DEPARTMENT OF ENTERPRISE ASSETS MANAGEMENT, RENEW ATLANTA, DEPARTMENT OF FINANCE AND MUNICIPAL COURT IN AN AMOUNT NOT TO EXCEED TWO MILLION FIFTY-FIVE THOUSAND SIX HUNDRED TWELVE DOLLARS AND EIGHTY-FIVE CENTS ($2,055,612.85); ALL CONTRACTED WORK SHALL BE CHARGED TO AND PAID FROM ACCOUNTS LISTED; AND FOR OTHER PURPOSES.

 VOTE RECORD - RESOLUTION 19-R-4721

ADOPTED

ADVERSED

FAVORABLE

ACCEPTED AND FILED

REFERRED TO COMMITTEE

HELD IN COMMITTEE

TABLED

DEFERRED

RECONSIDERED

FILED

FILED BY COMMITTEE

FAVORABLE ON SUBSTITUTE

FAVORABLE AS AMENDED

QUESTION CALLED

SUBSTITUTED

AMENDED

REFERRED TO ZRB AND ZC

REFERRED WITHOUT OBJECTION

ADOPTED AS AMENDED

ADOPTED SUBSTITUTE

ADOPTED SUBSTITUTE AS AMENDED

FORWARDED

REFERRED TO SC

FILED WITHOUT OBJECTION

FAILED

ADVERSED IN COMMITTEE

QUADRENNIALY TERMINATED

YES/AYE NO/NAY ABSTAIN ABSENT

MICHAEL JULIAN BOND VOTER

MATT WESTMORELAND VOTER AWAY

ANDRE DICKENS VOTER

CARLA SMITH VOTER

AMIR R FAROKHI VOTER

ANTONIO BROWN VOTER

CLETA WINSLOW VOTER

NATALYN MOSBY ARCHIBONG VOTER

JENNIFER N IDE VOTER

HOWARD SHOOK MOVER

JP MATZIGKEIT VOTER

DUSTIN HILLIS VOTER

ANDREA L BOONE SECONDER

MARCI COLLIER OVERSTREET VOTER

JOYCE M SHEPERD VOTER

(9)

RECOMMENDATION

FORWARDED TO FC/NQ

FAVORABLE/SUB/AMENDED

FAVORABLE/SUB/AMND/CONDITION

FAVORABLE/AMND/CONDITION

RETURNED AS HELD

FAVORABLE/SUB/CONDITION

FAVORABLE ON CONDITION

ACCEPTED

AMENDED SUBSTITUTE

ROUTED TO COW

SUSTAINED

OVERRIDEN

NOT ACCEPTED BY COMMITTEE

SUSTAINED WITHOUT OBJECTION

TABLED W/O OBJECTION

HELD IN COW

[12 to 2]

(10)

Certified by Presiding Officer Certified by Clerk

Mayor’s Action

See Authentication Page Attachment

References

Related documents

Now, we turn to the ubiquitous search environment. To simplify, consider the case where the discount rate r tends to 0. Then, the efficient allocation maximizes the stationary

The Department of Finance invites a prominent employer of our Honours graduates to sponsor the annual introductory Honours Retreat on a two-year rotating

The Financial Control and Compliance cost center provides oversight and accounting of non‐tax revenues  and accounts  receivable,  bank  reconciliation, and 

 Added (initial) support for Unified Service Desk (USD) client integration..  Updated "intelli-CTi User" security role to have ALL

Includes: accounting date; employee ID; name; employee record number; employment code; salary plan; grade & step; chart-field; HR account code; current earnings;

To ensure that the plan incorporated the perspectives of the entire campus, we formed 11 work teams to analyze key components of the HR system. Each team was charged with

Valencia Community College (VCC) in collaboration with the College of Engineering and Computer Science at the University of Central Florida (UCF) has constructed an A.S.. in Computer

Sueann Kenney-Noziska, MSW, LISW, RPT-S, is a Licensed Independent Social Worker and Registered Play Therapist Supervisor specializing in using play therapy in clinical practice