• No results found

Public Training Program

N/A
N/A
Protected

Academic year: 2021

Share "Public Training Program"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

(1)

1 / 10

Public Training Program

Primavera Project Management V 6.0

(5 Days) Workshop

25 – 29 Jan 2009, Abu Dhabi

22 – 26 March 2009, Dubai

17 – 21 May 2009, Abu Dhabi

18 – 22 October 2009, Al-Ain

08 – 12 Nov 2009, Abu Dhabi

Fee: US $ 2,750

Consultant: Mr.

Vidya Shankar M.N

Emirates Technical & Safety Development Centre Competency Training Division

P.O. Box 35450 Abu Dhabi United Arab Emirates

Tel: +971 (2) 5552034, Fax: +971 (2) 5541856 Mobile: +971 (50) 6229745 / 4908979

(2)

2 / 10

Primavera Project Management V 6.0

¾ Duration : 40hrs

¾ No of days : 5 days (8hrs)

¾ PDUs granted : 40

¾ Course Material : Primavera Reference guide & workbook

¾ Trainer : Deputed from India ; Primavera Authorised

Training centre

Primavera 6 course at CADD Centre - Benefits

¾ CADD Centre is the Authorised Training Partner for Primavera in India. The certificate issued will have the “Primavera Authorised Representative” Logo

¾ CADD Centre is the PMI authorized “Registered Education Provider” (R.E.P) in India and the certificate issued will have the PMI REP logo

¾ 40 PDUs (Professional Development Unit) will be granted. PDUs are required for a person take up the PMP examination from PMI (Project Management Institute), USA

(3)

3 / 10

DAY WISE CURRICULUM Day 1

¾ Introduction to Project Management Concepts

¾ Project Management processes

¾ Project Knowledge Areas

OBS (Organizational Breakdown Structure) ¾ Different Views

¾ To create new OBS

¾ Restrictions

EPS (Enterprise Project Structure) ¾ Different views

¾ To Create new

¾ Assigning the responsible manager

¾ Difference between EPS & OBS

Projects

¾ Overview of the Project

¾ Creation of new project through wizard

¾ Creation of new project through details

¾ Calendar Global, Resource, Project

¾ New Calendar

¾ Modification, Copying holidays from global.

¾ Making a Project or resource Calendar as global

¾ Assigning a Calendar as default for the projects

Day 2

¾ Entering Activities through Wizard

¾ Entering Activities through details

¾ Explore the use of duration format including sub unit

¾ Mile Stones, Activity Type

¾ Inserting a new Column

¾ Moving the Columns

¾ Time Scale adjustments

¾ Different kind of relationship between tasks

¾ Different methods of linking

¾ Estimating the project finish date

¾ Identifying the project critical path

¾ Editing the task links

¾ Applying different calendars to activities & Estimating the finish date

(4)

4 / 10 Constraints in a Project

¾ Different types of Constraints

¾ Use of Secondary Constraint

Work Breakdown Structure (WBS) ¾ What is WBS

¾ Example for WBS

¾ Defining WBS Structure

¾ Applying WBS for tasks

Activity Codes

¾ Code Definition

¾ Assigning Code and Organizing

¾ Reorganizing

Project Codes

¾ Code Definition

¾ Assigning Code and Organizing

¾ Reorganizing

Resource Codes ¾ Code Definition

¾ Assigning Code and Organizing

¾ Reorganizing

Day 3

Work Products & Documents ¾ Defining WPs & Docs

¾ Difference between WP & Doc

¾ Assigning it for activities

Currency

¾ To change the currency

¾ To create new Currency

¾ Setting exchange rate

(5)

5 / 10 Roles

¾ Importance of Roles

¾ Defining the roles

¾ Giving rates for the roles

Resource Sheet Preparation

¾ Defining Resource through Wizard

¾ Defining Resource through detail

¾ Defining Resource through Calendar

¾ To create a new unit of Measure for materials, which are not available in the list.

Resource Assigning ¾ Through add roles

¾ Through add resources

Day 4

¾ Resources Analysis

¾ Resource Usage Profile

¾ Resource Usage Spread Sheet

¾ Resource Curves

¾ Resource Leveling

¾ Concepts of Stretching, Crunching & Splitting – Manual

¾ Automatic Leveling

Updating Progress ¾ Setting Database

¾ Entering Actual Start & Actual Finish date for tasks

¾ Updating through duration

¾ Updating through Physical % Complete

¾ Updating through Units

¾ Updating Cost

¾ Comparative Study of Baseline and Actual Plan

(6)

6 / 10 Day 5 ¾ Filter ¾ Global Change ¾ Reports ¾ Tabular ¾ Graphical ¾ Import / Export ¾ Formatting Bars

¾ User defined fields

¾ Methodology Management

---

(7)

7 / 10

Consultant Profile: Mr. Vidya Shankar M.N

Mr. VidyaShankar M.N is a graduate in Mechanical Engineering from Bangalore University in the year 1999 & Completed PG Diploma in Business Administration. Pursuing M. Tech on Product Design & Manufacturing.

He has hands on experience of 8 years in training & New Product development

Technical expertise:

3D Modeling Package : Pro/E W.F 3.0, CATIA V5, Solid Edge

Analysis Tools : Ansys, Msc.Nastran Project Management Tools : Microsoft Office Project, Primavera Project Planner

2D Drafting Package : AutoCAD, CADian

Career Profile:

CADD Centre Training Services Pvt. Ltd.,

November’99 – Till Date CADD Centre, Bangalore

Designation: Product Manager - AEC Responsibilities:

¾Leading a team of CADD Engineers & Project Engineers.

¾Providing Technical Support in implementing new product.

¾Giving seminars / handling corporate customers

¾Conducting training programmes and providing solutions using CAD & CAE tools

(8)

8 / 10

¾Developing a corporate team for training and projects on CAD/CAE/project Management.

¾Conducting Product Demonstration for institutions & corporate.

¾Trained over 600 engineers from different disciplines.

¾10000 hrs of instructional experience.

¾Has actively involved in technical presentation of various CAD & Project Planning & Management software’s at colleges and companies.

List of Corporate Trained / Program highlights:

• HCL – The requirement was on imparting quality knowledge to their engineers on CAD & CAE to make them more productive. The training was on both the theoretical and practical application of Pro/Engineer & Ansys tools.

• HPPL – HPPL was looking for migrating from traditional Drafting to the usage of AutoCAD. The training was conducted on 2D Drafting, Productivity Tools & 3D Modeling using AutoCAD. In addition to training AutoCAD was implemented at their place with continuous technical support.

• BHEL – BHEL had recruited fresh engineering graduates countrywide and the expectation was to train these engineers on CAD/CAM - Theory and Practice & Introduction to the various packages in Mechanical packages. The training also included the Basics of Project Planning & Management.

• TVS – This was training on MSC.Nastran for Windows. The training included basics of FEM & solving Linear Static, Vibration & Buckling problems using MSC.Nastran for Windows. Also

(9)

9 / 10

assistance was provided in managing a project using MSC.Nastran for Windows.

• HAL – MSC.Nastran for Windows training was conducted for managers. Post training technical support was also provided. • MICO – The training requirement was on Mechanical Desktop

package. MICO was using MDT for all their Advanced Modeling. During the training program, the various challenges MICO faces in their projects were addressed.

• Bosch – This was a typical requirement. The training was on ANSYS E mag for their Managers. Post training, implementation of the software for their projects was done and technical support was provided till the end of the project.

• SKF bearings Ltd – Pro/E training was done. Also it included scheduling of their projects using Pro/E. CADD Centre, Bangalore & SKF was in a loop till the end of the project completion. At various stages, Technical support was provided for successful completion of the project.

• Triveni Engineering – Pro/E training on Advanced Modeling and implementation of the software was done post training.

• Volvo – CATIA Training was conducted for Engineers in Volvo. As Volvo had already had projects in CATIA, scheduling was done.

• Madura Garments – Project Planning & Management training was conducted to the engineers and managers. The training included PPM concepts and the tool. Post training, planning and scheduling was done for the projects.

(10)

10 / 10

• Hindustan Motors – MSC.Nastran for Windows training was conducted. Post training, “Analysis of bus shaft” was successfully completed.

• Tally Solution - Project Planning & Management training was conducted to the top management. The training included PPM concepts and the tool.

• Novellus – Pro/E WF 3.0 training was conducted for engineers at Novellus. This training also involved procedures for handling Pro/E projects. Also planning, scheduling & monitoring the progress of the projects was also included in the training sessions which enabled their engineers to be ready for handling the projects with immediate effect.

• Flow serve – Project Planning & Management training was conducted for their engineers on Concepts & Tool (Primavera). Post training, planning and scheduling of the projects was assisted with continuous support.

• Brakes India Limited – Training on Primavera was conducted for engineers. Post training, a test was conducted for all the

participants. Planning & Scheduling of the projects was also done. • L&T – Project Planning & Management training was done for the

engineers and the training included PPM concepts and Primavera tool.

References

Related documents

Furthermore, water availability data of a specific region would help validate this process via informed simulation models, developed in conjunction with subject matter experts from

Fasting is contraindicated in pa- tients with poorly controlled type 1 diabetes, includ- ing those with a history of severe hypoglycemia and/ or diabetic

(7) (Spatial restricted three-body problem) From the above discussion and [ MvK ], we gather: the only standing obstruction for applying the above result to the spatial

City-wide PM City Scorecards Outcomes, indices Surveys, benchmarking Organisational PM Departmental Scorecards Input, process, output Impact Audit Reports Individual PM

This is to be contrasted with end- to-end measurements (typically data transfers or data access over the WAN) that include the effects of the end-hosts and the

• Niche devices for power electronics applications, such as BJTs (Bipolar-Junction Transistors), SITs (Static lnduction Transistors), MCTs (MOS-Controlled Thyristors), and

Exotic Armour Proficiency Armour Proficiency (light), base attack bonus +1 No armour check penalty on attack rolls, and gain special exotic benefits.. Eye Candy Cha 13 Creatures

The technical potential for variable renewable electricity generation in Czechia is more than twice as high as the estimated electricity consumption in 2030, which constitutes