Experience
Clean Water Studies
Reservoir Chonchi. Intake works constructionConchi (2000) Concession zone expansion in Calama
Calama (2000) Diego de Almagro main water pipe cadastre
Chañaral (1995) Water improvements and quality analysis
Inca de Oro (1996-1997) Main water pipe diagnostic Copiapó – Caldera – Chañaral (1995) Construction of water supply system
Chañaral (1999-2000) Implementation of Wells P4 Charravata
Quillota (1996-1997) Water production system improvement
Quillota.
Implementation of Wells in Charravata and pumping pipe (1998) Course modification of Aqueduct Peñuelas
Peñuelas (1998) • 1 • 2 • 3 • 4 • 5 • 6 • • 8 • 9 1 2 3 4 56 7 8 9 • 7
Experience
Clean Water Studies
Rehabilitation and system installation of Rural Water Group 1Los Maitenes – El Higueral – Las Coimas – Rinconada de Guzmanes – Santa Teresa – Los Loros (1996-1997) Rehabilitation and system installation of Rural Water Group 2
La Laguna – El Rungue – La Greda – Bolonia – Lo Rojas Pocochay (1996-1997) Hydraulic Design Sites 1-2-3 Port of
Valparaíso (1995) Sanitary Infrastructure Pre-feasibility of Fundo (big extension of land) Santa Julia Poniente - Reñaca (1998) Sanitary Infrastructure Pre-feasibility of Fundo (big extension of land) Santa Julia Oriente - Reñaca (1998) Engineering design for water pressure pipe and tank Paso Hondo Sector - Quilpué (2000) Infrastructure Profile “Ex Hacienda Las 7 Hermanas”
Viña del Mar (1996) New Tank and Water Filter Plant improvement Project
Putaendo (1992-1993) • 10 • 11 • 12 • 13 • 14 • 15 • 16 • 17 10 11 121314 15 16 17
Experience
Clean Water Studies
Water Services Improvement of Cabildo, Petorca, Cachagua,San Isidro y Chincolco (2000) Water Improvement conceptual engineering
Sectores Héroes Del Mar, Cañería de Alta y Chorrillos (2002) Primary Infrastructure Planning. Development Program
Urbano Alto Valparaíso – Placilla (1991-1992) Engineering Design for Water System Improvement
Quintero (2001) Water Development Plan in the southern cost
San Antonio a Algarrobo (1991-1992) Water main pipe reinforcement San Sebastián-Las Cruces-El Tabo-Isla Negra. 5th Región (1994) Water Pump Station
Cartagena (1994) Water System Improvement
Algarrobo (1994) (repetida)Plan de Desarrollo de Agua Potable del Litoral Sur
San Antonio a Algarrobo (1991-1992)
• 18 • 19 • 20 • 21 • 22 • 23 • 24 • 25 • 26 1819 2021 22 23 24 25 26
Experience
Clean Water Studies
Water System integrated improvementTalagante (1996-1998) Water System integrated improvement
Pomaire (1998) Water System integrated improvement
Calera de Tango (1998) Water and Sewage Systems Development Plan
Maipú (1991-1992) Water System improvement design
Los Queñes (1999-2000) Water System improvement design
Gualleco (1999-2000) Construction of water tank
Coronel (2001) Construction of Water main pipe reinforcement
Quirihue (1999-2000) Water System integrated improvement
Carahue (1995) • 27 • 28 • 29 • 30 • 31 • 32 • 33 • 34 • 35 2728 29 3031 32 33 3435
Experience
Clean Water Studies
Water, Sewage and Waste Water Treatment ConcessionLabranza, 9th Region (1999-2000) Technical Certification of ESSAR (Sanitary Utility Company)
9th Region (2000) Water, Sewage and Waste Water Treatment Concession
Pillanlelbún, 9th Region (2000-2001) Tourism Development Project of Coique’s Bay
Lago Ranco (1992-1993) Infrastructure Project 1st Step Condominium in
Lago Ranco (1994) Water Construction Project El Tabo
Isla Negra (1994) Alfa-Curauma Project (land development)
Curauma (1995) Inter-Counties Plan of Valparaíso – Advisory to Sanitary Works, 5th Region (1995) Sizing and value study for ESVAL’ Investments
5th Region (1999) 36 36 37 • • • 37 • • • 38 • • • 38
Experience
Sewage Studies
Engineering design of sewage systemAlto Hospicio, Iquique (1999-2000) Interceptor System, pumping and transport
Tocopilla (1997-1998) Study of Operational Expansion zone
Calama (1998-1999) Interceptor System, pumping and transport
Tal-Tal (1996-1997) Network, interceptors, pumping and transport
Caldera (1991-1992) Network, interceptors, pumping and transport
Calderilla (1991-1992) Network, interceptors, pumping and transport
Bahía Inglesa (1991-1992) Sewage system diagnostic and network cadastre
Huasco (1992-1993) Network, Treatment and Disposal
Huasco Bajo (1998) • 1 • 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 1 2 3 4 5 6 7 89
Experience
Sewage Studies
Course modification of main sewage pipe ReñacaViña del Mar (1993) Infrastructure profile of Ex-Hacienda Las 7 Hermanas
Viña del Mar (1996) Sanitary Infrastructure Pre-feasibility of Fundo Santa Julia - Oriente Reñaca (1998) Sanitary Infrastructure Pre-feasibility of Fundo Santa Julia - Poniente – Reñaca (1998) Main pipe design, sections 2 & 3 Gómez Carreño Viña del Mar (2000) Sewage main pipe design. Paso Hondo Sector
Viña del Mar (2000) Engineering Project for Sanitary Services. 1st Step. Zeqi, Las 7 Hermanas, Viña del Mar
Network extension and improvement, Quebrada Phillipi
Valparaíso (1995-1996) Network extension and improvement, Argentina Avenue,
Valparaíso (1995-1996) 10 11 10 11 • • • • • • • • •
Cabritería sewage main pipe project
Valparaíso (1993-1994) Feasibility study of Sewage, Rain Water and Roads
Valparaíso - Placilla (1991-1992) Sewage main pipe design Las Américas, Upper section - Valparaíso
Sewage development plan of Southern cost
Quinta Región (1993) Sewage system design and Waste Water preliminary treatment
San Antonio, El Tabo y El Quisco (2001-2002) Sewage development plan of Maipú
Región Metropolitana (1991-1992) Extension of the sewage system
La Florida – Región Metropolitana (1998) Network cadastre and main pipe and facultative lagoons design
San Francisco de Mostazal (1992-1993) Network, interception pipes and pumping stations design
Boca de Rapel (1995-1996) • 19 • 20 • 21 • 22 • 23 • 24 • 25 • 26 • 27 19 20 21 22 23 2425 26 27
Experience
Sewage Studies
Network, interception pipes and pumping stations design
Coya (1995-1996) Network, interception pipes and pumping stations design
Pichilemu (1995-1996) Sewage system implementation
Quinta de Tilcoco (1993) Network, pumping station and main pipes design
Rauco (1997-1998) Network, interception pipes and pumping stations design
Coronel Norte (1992-1993)
Network, interception pipes and pumping stations
Lota (1995-1996) Sewage system improvement of
Chiguayante (1999) Sewage system improvement of Talcahuano
Península de Tumbes (1999) Sewage pumping stations design, North Sector
Laja (2000) • 28 • 29 • 30 • 31 • 32 • 33 • 34 • 35 • 36 28 2930 31 32 3334 35 36
Experience
Sewage Studies
Network, pumping stations and treatment works design
Renaico (2000-2001) General interception pipe and pumping stations design
Temuco (2001) O’Higgins pipe rehabilitation and network reinforcement
Temuco (2001) Water and sewage concession of Pillanlelbún
9th Region (2000) Sewage improvement and waste water treatment
Paillaco (1994-1995) Full infrastructure design for Tourism Development
Bahía de Coique – Lago Ranco (1992-1993) Network, pumping stations and disposal pipe design
Puerto Montt (1995-1996) Network, pumping stations and disposal pipe design
Ancud (1995-1996) Network, pumping stations and disposal pipe
Castro (1995-1996) • 37 • 38 • 39 • 40 • 41 • 42 • 43 • 44 • 45 37 3839 40 4142 4344 45
Experience
Sewage Studies
Network, pumping stations and disposal pipe design
Chaitén (1996-1997) Network, pumping stations and disposal pipe design
Puerto Aysén (1993-1995) Network, pumping stations and disposal pipe design
Puerto Natales (1993-1995) Network, pumping stations and disposal pipe design
Punta Arenas (1992-1995) Network, pumping stations and disposal pipe
Porvenir (1993-1995) Sewage system design of Pelequén
6th Region Waste Water treatment system design of Northern Coronel and Waste Water treatment plant design of Southern Coronel
Coronel (2004) • 46 • 47 • 48 • 49 • 50 46 47 48 49 50 • 51 • 52 52 51
Experience
Sewage Studies
Experience
Marine outfalls and disposal studies Marine discharge of Desalination PlantArica (1998) Marine outfall of Tocopilla
Tocopilla (1997-1999) Water Quality study and Marine outfall conceptual engineering
Antofagasta (1986) Sewage system improvement and coastal sanitation
Tal-Tal (1996-1997) Water Quality study and Marine outfall conceptual engineering
Chañaral (1987) Water Quality study and Marine outfall conceptual engineering
Caldera (1991-1992) Base line study for marine outfall
Caldera y Chañaral (1999-2000) Marine outfall design
Huasco (1992-1993) Marine outfall construction study
Huasco (1998-1999) • 1 • 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 1 2 3 4 5 6 7 8 9
Sewage system, waste water preliminary treatment and disposal pipe design of San Antonio, El Tabo y El Quisco (1993) Sewage system improvement
Pichilemu (1995-1997) Waste water disposal study
Región el Bio-Bio (1995) Sewage system improvement
Base Naval - Talcahuano (1985) Sewage system feasibility study
Chiguayante – Concepción y Talcahuano (1995) Marine outfall study
San Pedro (1998) Sewage system improvement master plan
Coronel Norte (1992-1993) Sewage system improvement
Coronel (2003) Marine outfall environmental impact assessment
Coronel - Lota (1997) • 10 • 11 • 12 • 13 • 14 • 15 • 16 • 17 • 18 10 11 12 13 1415 16 1718
Experience
Sewage system improvement
Lota (1995-1996) Marine outfall alternative analysis
Arauco (2004) Marine outfall study
Lebu (1998) Sewage system improvement and disposal pipe design
Puerto Montt (1995-1996) Sewage system improvement and disposal pipe design
Ancud (1995-1996) Sewage system improvement and disposal pipe design
Puerto Aysén (1993-1995) Waste Water treatment plant construction
Castro (1995-1996) Sewage and rain water systems improvement
Puerto Natales (1993-1995) Sewage system improvement
Punta Arenas (1992-1995) Sewage and rain water systems improvement
Porvenir (1993-1995) • 19 • 20 • 21 • 22 • 23 • 24 • 25 • 26 • 27 • 28 19 20 21 22 23 24 25 26 27 28
Experience
Waste Water treatment system engineering design of Northern Coronel and Waste Water treatment plant of Southern Coronel
Coronel (2004) Full sanitation of Los Vilos
Los Vilos (2005) Waste Water preliminary treatment and disposal pipe design
Constitución (2005) • 29 • 30 • 31 29 31 30
Experience
Experience
Tariff Studies and Economic Evaluation Marine OutfallTocopilla (1997-1998) Operational Territory Expansion
Calama (1998-1999) Sewage Improvement And Coastal Sanitation
Tal-Tal (1996-1997) Marine Outfall
Caldera (1991-1992) Network, Transport and Pumping Stations
Calderilla (1991-1992) Network, Transport and Pumping Stations
Bahía Inglesa (1991-1992) System Improvement and Water Quality Analysis
Inca de Oro (1996) Marine Outfall Huasco (1992-1993) Sewage Network Huasco Bajo (1998) • 1 • 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 1 2 3 4 5 6 7 8 9
Experience
Tariff Studies and Economic Evaluation New Village Infrastructure PlanningValparaíso-Placilla (1991-1992) Sewage Master Plan
Gran Valparaíso (1991-1993) Water Supply Final Design, Rural Groups 1 y 2
Vth Región (1996) Water Production Improvement, Quillota
Charravata (1996) Sewage System Extension
La Florida – Región Metropolitana (1998) Sewage Master Plan, Maipú
Región Metropolitana (1991-1992) Water Supply System Improvement
Pomaire (1996) Water Supply Improvement
Talagante (1996) Sewage Master Plan, Coastal Cities Southern Part of the Region Vth Región (1991) • 10 • 11 • 12 • 13 • 14 • 15 • 16 • 17 • 18 1011 1213 14 15 16 17 18
Experience
Tariff Studies and Economic EvaluationInvestment Plan for Water Utilities, Coastal Cities Sothern Part of the Region
Vth Región (1993) Sewage Project and Stabilization Ponds Design
San Francisco de Mostazal (1992-1993) Sewage Treatment and Network Design
Boca de Rapel (1995-1996) Sewage Treatment and Network Design
Coya (1995-1996) Sewage System, Waste Water Treatment and Marine Outfall
Pichilemu (1995-1996) Sewage System Design
Quinta de Tilcoco (1993) Sewage System Improvement
Rauco (1997-1998) Sewage Master Plan
Coronel Norte (1992-1993) Sewage System Improvement
Concepción II Etapa (1994) • 19 • 20 • 21 • 22 • 23 • 24 • 25 • 26 • 27 1920 2122 23 24 25 26 27
Experience
Tariff Studies and Economic EvaluationSewage Network and Waste Water Treatment Plant
Lota (1995-1996) Sewage System Improvement and Extension
Renaico (1994-1995) Water Supply Design
Carahue (1994-1995) Feasibility Study for Waste Water Treatment Plant
Temuco (1992-1993) Water a Sewage Systems Concession, Labranza
IX Región (1999) Waste Water Treatment Plant and Sewage Network Design
Paillaco (1994-1995) Infrastructure for a New Village, Ranco Lake
Bahía de Coique-Lago Ranco (1992-1993) Sewage Improvement, Treatment and Sea Outfall
Puerto Montt (1995-1996) Sewage Improvement, Treatment and Sea Outfall
Ancud (1995-1996) • 28 • 29 • 30 • 31 • 32 • 33 • 34 • 35 • 36 2829 3031 3233 34 35 36
Experience
Tariff Studies and Economic Evaluation Sewage improvement, Treatment and Sea OutfallCastro (1995-1996) Sewage Improvement and Treatment Plant Design
Chaitén (1996-1997) Waste Water Treatment Plant Design
Puerto Aysén (1993-1995) Sewage and Drainage System Design
Puerto Natales (1993-1995) Sewage Improvement, Treatment an Sea Outfall Design
Punta Arenas (1992-1995) Sewage Improvement, Treatment and Sea Outfall Design
Porvenir (1993-1995) • 37 • 38 • 39 • 40 • 41 • 42 37 38 39 40 41 42
Experience
Environmental Impact Assessment
Sea Outfall Design for Desalinization PlantArica (1998) Sewage Sea Outfall
Tocopilla (1997-1998) Sea Outfall and Water Quality Assessment
Antofagasta (1986) Sewage Sea Outfall Design
Taltal (1996-1997) Sewage System and Sea Outfall
Chañaral (1987) Sewage System and Sea Outfall
Caldera (1991-1992) Base Line Assessment of the Bay
Chañaral (2000) Base Line Assessment for Sea Outfall
Caldera (2000) Sewage Sea Outfall Design
Huasco (1992-1993) • 1 • 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 1 2 3 4 5 6 78 9
Experience
Environmental Impact Assessment
Sewage Network SystemHuasco Bajo (1998) Rosas Bay Planning
Algarrobo (2000) Sewage System, Treatment and Sea Outfall Design
Litoral Sur Quinta Región (2001) Sewage System, Treatment and Sea Outfall Design
Pichilemu (1995-1998) Sewage System Improvement
Rauco (1997-1998) Navy Facility Sea Outfall
Talcahuano (1998) Sewage Sea Outfall
San Pedro (1998) Sewage System, Treatment and Sea Outfall Design
Lota (1995-1996) Sewage Sea Outfall
Lebu (1998) • 10 • 11 • 12 • 13 • 14 • 15 • 16 • 17 • 18 10 11 12 1314 15 1617 18
Experience
Environmental Impact Assessment
Waste Water Treatment Plant
Temuco y Padre Las Casas (2000) Sewage System, Treatment and Sea Outfall Design
Puerto Montt (1995-1996) Sewage System and Treatment Design
Ancud (1995-1996) Sewage System and Treatment Design
Castro (1995-1996) Waste Water Treatment Plant
Puerto Aysén (1993-1995) Sewage and Drainage System, Waste Water Treatment Design
Puerto Natales (1993-1995) Sewage System, Treatment and Sea Outfall Design
Punta Arenas (1992-1995) Sewage System, Treatment and Sea Outfall Design
Porvenir (1993-1995) Drainage System Porvenir (1993-1995) • 19 • 20 • 21 • 22 • 23 • 24 • 25 • 26 19 20 21 22 23 24 25 26 • 27 27
Experience
Environmental Impact Assessment
Industrial Waste Water AssessmentPuerto Natales
Industrial Waste Water Assessment
Punta Arenas (2000) Industrial Waste Water Assessment
Porvenir (2000) • 28 28 29 30 • 29 • 30
Experience
Hydraulic Studies
Water Resources Improvement for Mining Process, Copper Company, El Salvador. (2000) Hydraulic Studie for El Membrillo RiverAlgarrobo (2000) Drainage System Master Plan
Villa Alemana, Quilpue, Viña del Mar. (1998-2001) Drainage System Master Plan
Valparaíso, Placilla, Curauma y Laguna Verde. (2000-2002) Drainage System, Portales Creek,
Valparaíso. (2001) Drainage System Master Plan,
Talcahuano. (2001 - 2002) Drainage System Master Plan
San Pedro. (2001 - 2002) Drainage System Master Plan
Chiguayante. (2001 - 2002) • 1 • 2 • 3 • 4 • 5 • 6 • 7 • 8 1 2 3 4 5 6 7 8
Experience
Hydraulic Studies
Drainage System Final Design, Barrios BajosValdivia. (2002) Main Collector Clemente Escobar
Collector Estero Catrico
Collector Yerbas Buenas
Collector Santiago Bueras
Colector Phillipi
Drainage System Final Design. Etchevers y Limonares
Viña del Mar (2003) Drainage Collector La Serena – Las Industrias, Zanjón de la Aguada, Basic Engineering
Santiago (2004) Drainage System Economic Evaluation, Gran Avenida,
Santiago(2003) Drainage Master Plan
Pudahuel (2004) Collector Final Design
San Pablo (2004) • • 10 • • 9 10 11 • • • • • 9 11 • •
Experience
Waste Water Treatment
Waste Water Treatment PlantTocopilla (1997-1998) Waste Water Treatment Plant
Taltal (1996-1997) Stabilization Ponds Design
Caldera (1991-1992) Stabilization Ponds Design
Calderilla (1991-1992) Stabilization Ponds Design
Bahía Inglesa (1991-1992) Waste Water Treatment Plant
Huasco Bajo (1998) Waste Water Treatment Plants. Master Plan
Gran Valparaíso (1992) Waste Water Treatment Plants Design
San Felipe y Los Andes (2001) Waste Water Treatment Plants Design
San Antonio, El Tabo y El Quisco, V Región (2001-2003) Stabilization Ponds Design
San Francisco de Mostazal (1992-1993)
• 1 • 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 1 2 3 4 5 6 7 8 9 • 10 10
Experience
Waste Water Treatment
Aerated Lagoons DesignBoca de Rapel (1995-1996) Extended Aeration Treatment Plant
Coya (1995-1996) Stabilization Ponds Design
Quinta de Tilcoco (1993) Waste Water Treatment Plant
Pichilemu (1995-1996) Waste Water Treatment Plants for Six Cities. Extended Aeration
VII Región (2002-2003) Sewage Treatment Feasibility Study
Chiguayente, Concepción – Talcahuano (1994-1995) Sewage Treatment Feasibility Sutdy
San Pedro (1997-1998) Sewage Treatment Feasibility Study
Coronel Norte (1992-1993) Waste Water Treatment Plant
Lota (1995-1996) Waste Water Treatment Plant
Lebu (1997-1998) • 11 • 12 • 13 • 14 • 15 • 16 • 17 • 18 11 12 13 14 15 16 1718 • 19 • 20 19 20
Experience
Waste Water Treatment
Stabilization Ponds DesignRenaico (1994-1995) Waste Water Treatment Plant Feasibility Study
Temuco (1992-1993) 34 Cities Feasibility Study for Waste Water Treatment Plants ESSAR Utility Temuco (2000) Extended Aeration with Nutrients Removal. Basic Engineering Villarrica Lake, Pucón (1996) Stabilization Ponds Design
Paillaco (1994-1995) Stabilization Ponds Design
Coique (1993) Waste Water Treatment Plant Design and Aerated Lagoons Design
Puerto Montt (1995-1996) Activated Sludge Feasibility Study
Ancud (1995-1996) Activated Sludge Feasibility Study
Castro (1995-1996) Stabilization Ponds Design
Chaitén (1996-1997) • 21 • 22 • 23 • 24 • 25 • 26 • 27 21 2223 24 25 26 27 • 28 • 29 • 30 28 29 30
Experience
Waste Water Treatment
Aerated Lagoons DesignPuerto Aysén (1993) Extended Aeration Treatment Plant Design
Puerto Natales (1993-1995) Treatment Plant Design
Punta Arenas (1992-1995) Treatment Plant Design
Porvenir (1993-1995) Treatment Plant Design
Los Vilos (2005) Activated Sludge Treatment Plant. Feasibility Study
Constitución (2005) Activated Sludge El Teniente Mining Company
Rancagua (2003) Aerated Lagoons with Disinfection for Reuse
Caldera (2002) Treatment Plant Design
Coronel (2004) • 31 • 32 • 33 • 34 31 32 33 34 • 35 • 36 • 37 • 38 • 39 35 37 36 38 39
Experience
Port Engineering
ARICA PORT AUTHORITY
Master Plan (1998) Investment Plan (1998) Concession Model (1999) Bid for Operation Services (1999) Improvement Design Criterions (1999) Infrastructure Conservation Design Criterions (1999) Basic Services Associated with Concession Model (1999) Conceptual Engineering for the Port Development (1999) Conceptual Engineering for the Bulk Terminal (1999) Elements for the New Master Plan (2000)
1 1 • • • • • • • • • •
Experience
Port Engineering
IQUIQUE PORT AUTHORITY
Master Plan (1998) Basic Engineering for the Central Pier Extension (1999) Lay Out Alternatives Study (1999) Conceptual Engineering for the Port Development (1999) Gottwald Crane Operational Analysis (1999) Environmental Monitoring (2003) Fill Up Feasibility Study. Boats Club (2003)
MEJILLONES PORT COMPANY
Operational Lay Out Design Mejillones (1999) Operational Analysis. Mejillones (2000)
2 3 2 3 • • • • • • • •
Experience
Port Engineering
ANTOFAGASTA PORT AUTHORITY
Preliminary Master Plan (1998) Master Plan (1999) Investment Plan (1999) Investment Projects Year 2000 (2000) Master Plan and Investment Plan Actualization (2001) Soils Mechanic Study Supervision (2001) Bulk Terminal, Water Front Nº 3 (2001)
VALPARAISO PORT AUTHORITY
Master Plan (1998) Investment Plan (1998) Agitation Numerical Model (1998) Master Plan and Investment Plan Actualizations (2000) Bollard Design 8 Site(2000) Port Development Costs (2001) Port Development Alternatives. Yolanda-Barón Sector (2001) Bollard Design 7 Site (2001) Sewage System Design Barón Sector (2003) Engineering Supervision for Logistic Zone Design (ZEAL) (2004 – 2005) 4 5 4 5 • • • • • • • • • • • • • • • •
Experience
Port Engineering
SAN ANTONIO POR AUTHORITY
Master Plan (1998) Investment Plan (1998) Investment Plan Modifications (1998) Design Criterions for New Works and Improvements (1999) Interferences Analysis between Master Plan and Liquids Bulk Terminal (1999) Port Development to the South (Collaboration with Port Operation Consultants) (1999) Container Storage Capacity Analysis (1999) Operative Conceptual Design for Pier Dam (1999) Economic Evaluation for 2001 Projects (2000) South Development Analysis (2001)
SAN VICENTE - TAKCAHUANO PORT AUTHORITY
Gottwald Crane Operational Study (2000) Reference Terms Elaboration for Soil Mechanic Study, Site 1 Talcahuano(2000) 6 7 6 7 • • • • • • • • • • • •
Experience
Port Engineering
PUERTO MONTT PORT AUTHORITY
Master Plan (1999) (with Ingeconómica Ltda.) Final Design Fishermen Wharf Quellón, X Región (2003) Final Design Fishermen Wharf Niebla, X Región (2004)
CHACABUCO PORT AUTHORITY
Master Plan (1999) Investment Plan (1999) Operational Analysis for Passengers Transport (1999) Port Lay Out Modification (2000) Maneuvers Study and Marine Signaling (2001)
PUNTA ARENAS POR AUTHORITY
Master Plan (1999) (with Ingeconómica Ltda.)
8 9 10 8 9 10 • • • • • • • • •
Experience
Port Engineering
11
12
PORT WORKS DIRECCION
Ramps Detailed Engineering, Punta Delgada y Bahía Azul, Primera Angostura Estrecho de Magallanes, XII Region (2000) Port Infrastructure Improvement, Puerto Edén XII Region (2004) Ramps Detailed Engineering, Seno Ultima Esperanza XII Region (2005) Fishermen Wharf Final Design, Quellón, X Región (2003) Fisherman Wharf Final Design, Niebla, X Region (2005) Structural Assessment and Wharf Design, Maguellines, VII Region (2005)
CONCESSIONS COORDINATION – PUBLIC WORKS MINISTRY
Safety Standards and Service Levels. Marine Connectivity X Region (2004) 11 12 • • • • • • •
Experience
Work Supervision
Water and Sewage Works Supervision ( 2002 –2003)External Management “Design, Erection, Start Up and Initial Operation of 6 Waste Water Treatment Plants”. Yerbas Buenas, Retiro, Gualleco, Curepto, Putú, Los Queñes, VII Region (2003)
Work Supervision for the Fluorination Erection. 24 cities at the El Libertador Bdo. O´Higgins Region; Water Reservoir 300 m3, Lolol,
Colchagua (2004) • 1 • 2 • 3 1 2 3
Experience
Work Supervision
Civil works for the Fluorination Systems. Cities of : La Punta,Codegua, Coya, Rancagua, Graneros, Doñihue, Requinoa, Rosario y Otras (2003)
Electrical Works and Equipment Installation. Fluorination form Cities of the El Libertador Bdo. O´Higgins Region.
VI Región (2003)
Sewage Collector in Pichilemu
VI Región (2004)
Work Supervision, Start Up and Initial Operational Period. Waste Water Treatment Plant. Molina-Lontué, VII Región (2004)
• 4 • 5 6 • 7 4 5 • 6 7
Experience
Work Supervision
Water and Sewage Networks, more than 200 projects in severalcities of VI y VIII Regions (2005)
Waste Water Treatment Plant
Linares (2005) Waste Water Treatment Plants of Hualqui and Cabrero, VII Region (2005 - 2006) Water Reservoirs in 4 cities of VIII Region:
San Ignacio, Yumbel, La Florida, Coelemu (2005 - 2006)
Erection, Equipment Installation, Start Up, Initial Operation Period Wastewater Treatment Plant
Linares, VII Region (2005 - 2006)
• 8 • 9 8 • 10 • 11 • 12 8 9 10 11 12
Experience
Industrial Waste Water
Environmental Impact Assessment for Desalinization TreatmentPlant Discharge, Lluta Bajo.
Arica (1998)
Master Plan for Waste Water El Teniente Mining Company
Rancagua (2003)
Waste Water for the Fisher Sector Sea Outfall in Coronel
Coronel (2004)
Industrial Waste Water Assessment, XII Region
Puerto Natales (2000)
Industrial Waste Water Assessment, XII Region
Punta Arenas (2000) • 1 • 2 • 4 • 3 • 5 1 2 4 3 5
Experience
Mining and Industrial Sectors
Water Resources for Mining Process, Codelco Copper CompanyCalama.
Calama (2000)
Water and Waste Water Treatment Plant Studies, Codelco Copper Company. Calama.
Calama (2001)
Mining Waste Water Master Plan, El Teniente. Codelco Cooper Company.
Rancagua (2003)
Waste Water for the Fisher Sector Sea Outfall in Coronel
Coronel (2004)
Industrial Waste Water Assessment, XII Region
Puerto Natales (2000)
Industrial Waste Water Assessment, XII Region
Punta Arenas (2000) • 1 • 2 • 4 • 3 • 5 1 2 4 3 5 6 • 6
Experience
External Management – EPCM Projects
Engineering Supervision: "Design, Erection, Equipment Installationand Start Up for La Mochita Water Treatment Plant Extension”.
Concepción (2002)
External Management: “Design, Erection, Equipment Installation, Start Up and Initial Operation of Waste Water Treatment Plants”. Yerbas Buenas, Retiro, Gualleco, Curepto, Putú, Los Queñes
VII Region (2003)
Doñihue and Peralillo Waste Water Treatment Plants. EPCM
VI Region (2005) • 1 • 2 • 3 1 2 3