• No results found

Long-term safety and tolerability of open-label aripiprazole augmentation of antidepressant therapy in major depressive disorder

N/A
N/A
Protected

Academic year: 2020

Share "Long-term safety and tolerability of open-label aripiprazole augmentation of antidepressant therapy in major depressive disorder"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 2 Time to discontinuation of aripiprazole due to any reason during open-label treatment, safety sample.*Note: *Aripiprazole rollover patients had been exposed to aripiprazole for six weeks prior to open-label treatment.
Table 2 Treatment-emergent adverse events ($10% of patients, safety sample)
Figure 3 Time-course of fasting metabolic mean changes from baseline (observed case analysis)
Figure 4 Mean cgi-s scores by treatment week. Notes: Data by study week is from Oc analysis; week 52 LOcF data are also shown

References

Related documents

Once the server side priority will be defined based on trust analysis, the next work is to prioritize the clients based on the trust analysis.. User trust

The present study was carried out to evaluate the pre-school education components of Integrated Child Development Scheme (ICDS) in Barnala district of Punjab.. In

Conclusion: The most frequent underlying cause for recurrent and/or persistent pneumonia was pulmonary TB followed by congenital heart disease and cystic fibrosis among the

The windowpane oyster family Placunidae Rafinesque, 1815 with additional description of Placuna quadrangula (Philipsson, 1788) from India.. Rocktim Ramen Das, Vijay Kumar

In current study, methanolic extracts of field acclimatized Bacopa monnieri of BM-3, BM-5 and BM-6 were analyzed for their bacoside A composition and variation

Plant growth experiments conducted with tomatoes (Solanum lycopersicum, L.), in which the biomass of white LED-irradiated plants were compared to using both the natural

directions (Duplaquet3-DP), dynamic programming method based on Duplaquet using four search 259. directions (Duplaquet3-DP), and the dynamic programming methods from

The airport ground handling service (AGHS) equipment vendor selection (AGHSEVS).. problem is critical for ramp work safety management, because AGHS