• No results found

Can FOSS projects benefit from integrating Kanban: a case study

N/A
N/A
Protected

Academic year: 2020

Share "Can FOSS projects benefit from integrating Kanban: a case study"

Copied!
13
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1 Characteristics of story points and T-shirt sizes as estimating units as seen by team members
Fig. 1 The new workflow for the whole umbrella project

References

Related documents

A 1-percentage point increase in the group-specific unemployment rate is associated with a 0.13 percentage point decline in private coverage for people with less than a high

During the first phase of data collection, a series of informal discussions were organized with SMEs owners and general managing directors (MD) to assess the

Where the graphs for PV costs intersect with the graphs for grid cost / avoided cost electricity demand, the investment in PV under net-metering is

We have put a number of different solutions into place with Internexus in three cities around the UK, including high speed internet connection and managed voice services for

Motivated by these developments, we next explore the extent to which, controlling for the e¤ect of the crisis, changes in debt servicing costs a¤ect …rms’ employment

Real Time Data Stream Processing Engine Actuators Supervised Control Engine Decision Support

Professor Finn Thorbjørn Hansen, Aarhus University, Denmark Docent Kristian Klockars, Helsinki university.. PURPOSE: To deepen the understanding of the theory of science for

[21] systematically investigated the performance of a 3-foot ducted fan, considering geometric variations of expansion ratio, inlet lip shape, external duct shape, propeller