Project Closeout Module 1 Construction Closeout Checklist

N/A
N/A
Protected

Academic year: 2021

Share "Project Closeout Module 1 Construction Closeout Checklist"

Copied!
37
0
0

Loading.... (view fulltext now)

Full text

(1)

Project

Project

Closeout

Closeout

Module 1

Module 1

Construction Closeout Checklist

(2)

2

OAR Challenge

How to

How to

Close the Project

Close the Project

(Drain the Swamp)

(Drain the Swamp)

And Protect

And Protect

District Assets from

District Assets from

Contractors

Contractors

(Alligators)

(3)

Project Closeout

Financial Closeout

School Opening Activities

(4)

4

Agenda

• Overview

• Solution –

A Tool That Will Actually Help You

Construction Closeout Checklist

Construction Closeout Checklist

• Review

(5)

Overview

-

Construction Closeout Importance

-–

Can Impact Funding

Can Impact Funding

State Funds

State Funds

Project/Program Budget

Project/Program Budget

Release Needed Funds

Release Needed Funds

Part of an

Part of an

OAR’s

OAR’s

Job & Responsibility

Job & Responsibility

(6)

6

Overview

--

LAUSD Program

--•

243 Projects in the Program

243 Projects in the Program

48 Projects Now Reported “Complete”

48 Projects Now Reported “Complete”

? Projects Complete

? Projects Complete

a.

a.? Retention Released? Retention Released b.

b.? Outstanding Claims/Liabilities/Change Orders? Outstanding Claims/Liabilities/Change Orders c.

c.? DSA Certified? DSA Certified d.

d.? Excess Funds Released? Excess Funds Released

195 New Construction Projects Remaining

195 New Construction Projects Remaining

(7)

Sources Defining “Closeout” Requirements

Sources Defining “Closeout” Requirements

– Contract Documents

• “00” & “01” Spec Sections

• Technical Spec Sections (“02” thru “16”)

– FSD Policies & Procedures

• Chapter 14 (Construction Management) • Construction Closeout (Section 14.21)

– Supplemental Guidelines/Checklists

Overview

(8)

--8

Solution

Identify & Summarize the Required

– Policies & Procedures

– Spec Sections

– Checklists/Forms

– Supplemental Information Sources

Into a Single Package

& Give It To OARs For Their Use

(9)

Checklist With 7 Sections

A. Start of Construction (15) B. Start-Up (63) C. Substantial Completion (42) D. Final Completion (25) E. Evaluations (6) - Notes Sheet(s)

- Source List for Supplemental Information/Packages

(10)

10

(11)
(12)

12

(13)
(14)

14

(15)

Checklist Format

Sections & Action Items

(16)

16

(17)
(18)

18

(19)
(20)

20

(21)

B. Start Up (63)

Schedule (

Schedule (

-

-

90)

90)

¾

¾ Verify Project Is OnVerify Project Is On--ScheduleSchedule

‰

‰ Yes Yes –– Proceed With Listed StartProceed With Listed Start--Up ActivitiesUp Activities ‰

‰ NoNo

ƒ

ƒ Adjust ScheduleAdjust Schedule ƒ

ƒ Notify Concerned/Impacted Parties Notify Concerned/Impacted Parties - -In Writing

In Writing –– Of The Schedule ChangeOf The Schedule Change ƒ

(22)

22

B. Start Up (63)

Coordination (

Coordination (

-

-

60)

60)

¾

¾ Advise Concerned/Impacted Parties Advise Concerned/Impacted Parties - -In Writing

In Writing Of StartOf Start--Up Activity Schedule & DatesUp Activity Schedule & Dates

¾

¾ Coordinate w/ M&O RegardingCoordinate w/ M&O Regarding

‰ Timely Submittal of Maintenance & Operating Manuals ‰ Training Schedule

‰ Drawings & Specifications

¾

¾ Receipt & Transfer of Spare Parts/“Attic” StockReceipt & Transfer of Spare Parts/“Attic” Stock

¾

¾ Witness & Certification OfWitness & Certification Of Equipment/Systems Start

(23)

B. Start Up (63)

Change Orders (

Change Orders (

-

-

60)

60)

¾

¾ Status IdentificationStatus Identification

¾

¾ CDsCDs ¾

¾ COPsCOPs ¾

¾ Time ExtensionsTime Extensions ¾

¾ NegotiationNegotiation

¾

(24)

24

B. Start Up (63)

Miscellaneous (

Miscellaneous (

-

-

30)

30)

¾

¾ Test & BalanceTest & Balance

‰

‰ ActivitiesActivities ‰

‰ ReportsReports ¾

¾ 1414--Day Building PurgeDay Building Purge

¾

¾ Site CleanSite Clean--UpUp

¾

¾ DemobilizationDemobilization

¾

(25)
(26)

26

C. Substantial Completion (42)

Certificate of Substantial Completion

Certificate of Substantial Completion

¾

¾ VerifyVerify 9

9 All All RFCs/RFIsRFCs/RFIs AnsweredAnswered 9

9 Submittals ReceivedSubmittals Received 9

9 Contract/Spec Requirements CompletedContract/Spec Requirements Completed 9

9 Record Materials/Documents ReceivedRecord Materials/Documents Received 9

9 Warranty/Guarantee Documentation ReceivedWarranty/Guarantee Documentation Received

¾

¾ FINAL Punchlist Prepared & ReadyFINAL Punchlist Prepared & Ready

Issue Contractor A Certificate of Substantial Completion, Issue Contractor A Certificate of Substantial Completion,

Final Punch List & Set Final Completion Date Final Punch List & Set Final Completion Date

(27)

C. Substantial Completion (42)

Coordination

Coordination

¾

¾ Certificate of Final Completion Also Sent To:Certificate of Final Completion Also Sent To:

‰

‰ FCCFCC ‰

‰ Risk Management/OCIPRisk Management/OCIP ¾

¾ Transfer of Utility ServicesTransfer of Utility Services

¾

¾ MoveMove--In/Occupancy TransitionIn/Occupancy Transition

¾

(28)

28

D. Final Completion (25)

Contractor

¾

¾ Complete Punchlist ItemsComplete Punchlist Items

¾

¾ Submit Proof That All Submit Proof That All

Fees/Bills/Obligations Have Been Paid

Fees/Bills/Obligations Have Been Paid

¾

¾ Submit Waivers & Releases for All WorkSubmit Waivers & Releases for All Work

‰

‰ SubcontractorsSubcontractors ‰

(29)

D. Final Completion (25)

IOR

¾ Final Inspection – Identify Incomplete Work ¾ Verify That Contractor’s Form 6 Has Been

(30)

30

D. Final Completion (25)

Final Payment/Retention Release

Final Payment/Retention Release

¾

¾ Decide How Best To Complete Any Remaining Work Decide How Best To Complete Any Remaining Work & Implement

& Implement

¾

¾ Prepare Owner Assessment SummaryPrepare Owner Assessment Summary

¾

¾ Prepare & Submit Prepare & Submit -- --“

Report of Completion and Report of Completion and

Recommendation of Acceptance

(31)

D. Final Completion (25)

Final Releases

Final Releases

¾

¾

Release Insurance/Bonds (Surety, Payment,

Release Insurance/Bonds (Surety, Payment,

Performance, Etc.)

Performance, Etc.)

--

--

If Appropriate

If Appropriate

¾

¾

Release Unused/Uncommitted

Release Unused/Uncommitted

Construction

(32)

32

D. Final Completion (25)

Architectural Services

¾

¾ Receive Updated Drawings & Specifications Receive Updated Drawings & Specifications & Contractor’s “As

& Contractor’s “As--Built” ORIGINALSBuilt” ORIGINALS

¾

¾ Complete & Process All A/E COsComplete & Process All A/E COs

¾

¾ Close Construction Administration ContractClose Construction Administration Contract

‰

‰ Verify DSA Submittals Completed & ApprovedVerify DSA Submittals Completed & Approved

9

9 COs COs 9

9 Form 6Form 6

‰

(33)

D. Final Completion (25)

Files

¾

¾ Prepare & Transfer Project Files to FCS ArchivesPrepare & Transfer Project Files to FCS Archives

¾

¾ Transfer AsTransfer As--Built Drawings & Specifications Built Drawings & Specifications to PVU (CDs & Originals)

to PVU (CDs & Originals)

¾

¾ Copy & Transfer AsCopy & Transfer As--Built Drawings & Specifications Built Drawings & Specifications to M&O (CDs)

(34)

34

E. Evaluations (6)

¾ Contractor Performance Evaluation (PnP 14.21.6.0) ¾ Contractor Safety Evaluation (PnP 14.21.6.0)

¾ Architect Performance Evaluation (PnP 8.2-Exhibit Q)

(35)

Support Information

1. Closeout Contact List

2. Closeout Contact Matrix

3. Standard Specifications

Contract Deliverables Modules (Div 2-16)

4. ITD Checklist(s)

5. Relocatable Housing Instructions

6. Forms

(36)

36

Implementation

Introduction (Today)

Additional Training Modules Anticipated

“Living” Document

Anticipated Completion – December ’04

Policy & Procedure Update (14.21)

Suggestions/Recommendations

Encouraged

(37)

References

Related documents

catarrhal fever virus shedding by infected cattle. The demonstration of cell-free malignant catarrhal fever herpesvirus in wildebeest nasal secretions. Studies in bovine

Notice of Completion Original Contractors file a brute of Completion after the final inspection certificate of occupancy or all substantial work is complete.. A Temporary Certificate

It is evident that Initial Teacher Education in England needs a clear and compulsory focus on developing literacy expertise among future primary and secondary

Submit certified copy of Architect's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Architect.. Certified copy of

7.2 If the Principal does not arrange to take over the risk on the date of issue of the Practical Completion Certificate, or a Practical Completion Certificate for a Separate

If, within 10 working days of the issue of the certificate of Substantial Completion of the Works, or another date agreed by the Employer’s Representative, the Contractor provides

 Within seven calendar days of practical completion the Project Manager shall prepare and issue to the contractor a final completion list detailing the incomplete work and defects

that has a current certification under the pipeline safety laws, (49 U.S.C. 60101 et seq.) may require the operator to amend its plans and procedures as necessary to provide