INTRODUCTION...6
1.1 PURPOSEOF DOCUMENT...6 1.2 CONTENT...6 1.3 INTENDED AUDIENCE...62
BASIC DATA...7
2.1 BILLOF MATERIAL...72.1.1 Control Data For Bills of Material...7
2.1.1.1 Define Modification Parameters...7
2.1.2 Alternative Determination...7
2.1.2.1 Define Order of Priority for BOM Usages...7
2.1.2.2 Define Applications...7 2.2 WORK CENTER...8 2.2.1 General Data...8 2.2.1.1 Standard Value...8 2.2.1.1.1 Define Parameters...8 2.2.2 Routing Data...8
2.2.2.1 Define Control Key...8
2.2.3 Capacity Planning...9
2.2.3.1 Determine Capacity Planner...9
2.2.3.2 Work Center Formulas...10
2.2.3.2.1 Define formula for work center...10
3
SALES & OPERATIONS PLANNING...10
3.1 FUNCTIONS...10
3.1.1 Mass Processing...10
3.1.1.1 Define Activities...10
3.1.1.2 Maintain Transfer Profiles...11
4
MATERIALS REQUIREMENTS PLANNING...11
4.1 PLANT PARAMETERS...11
4.1.1 Carry out Overall Maintenance of Plant Parameters...11
4.2 MRP GROUPS...11
4.2.1 Carry out Overall Maintenance of MRP Groups...11
4.3 NUMBER RANGES...11
4.3.1 Define number ranges for planning run...11
4.4 MASTER DATA...13
4.4.1 Define MRP Controllers...13
4.5 PLANNING...14
4.5.1 MRP Calculation...14
4.5.1.1 Define Planning Horizon...14
4.5.1.2 Stocks...14
4.5.1.2.1 Define Availability of Stock in Transfer/Blocked Stock/Restricted Stock14 4.5.1.3 Define Rescheduling Check...15
4.5.2 Scheduling and Capacity Parameters...15
4.5.2.1 Define Floats (Scheduling Margin Key)...15
4.5.2.2 Define scheduling parameters for planned orders...16
4.5.3 Procurement Proposals...18
4.5.3.1 Define External Procurement...18
4.5.3.2 Define Line Item Number...19
4.5.4 BOM Explosion...19
4.5.4.1 Define BOM Explosion Control...19
4.5.4.2 Define BOM Selection...20
4.5.5 Activate Run Time Statistics...20
4.5.6 Direct Procurement...20
4.5.6.1 Settings for Direct Procurement...20
4.6 PROCUREMENT PROPOSALS...20
4.6.1 Planned Orders...20
4.6.1.1 Define availability check for components...20
4.6.1.2 Define Storage Location and Supply Area Determination in BOM Explosion 21 4.6.2 Conversion of Procurement Proposals...22
4.6.2.1 Define Order Type for Conversion to Production/Process Order...22
4.6.2.2 Define conversion of Planned orders into Purchase Requistions...22
4.7 PLANNING FILE ENTRIES...22
4.7.1 Activate MRP and Set up Planning File...22
5
SHOP FLOOR CONTROL...23
5.1 MASTER DATA...23
5.1.1 Order...23
5.1.1.1 Define Order Types...23
5.1.1.2 Define order type-dependent parameters...23
5.1.1.3 Define status profile...28
5.1.1.4 Define number range for orders...29
5.1.2 Define production scheduling profile...29
5.2 OPERATIONS...32
5.2.1 Define checking group...32
5.2.2 Define checking control...32
5.2.3 Define Checking Rule for Backorder Processing...35
5.3 SCHEDULING...35
5.3.1 Define Scheduling Parameters for Production Orders...35
5.3.2 Define Scheduling Margin Key...38
5.4 CAPACITY REQUIREMENTS PLANNING...38
5.4.1 Determine Capacity Planner...38
5.5 CONFIRMATION...39
5.5.1 Define Confirmation Parameters...39
5.6 DEFINE PRINT CONTROL...43
5.7 INTEGRATION...44
1 Introduction
1.1
Purpose of Document
The primary purpose of this document is to describe the SAP configuration setting that have been implemented for the entities under the Tyco Flow Control Asia. It represents one of the project deliverables during the Project’s Blueprint Phase.
1.2
Content
All the configurations should be described using table format and screen capture should be avoided.
There should be no changes to standard SAP configuration. If the standard SAP
configuration cannot be adopted, it should be copied into appropriate name space stated in OSS Note 16466. The rationale of implementing non-standard SAP setting should be provided.
1.3
Intended Audience
This document is intended for review by various IT within TFCA ASIA including the SAP Support Consultants.
2 Basic Data
Menu path:IMG Production Basic Data Bill of Material Control Data for Bills of Material
2.1
Bill of Material
2.1.1
Control Data For Bills of Material
2.1.1.1
Define Modification Parameters
Menu path:IMG Production Basic Data Bill of Material Control Data for Bills of Material Define Modification Parameters
Validity
Low Date
2.1.2
Alternative Determination
2.1.2.1
Define Order of Priority for BOM Usages
Menu path:IMG Production Basic Data Bill of Material Alternative Determination Define Order of Priority for BOM Usages
SelID SelPr BOM Usage
Z9 1 2
2.1.2.2
Define Applications
Menu path:IMG Production Basic Data Bill of Material Alternative Determination Define Applications
Applicatio n
SelID AltSel PV Appli Desc Expl MR P Pl Ord Rel Cstg Rel WkSch Rel Ord Coll With SO Z999 Z9 Prod – Engin (Usag e 2)
2.2
Work Center
2.2.1
General Data
2.2.1.1
Standard Value
2.2.1.1.1 Define Parameters
Menu path:IMG Production Basic Data Work Center General Data Standard Value Define Parameters
No need to configure, follow Japan
2.2.2
Routing Data
2.2.2.1
Define Control Key
Menu path:IMG Production Basic Data Work Center Routing Data Define Control Key
No need to configure, follow Japan
2.2.3
Capacity Planning
2.2.3.1
Determine Capacity Planner
Menu path:IMG Production Basic Data Work Center Capacity Planning Determine Capacity Planner
Plnnr Description
QP1 TFCQ Cap Planner
2.2.3.2
Work Center Formulas
2.2.3.2.1 Define formula for work center
Menu path:IMG Production Basic Data Work Center Capacity Planning Work Center Formulas Define formula for work center
3 Materials Requirements Planning
3.1
Plant Parameters
3.1.1
Carry out Overall Maintenance of Plant Parameters
Menu path:IMG Production Materials Requirements Planning Plant Parameters Carry out overall maintenance of plant parameters
Please look at the individual sections below.
3.2
MRP Groups
3.2.1
Carry out Overall Maintenance of MRP Groups
Menu path:IMG Production Materials Requirements Planning MRP Groups Carry out overall maintenance of MRP groups
Please look at the individual sections below.
3.3
Number Ranges
3.3.1
Define number ranges for planning run
Menu path:IMG Production Number Ranges Define number ranges for planning run Planned Orders
Plant Name1 NRge pl.orders Simulative planned orders
3031 Qingpu 01 01
Interval: 0000000001 - 0019999999
Dependent reqmts
Plant Name1 NR : StkTrns Res
3031 Qingpu 01
Interval: 0000000001 – 89999999 Purchase Requisitions
3031 Qingpu 1E
Interval: 9020000000 – 9029999999 MRP List
Plant Name1 No. Range - MRP
3031 Qingpu 01
Interval: 00000000001 - 9999999999
Total Requirements
Plant Name1 NR: Total Reqmts
3031 Qingpu 01
Interval: 0000000001 - 1999999999
3.4
Master Data
3.4.1
Define MRP Controllers
Menu path:IMG Production Materials Requirements Planning Master Data Define MRP Controllers
Plnt Name 1 MRP Cont. MRP Controller Name
3031 Qingpu Z01 徐娇燕 3031 Qingpu Z02 朱启芳 3031 Qingpu Z03 朱海琳 3031 Qingpu Z04 张权 3031 Qingpu Z05 傅德伟 3031 Qingpu Z06 徐惠娟 3031 Qingpu Z07 马沈洁 3031 Qingpu Z08 刘有才 3031 Qingpu Z09 姚秋华 3031 Qingpu Z10 周元仁
3.5
Planning
3.5.1
MRP Calculation
3.5.1.1
Define Planning Horizon
Menu path:IMG Production Materials Requirements Planning Planning MRP Calculation Define Planning Horizon
Plant Plant Name Planning Horizon
3031 Qingpu 200
Plant Plant Name MRP Group Plan. Hor.
3031 Qingpu ZFG0 200
3031 Qingpu ZSF0 200
3031 Qingpu ZRM0 200
3.5.1.2
Stocks
3.5.1.2.1 Define Availability of Stock in Transfer/Blocked Stock/Restricted
Stock
Menu path:
IMG Production Materials Requirements Planning Planning MRP Calculation Stocks Define Availability of Stock in Transfer/Blocked Stock/Restricted Stock
Plant Name 1 Stock in Transfer Blocked Stk Restricted-use stock
3031 KTM
3.5.1.3
Define Rescheduling Check
Menu path:IMG Production Materials Requirements Planning Planning MRP Calculation Define Rescheduling Check
Plant 3031
Rescheduling Horizon 200 Firmed Planned Orders Production Order
Fixed Purchase Requisitions PO/SA Schedule Line QM Inspection Lot Shipping Notification Tolerance Value Forward 2 Tolerance Value for displacement 2
Plant 3031 3031 3031
MRP Group ZFG0 ZSF0 ZRM0 Rescheduling Horizon 200 200 200 Tolerance value forward
Tolerance value for displacement
3.5.1.4
Define Error Processing In the Planning Run
Menu path:IMG Production Materials Requirements Planning Planning MRP Calculation Define Error Processing In the Planning Run
Plant Plant Name Max Proposals
3031 KTM 50
3.5.2
Scheduling and Capacity Parameters
3.5.2.1
Define Floats (Scheduling Margin Key)
Menu path:IMG Production Materials Requirements Planning Planning Scheduling and Capacity Parameters Define Floats (Scheduling Margin Key)
Plant Name 1 Marg. Op.Per Fl. Bef Fl. After Rel.Per
3031 Qingpu 000 0 0 0 0
3031 Qingpu 001 10 2 1 5
3031 Qingpu 002 2 0 0 2
3.5.2.2
Define scheduling parameters for planned orders
Menu path:IMG Production Materials Requirements Planning Planning Scheduling and Capacity Parameters Define scheduling parameters for planned orders
Order Type * PE ProdScheduler * * Detailed Scheduling Sched.hor.det 0 0 SellD: Detailed 01 01 Scheduling
Generate capacity reqs Rate-based Scheduling
Rate.plng.horzn 0 0
SellD:rate plng 02 02
Scheduling
Generate capacity reqs
Rough-cut Scheduling
RCutPlg horizon 0 0
SellD:roughPlng 03 03
Scheduling
Generate capacity reqs Sequencing
Takt time/rate-based sched. Adjust Scheduling
Scheduling Level Via detailed scheduling 1 Via rate based scheduling Adjust Dates Adjust basic dates, adjust dep.
Reqmts to operation date
2 Do not adjust basic dates, dep reqmts to operation dates For Capacity scheduling Always basic dates, dep. Reqmts to
operation dates
Always basic dates, dep reqmts to operation dates
Scheduling control for detailed scheduling
Scheduling type 2 backwards 2 backwards
Start in the past 0 0
Automatic Log Latest Staging Date Scheduling with breaks Reduction
Reduction Type All operations in the order will be reduced
All operations in the order will be reduced
Maximum Reduction Level 0 Do not reduce 0 Do not reduce % reduction in floats L1 L2 L3 L4 L5 L6
0 0 0 0 0 0
L1 L2 L3 L4 L5 L6 0 0 0 0 0 0
3.5.3
Procurement Proposals
3.5.3.1
Define External Procurement
Menu path:IMG Production Materials Requirements Planning Planning Procurement Proposals Define External Procurement
Plant Name 1 MRP Group Name Sched: Info/Agrmt Doc Type SPO
Doc Type SC Doc Type STO 3031 Qingpu ZFG0 TFCQ Finished Goods 3031 Qingpu ZSF0 TFCQ Semi-Finished Goods 3031 Qingpu ZRM0 TFCQ Raw Material ZAPR
3.5.3.2
Define Line Item Number
Menu path:IMG Production Materials Requirements Planning Planning Procurement Proposals Define Line Item Number
Plnt Plant Name Item PR Item No. Stock Trans Res
3031 Qingpu 10 100
3.5.4
BOM Explosion
3.5.4.1
Define BOM Explosion Control
Menu path:IMG Production Materials Requirements Planning Planning BOM Explosion Define BOM Explosion Control
Plant Explosion Date Excl. Bulk Mat SOrd/WBS BOM Active BOM expl no.for MTO production
3031
3023
3.5.4.2
Define BOM Selection
Menu path:IMG Production Materials Requirements Planning Planning BOM Explosion Define BOM Selection
Plnt Name 1 BOM Sel ID Routing Sel ID
3031 Qingpu 01
3.5.5
Activate Run Time Statistics
Menu PathIMG Production Materials Requirements Planning Planning Activate Run Time Statistics
Plant Plant Name Display List Frequency
3.5.6
Direct Procurement
3.5.6.1
Settings for Direct Procurement
Plant 3031 Description KTM Direct producrment/production 3 Message Indicator Acc.asst unknown:direct procmt U
3.6
Procurement Proposals
3.6.1
Planned Orders
3.6.1.1
Define availability check for components
IMG Production Material Requirements Planning Procurement Proposals Planned Orders Define availability check for components
Determine Check
Availability Check Z2 Checking Rule PP Stocks
Include Safety Stock Stockin Tranfer Incl. quality insp stock Incl blocked stock
Incl. restricted-use stock W/o subcontracting Replenishment Lead Time
Check without RLT Storage location inspection
No.stor.loc.inspectn Missing parts processing
Checking period: GR 0 In/Outward movements
Incl. purchase orders Incl. purch.requisitions Incl. dependent reqs Include reservations Include sales reqmts Include deliveries Incl. ship.notificat. Incl. depen.reservat. X Incl. rel.order reqs X Incl. planned orders X Incl. production orders X
Receipts in Past A (nclude receipts from past and future, with messages)
Plant
Plnt Avail. Check Rule
3.6.1.2
Define Storage Location and Supply Area Determination in BOM
Explosion
No need to configure
3.6.2
Conversion of Procurement Proposals
3.6.2.1
Define Order Type for Conversion to Production/Process Order
PlantPlant Name 1 Prod. Perc
3031 KTM ZQTS
3.6.2.2
Define conversion of Planned orders into Purchase Requistions
Number of planned ordersPlant Plant Name Number of planned orders
3031 Qingpu 500
3.7
Planning File Entries
3.7.1
Activate MRP and Set up Planning File
Menu path:IMG Production Material Requirements Planning Planning File Entries Activate MRP and Set up Planning File
Material Requirements Planning
Plant Activate requirements planning
4 Shop Floor Control
4.1
Master Data
4.1.1
Order
4.1.1.1
Define Order Types
Menu path:IMG Production Shop Floor Control Master Data Order Define Order Types
Type Name
ZQTO TFC Qingpu MTO ZQTS TFC Qingu MTS
4.1.1.2
Define order type-dependent parameters
Menu path:IMG Production Shop Floor Control Master Data Order Define Order Types-Dependent Parameters
Plant 3031 3031
Order Type ZQTO ZQTS
Production Version 0 1 Routing
Application P P
Selection ID 01 01
Sequence Exchange 0 0
Task List Type N N
AltTaskListApplic.
Routing Selection 3 4 Alternative Sequences Check Op. Details
Routing Text Entry Tool Oper/act. Increment 0010 0010 Reduction Strategy 01 01 BOM Application PP01 PP01 Search Procedure
Substitute MRP Ctrller Substitute Scheduler
Reservation/Purch.Req 3 3 Collective PR
Inspection Type
For Order Header
For Operation
For Material
For Production Resource/Tool
Update
Header Item Operation
GR for Purchase Order GR for Production Order Planned Goods Issue Unplanned Goods Issue PDC Active
Workflow for Purchase Order Change
Cstg variant planned ZPP1 ZPP1 Cstg variant actual ZPP2 ZPP2 Results Analysis Key 000002 000002 Planned cost Calcul 2 2 Cost collector
Net Order Price Distribution Rule
Default Rule PP1 PP1
Collective order display
Graphics Profile 000001 000001
Group PP PP
Name standard standard
Index 2 2
ProfMissPrtsLstOrdNo 000001 000001 Missing Parts Prof. 000002 000002
4.1.1.3
Define status profile
Menu path:4.1.1.4
Define number range for orders
Menu path:IMG Production Shop Floor Control Master Data Order Define number range for orders
Order Type No. Range No. Range PP01 1000000000 7999999999 ZIQR 8100000000 8199999999 ZRWI 8200000000 8299999999 ZRWC 8300000000 8399999999 ZRWD 8400000000 8499999999 ZRWT 8500000000 8599999999
4.1.2
Define production scheduling profile
Menu path:IMG Production Shop Floor Control Master Data Define production scheduling profile
Plant 3031 3031
Prod. Sched. Profile Z00001 Z00002 Automatic Actions
On Creation Release
Document Links –Material Document Links – BOM On Release
Execute Printing
Schedule Order Document Links– Material Document Links-BOM Create control recipe Material Availability Check Confirm Available Partial Qty
Goods Receipt
Automatic Goods Receipt Capacity Planning Leveling Overall Profile Availability Check Confirm Capacity Finite scheduling Confirmation
No update of yield surplus Adjust quantities in order to actual values
No update of yield deficit Batch Management Automatic Batch Creation in the Order
2 Batch Classification 2 Extended classification
Always Batch Split Transport
Complete Transfer Requirement
Confirmed quantity for TR
WM Request X X
GI via delivery Order Type
Make-to-stock ZQTS
Make-to-order Prod. ZQTO Engineer-to-order
Without material ZRWK ZRWK
4.2
Operations
4.2.1
Define checking group
Menu path:IMG Production Shop Floor Control Operations Availability Check Define Checking Group
Av Description Totalsales TotDlvReqs Block QtRq
No Check Accuml .
Response RelChkPlan
Z2 TFC Indiv Req A A 3
4.2.2
Define checking control
Plant 3031 3031 3031 3031 3031 3031 Order Type PP01 ZIQR ZRWC ZRWD ZRWI ZRWT
Availability Check 1 1 1 1 1 1 Material availability No check Check mat. Availability when saving order Checking rule PP PP PP PP PP PP Component check type Collect. Conversion PRT Availability No Check Checking rule Collect. Conversion Capacity availability No check
Overall profile SAPSFCG013 SAPSFCG0 13
SAPSFCG0 13
Collect. conversion
IMG Production Shop Floor Control Operations Availability Check Define Checking Rule for Backorder Processing
No need to configure, follow Japan
4.3
Scheduling
4.3.1
Define Scheduling Parameters for Production Orders
Menu path:IMG Production Shop Floor Control Operations Scheduling Define Scheduling Parameters for Production Orders
Plant 3031 3031 3031 3031 3031 3031 Order Type ZQTO ZQTS ZRWC ZRWD ZRWI ZRWT
ProdShceduler * * * * * * Detailed Scheduling SellD: Detailed Scheduling Generate capacity reqs. Rate-based scheduling SellD:rate plng Scheduling Generate capacity reqs Rough-cut scheduling SellD:rough Plng Scheduling Generate capacity reqs Adjust Scheduling Adjust dates
Scheduling control for detailed scheduling Scheduling Type 2 2 2 2 2 2 Start in the past 0 0 0 0 0 0 Automatic scheduling Automatic log Scheduling with breaks From production dates Shift order
Requirements Date Determination for Components Operation Segment Latest Staging Date Reduction Reduction type Maximum reduction level 0 0 0 0 0 0 % reduction in floats 0 0 0 0 0 0
4.3.2
Define Scheduling Margin Key
Menu path:IMG Production Shop Floor Control Operations Scheduling Define Scheduling Margin Key
Plant Name1 Key Op Per Float after prod
Float before prod Rel Per
3031 Qingpu 000 0 0 0 0
3031 Qingpu 001 10 1 2 5
3031 Qingpu 002 2 0 0 2
4.4
Capacity Requirements Planning
4.4.1
Determine Capacity Planner
Menu path:IMG Production Shop Floor Control Operations Capacity Requirements Planning Determine Capacity Planner
Plnnr Description
QP1 TFCQ Cap. Planner
4.5
Confirmation
4.5.1
Define Confirmation Parameters
Menu path:IMG Production Shop Floor Control Operations Confirmation Define Confirmation Parameters
Plant 3031 3031 3021 3021 3021 3021 Order Type ZQTO ZQTS ZRWC ZRWD ZRWI ZRWT Generally valid settings Control Data Process Control Generated confirmations w/o quantity adjustment Checks Operation Sequence
Not checked Not checked Not checked Not checked Not checked Not checked Underdelivery Not checked Not checked Not checked Not checked Not checked Not checked
Date in Future HR update No HR update Selection Open orders Propose time units Automatic optimization Hours Minutes Goods Movements All Components General individual entry Confirmation function except fast entry Confirm.type 1 1 Post open reservations Error handling/logs Act.Costs Termination for Incorrect ActCosts Goods Movements Termination for Incorrect Goods Movts Operation indiv. Entry using initial scrn Quantities Propose Display confirmed quantities Display defaults Services Propose Display confirmed services Display defaults Dates Propose dates Display confirmed dates Display defaults HR Data Display Defaults Screen control for time ticket Quantity/activit y Act. data Selection +Finally confirmed operations
+Confirmable operations
4.6
Define Print Control
Menu path:
IMG Production Shop Floor Control Operations Define Print Control Reference Order Type
Type RefordType PP01 PP01 ZIQR PP01 ZRWC PP01 ZRWD PP01 ZRWI PP01 ZRWT PP01 Print Programs
Ref Order Type PV List Report Name
List Control for Transactions
RefOrdType Plant MRPCont. TransCode PV Npri CKeyCheck IndivList
Printer Specification
RefOrdType Plant MRP Cont. List WCPr OutDe Output Device
4.7
Integration
4.7.1
Define Valuation of Goods Received
Menu path:IMG Production Shop Floor Control Integration Define Valuation of Goods Received
Val. Area Val. Var.