• No results found

Quality of Human Immunodeficiency Virus Viral Load Testing in Australia

N/A
N/A
Protected

Academic year: 2020

Share "Quality of Human Immunodeficiency Virus Viral Load Testing in Australia"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

TABLE 1. HIV-1 RNA load measured by AMPLICOR HIV-1 MONITOR v 1.0 and v 1.5 assays andQuantiplex bDNA 2.0 and 3.0 assays in three separately distributed sets of QC samples
FIG. 2. Results obtained by individual laboratories, identified by code num-ber, for QAP panel VLQA 97-1, a panel of samples with a range of HIV-1
FIG. 3. Results obtained by individual laboratories, identified by code number, for QAP panel VLQA 98-1, a panel of replicates of HIV-1 QC samples QC105,QC105C, and QC106
TABLE 2. HIV-1 RNA levels in samples with different HIV-1 subtypes (QAP panel VLQA 98-2 and QC samples)measured by AMPLICOR HIV-1 MONITOR and Quantiplex bDNA assays

References

Related documents

Field experiments were conducted at Ebonyi State University Research Farm during 2009 and 2010 farming seasons to evaluate the effect of intercropping maize with

In the case of inpatient mortality rates for our selected medical conditions, the AH rate, the low-discretionary AH rate, the maternal trauma rate and the preventable

It was decided that with the presence of such significant red flag signs that she should undergo advanced imaging, in this case an MRI, that revealed an underlying malignancy, which

Pain Management Panels | Drug Detection Time and Thresholds | Comparison of Tests | Interpretive Report Examples | Understanding Test Results..

Similarly the hygienic status of the states may also have accounted for the differences in the level of prevalence of the virus in each of the states, with Lagos,

Now we want to use this first bet to qualify for our free bets at both Betfair and William Hill so we need to make sure that we place at least £25 on both sides of the bet.. This

Deferred mining costs were $79.2 million for the year ended 30 June 2010, compared to $60.5 million in 2009, due to increased waste amortisation from Cadia Hill open pit.. As