NIPS COLLEGE OF IT
AND
MANAGEMENT
ALLAHABAD
[Synopsis
[Synopsis
[Synopsis
[Synopsis and
and
and
and Project Guidelines]
Project Guidelines]
Project Guidelines]
Project Guidelines]
MCA-6
th
Semester
BCA-6
th
Semester And
PGDCA-2
nd
Semester
IMPORTANT DATE
Synopsis Approval Last Date : 21/5/2012
Project Submission Date
: 30/07/2012
IMPORANT INFORMATION
MCA-6
thSem Project Coordinator
: Mr.Deepak Mishra
PGDCA-2
ndSem Project Coordinator
: Mr.Arun Kumar Maurya
BCA-6th Sem Project Coordinator
: Mrs Seema Srivastava And
: Mr.Sanjeev Dwivedi.
NIPS COLLEGE OF IT & MANAGEMENT,ALLHABAD PH: 0532-3291133
1
MCA-6
th
BCA-6
th
& PGDCA-2
nd
Synopsis Format
1. Introduction Of Project
2. Objective Of The Project
3. Scope Of The Project
4. Project Plan
5. The Existing System
6. Background Of The Organization
7. Current Problems
8. Areas For Improvement
9. Proposed System
10. Input/Output Requirement
11. Hardware And Software Requirement
12. Database Requirement
13. System Design
14.Tables And Fields For Database
15. Database Dictionary
16. E-R Diagram
17. “0” Level DFD
18. “1” Level DFD
19. Security Control
20. Future Scope Of The Project
NIPS COLLEGE OF IT & MANAGEMENT,ALLHABAD PH: 0532-3291133
2
22.Reference Or Bibliography
Some Suggested Project Title
1. Bank Transactions Management
2. Hotel Management
3. Gas Agency Management
4. Office Automation
5. Railway Reservation
6. Computerization Course Registration
7. Hostel Management
8. Hospital Management
9. Inventory Management
10. Competitive Examination Database
11. Air Line Reservation
12. Transport Management
13. College Admission
14. Library Management
15. On Line Examination
16. Social Networking Sites
17. E-Shopping System
18. E-Mailing System
NIPS COLLEGE OF IT & MANAGEMENT,ALLHABAD PH: 0532-3291133
3
BCA-6
th
& PGDCA-2
nd
Project Report Format
1. Title Cover
2. Certificate from organization about your stay (Project Duration) at that place and about submission of work done under external guide at the place of training.
3. Certificate from your guide about the submission of work done under his/her guidance, Internal Supervisor.
4. Table of Contents, abstract of the project (abstract of actual work done).
5. A brief overview of the organization (regarding function area, location, division in which you are working, turnover)
6. Profile of problems assigned.
7. Study of existing system, if any.
8. System requirements 9. Product Definition 10. Problem Statement 11. Function to be Provided 12. Processing Environment: H/W, S/W. 13. Solution Strategy 14. Acceptance Criteria 15. Feasibility Analysis 16. Project Plan 17. Team Structure
NIPS COLLEGE OF IT & MANAGEMENT,ALLHABAD PH: 0532-3291133
4
18. Development Schedule19. Programming Languages And Development Tools
20. System Requirement Specifications
21. Developing / Operating / Maintenance Environments
22. External Interface And Data Flows
23. User display and report format, user command summary
24. High level DFD and data dictionary
25. Functional and performance specifications
26. Design
27. Detailed DFD’s and structure diagrams
28. Data structures, database and file specifications
29. Pseudo code
30. Test Plan
31. Functional, Performance, Stress tests etc.
32. Implementation / Conversion Plan
33. Project Legacy
34. Current status of project
35. Remaining areas of concern
36. Technical and managerial lessons learnt
37. Future recommendations
38. Bibliography
39. Source Code
Note: - The above is meant to serve as a guideline for preparation of your project report. You may add to, modify or omit some of the above-mentioned points depending upon
NIPS COLLEGE OF IT & MANAGEMENT,ALLHABAD PH: 0532-3291133
5
their relevance to your project. You may also consult your internal supervisor for the same.
Viva of Full syllabus studied under BCA/PGDCA course.
MCA-6
th
Semester
Project Report Format
1. Title Cover
2. Certificate from organization about your stay (Project Duration) at that place and about submission of work done under external guide at the place of training.
3. Certificate from your guide about the submission of work done under his/her guidance, Internal Supervisor.
4. Table of Contents, abstract of the project (abstract of actual work done).
5. A brief overview of the organization (regarding function area, location, division in which you are working, turnover)
6. Profile of problems assigned.
7. Study of existing system, if any.
8. System requirements
NIPS COLLEGE OF IT & MANAGEMENT,ALLHABAD PH: 0532-3291133
6
b. Product Definition c. Problem Statement d. Processing Environment: H/W, S/W. e. Solution Strategy f. Acceptance Criteria 9. Feasibility Analysis 10. Project Plan a. Team Structure b. Development Schedulec. Programming Languages And Development Tools
11. System Requirement Specifications
a. Developing / Operating / Maintenance Environments b. External Interface And Data Flows
c. User display and report format, user command summary d. High level DFD and data dictionary
e. Functional and performance specifications
12. Design Phase
a. Detailed DFD’s and structure diagrams
b. Data structures, database and file specifications c. Pseudo Code
13. Test Plan
a. Functional, Performance, Stress tests etc.
14. Implementation / Conversion Plan a. Project Legacy
NIPS COLLEGE OF IT & MANAGEMENT,ALLHABAD PH: 0532-3291133
7
c. Remaining areas of concern
d. Technical and managerial lessons learnt e. Future recommendations
15. Bibliography
16. Source Code
Note: - The above is meant to serve as a guideline for preparation of the project report. The students may add to, modify or omit some of the above-mentioned points depending upon their relevance to the project and with the consultation of the project guide for the same. Joint project will be allowed and joint project report will be also being accepted.
In case of Joint Project the team should not consist of more than 3 members. Individual project will be recognized and the student should highlight their contribution in a joint project report.
Viva of Full syllabus studied under MCA course.
THE
THE
THE