• No results found

Coordination of over-current relay using Hybrid GA-NLP method

N/A
N/A
Protected

Academic year: 2020

Share "Coordination of over-current relay using Hybrid GA-NLP method"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table :I.Values of
Table II Load flow and short circuit analysisIL,max(A) 121.8
Fig.1 Nine bus system.
Table VI Operating time of Primary and Back up relay.BACK UP RELAY

References

Related documents

The Soft Surface Structured play areas of LL’s, which include swings, monkey bars, play equipment and play fields, increased physical activity significantly with both boys and

The Executive Director is responsible for coordinating and directing all program and administrative services for this recently awarded Head Start program, including: supervision

До основних причин нерозвиненості ринку страхування фінансових ризиків на фондовому ринку України можна віднести: – майже

existence in savanna: interactions of rain and fire. Veld types of South Africa. Pretoria: Government Printer. Data Analysis and Statistics with Microsoft Excel. Planning

For this purpose, Q. Mihali believed to send during this year a working group in Italy which, in addition to pursuing some other problems, to work together with

In the event that a merger results from the aggregation over companies with high mark-ups, irrespective of their overall share in the market, our profit share indicator of market

Furthermore, while symbolic execution systems often avoid reasoning precisely about symbolic memory accesses (e.g., access- ing a symbolic offset in an array), C OMMUTER ’s test

The major business development sector emerged during the crises were considered to be telecommunications and remittance sector, remittance is described the way to transfer