• No results found

THE TRANSITIONAL CHANGE ON THE IMPLEMENTATION OF ISO 14001:2015 IN COPPER ORE MILL – CASE STUDY

N/A
N/A
Protected

Academic year: 2020

Share "THE TRANSITIONAL CHANGE ON THE IMPLEMENTATION OF ISO 14001:2015 IN COPPER ORE MILL – CASE STUDY"

Copied!
13
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Conceptual Framework
Figure 2. Change management through continuous improvement and environmental management review
Table 1. Approach requirement of the EMS standard
Figure 3. Context of the organization in ISO 14001:2015.
+3

References

Related documents

This thesis examines local residents’ responses and reappraisal of a proposed and now operational biosolid (sewage sludge) processing facility, the Southgate Organic Material

Between 1950 and 1980 a few studies of past eruptions were published in international scienti fi c journals, but these were either focused on: the most recent 1957/8

The paper assessed the challenges facing the successful operations of Public Procurement Act 2007 and the result showed that the size and complexity of public procurement,

Because of the recommended procedure for evaluating reliability (and validity) is to have bilingual participants fill out the questionnaire in both languages and assess the

Chi-square test was used to evaluate associations among NDRG2 gene promoter methylation, mRNA expression levels and clin- ical characteristics (age, gender, relapse, Cushing syn-

The anti- oxidant activity was performed by DPPH free radical scavenging method using ascorbic acid as standard and compound IIa, IIc and IId showed significant free

These early results opens up two major directions of re- search: (1) as to identify the taxonomy features of unknown snakes using feature auto- matic feature analysis and (2) to

(In 28 Untersuchungen wurden jeweils Punkte nach dem oben genannten Schema verteilt. Dabei wurden bei jeder Untersuchung die bestehenden sowie neu hinzugekommenen Schäden