Project Closeout
Financial Closeout
School Opening Activities
4
Agenda
• Overview
• Solution –
A Tool That Will Actually Help You
Construction Closeout Checklist
Construction Closeout Checklist
• Review
Overview
-
Construction Closeout Importance
-–
–
Can Impact Funding
Can Impact Funding
•
•
State Funds
State Funds
•
•
Project/Program Budget
Project/Program Budget
•
•
Release Needed Funds
Release Needed Funds
–
–
Part of an
Part of an
OAR’s
OAR’s
Job & Responsibility
Job & Responsibility
–
6
Overview
--
LAUSD Program
--•
•
243 Projects in the Program
243 Projects in the Program
•
•
48 Projects Now Reported “Complete”
48 Projects Now Reported “Complete”
•
•
? Projects Complete
? Projects Complete
a.
a.? Retention Released? Retention Released b.
b.? Outstanding Claims/Liabilities/Change Orders? Outstanding Claims/Liabilities/Change Orders c.
c.? DSA Certified? DSA Certified d.
d.? Excess Funds Released? Excess Funds Released
•
•
195 New Construction Projects Remaining
195 New Construction Projects Remaining
•
Sources Defining “Closeout” Requirements
Sources Defining “Closeout” Requirements
– Contract Documents
• “00” & “01” Spec Sections• Technical Spec Sections (“02” thru “16”)
– FSD Policies & Procedures
• Chapter 14 (Construction Management) • Construction Closeout (Section 14.21)
– Supplemental Guidelines/Checklists
Overview
--8
Solution
Identify & Summarize the Required
– Policies & Procedures
– Spec Sections
– Checklists/Forms
– Supplemental Information Sources
Into a Single Package
& Give It To OARs For Their Use
Checklist With 7 Sections
A. Start of Construction (15) B. Start-Up (63) C. Substantial Completion (42) D. Final Completion (25) E. Evaluations (6) - Notes Sheet(s)- Source List for Supplemental Information/Packages
10
12
14
Checklist Format
Sections & Action Items
16
18
20
B. Start Up (63)
Schedule (
Schedule (
-
-
90)
90)
¾
¾ Verify Project Is OnVerify Project Is On--ScheduleSchedule
Yes Yes –– Proceed With Listed StartProceed With Listed Start--Up ActivitiesUp Activities
NoNo
Adjust ScheduleAdjust Schedule
Notify Concerned/Impacted Parties Notify Concerned/Impacted Parties - -In Writing
In Writing –– Of The Schedule ChangeOf The Schedule Change
22
B. Start Up (63)
Coordination (
Coordination (
-
-
60)
60)
¾
¾ Advise Concerned/Impacted Parties Advise Concerned/Impacted Parties - -In Writing
In Writing –– Of StartOf Start--Up Activity Schedule & DatesUp Activity Schedule & Dates
¾
¾ Coordinate w/ M&O RegardingCoordinate w/ M&O Regarding
Timely Submittal of Maintenance & Operating Manuals Training Schedule
Drawings & Specifications
¾
¾ Receipt & Transfer of Spare Parts/“Attic” StockReceipt & Transfer of Spare Parts/“Attic” Stock
¾
¾ Witness & Certification OfWitness & Certification Of Equipment/Systems Start
B. Start Up (63)
Change Orders (
Change Orders (
-
-
60)
60)
¾
¾ Status IdentificationStatus Identification
¾
¾ CDsCDs ¾
¾ COPsCOPs ¾
¾ Time ExtensionsTime Extensions ¾
¾ NegotiationNegotiation
¾
24
B. Start Up (63)
Miscellaneous (
Miscellaneous (
-
-
30)
30)
¾
¾ Test & BalanceTest & Balance
ActivitiesActivities
ReportsReports ¾
¾ 1414--Day Building PurgeDay Building Purge
¾
¾ Site CleanSite Clean--UpUp
¾
¾ DemobilizationDemobilization
¾
26
C. Substantial Completion (42)
Certificate of Substantial Completion
Certificate of Substantial Completion
¾
¾ VerifyVerify 9
9 All All RFCs/RFIsRFCs/RFIs AnsweredAnswered 9
9 Submittals ReceivedSubmittals Received 9
9 Contract/Spec Requirements CompletedContract/Spec Requirements Completed 9
9 Record Materials/Documents ReceivedRecord Materials/Documents Received 9
9 Warranty/Guarantee Documentation ReceivedWarranty/Guarantee Documentation Received
¾
¾ FINAL Punchlist Prepared & ReadyFINAL Punchlist Prepared & Ready
Issue Contractor A Certificate of Substantial Completion, Issue Contractor A Certificate of Substantial Completion,
Final Punch List & Set Final Completion Date Final Punch List & Set Final Completion Date
C. Substantial Completion (42)
Coordination
Coordination
¾
¾ Certificate of Final Completion Also Sent To:Certificate of Final Completion Also Sent To:
FCCFCC
Risk Management/OCIPRisk Management/OCIP ¾
¾ Transfer of Utility ServicesTransfer of Utility Services
¾
¾ MoveMove--In/Occupancy TransitionIn/Occupancy Transition
¾
28
D. Final Completion (25)
Contractor
¾
¾ Complete Punchlist ItemsComplete Punchlist Items
¾
¾ Submit Proof That All Submit Proof That All
Fees/Bills/Obligations Have Been Paid
Fees/Bills/Obligations Have Been Paid
¾
¾ Submit Waivers & Releases for All WorkSubmit Waivers & Releases for All Work
SubcontractorsSubcontractors
D. Final Completion (25)
IOR
¾ Final Inspection – Identify Incomplete Work ¾ Verify That Contractor’s Form 6 Has Been
30
D. Final Completion (25)
Final Payment/Retention Release
Final Payment/Retention Release
¾
¾ Decide How Best To Complete Any Remaining Work Decide How Best To Complete Any Remaining Work & Implement
& Implement
¾
¾ Prepare Owner Assessment SummaryPrepare Owner Assessment Summary
¾
¾ Prepare & Submit Prepare & Submit -- --“
“Report of Completion and Report of Completion and
Recommendation of Acceptance
D. Final Completion (25)
Final Releases
Final Releases
¾
¾
Release Insurance/Bonds (Surety, Payment,
Release Insurance/Bonds (Surety, Payment,
Performance, Etc.)
Performance, Etc.)
--
--
If Appropriate
If Appropriate
¾
¾
Release Unused/Uncommitted
Release Unused/Uncommitted
Construction
32
D. Final Completion (25)
Architectural Services
¾
¾ Receive Updated Drawings & Specifications Receive Updated Drawings & Specifications & Contractor’s “As
& Contractor’s “As--Built” ORIGINALSBuilt” ORIGINALS
¾
¾ Complete & Process All A/E COsComplete & Process All A/E COs
¾
¾ Close Construction Administration ContractClose Construction Administration Contract
Verify DSA Submittals Completed & ApprovedVerify DSA Submittals Completed & Approved
9
9 COs COs 9
9 Form 6Form 6
D. Final Completion (25)
Files
¾
¾ Prepare & Transfer Project Files to FCS ArchivesPrepare & Transfer Project Files to FCS Archives
¾
¾ Transfer AsTransfer As--Built Drawings & Specifications Built Drawings & Specifications to PVU (CDs & Originals)
to PVU (CDs & Originals)
¾
¾ Copy & Transfer AsCopy & Transfer As--Built Drawings & Specifications Built Drawings & Specifications to M&O (CDs)
34
E. Evaluations (6)
¾ Contractor Performance Evaluation (PnP 14.21.6.0) ¾ Contractor Safety Evaluation (PnP 14.21.6.0)
¾ Architect Performance Evaluation (PnP 8.2-Exhibit Q)
Support Information
1. Closeout Contact List
2. Closeout Contact Matrix
3. Standard Specifications
Contract Deliverables Modules (Div 2-16)
4. ITD Checklist(s)
5. Relocatable Housing Instructions
6. Forms