(1)

H. MAINAUD DURAND

PACMAN training network

A study on Particle Accelerator Components’

Metrology and Alignment to the Nanometre scale

OUTLINE

Scientific project

Marie Curie training network

Implementation

Next steps / open issues

24/05/2013

(2)

Scientific project

Starting point = challenge concerning the pre-alignment of the CLIC components.

 Requirements:

Current strategy

 Series of steps: fiducialisation of the components and their support, alignment on a common support, alignment in the tunnel using sensors fiducials.

but time and precision consuming

considering the number of components to be aligned…

The zero of each component will be included in a cylinder with a radius of a few microns:

 14 µm (RF structures & MB quad BPM)  17 µm (MB quad)

(3)

3

Fiducialisation of components

Fiducialisation of their common support

Alignment on a common support

(4)

Scientific project

PACMAN project:

Propose and develop an alternative solution integrating all the alignment steps and technologies at the same time and location (CMM machine)

Technologies concerned:

Beam

Instrumentation Metrology Micrometric alignment positioning Nano

Magnetic measurements

Ultra high precision engineering

(5)

Scientific project

Long term

• Automation of the process

• Simplification (method, duration, components)

• Extrapolation to other components

• Optimization of performances and precision in all domains

• Preparation of industrialization Short term: some key issues

• Integration, ultra-high precision engineering and manufacturing

• Magnetic measurements with a vibrating stretched wire (and alternative based on printed circuit boards rotating search coils)

• Determination of the electromagnetic centre of BPM and RF structure using a stretched wire

• Absolute methods of measurements: new measuring head for CMM, combination of FSI and micro-triangulation measurements as an alternative

• Improve seismic sensors and study ground motion

• Nano-positioning system to position the quadrupole and BPM Build a prototype alignment bench

(6)

Marie Curie action

 A Marie Curie action provides EC funding for post-grads to participate in CERN projects

 PACMAN project belongs to an ITN = Initial Training Network

o Purpose:

o Improve career perspectives of Early Stage Researchers (ESR) in

both public and private sectors

o Make research careers more attractive o Objectives:

o Respond to well-identified needs in defined scientific or

technological areas

o Expose the researcher to other sectors

o Offer a comprehensive set of transferable skills

 There are 3 different ITN programs: multi-ITN, IDP and EID. PACMAN is an

Innovative Doctoral Program

o Management at CERN o 10 ESR

o ESRs must be working towards a PhD  universities must supervise the PhD student

o Associated Partners from universities and industry

(7)

Marie Curie action

PACMAN

DMP

ES

ELTOS

IT

ETALON

DE

METROLAB

CH

SIGMAPHI

FR

Cranfield University

GB

ETH Zürich

CH

LAPP

FR

SYMME

FR

University of Sannio

IT

IFIC / FESIC

ES

Delft University of Technology

NL

Hexagon Metrology

DE

National Instruments

HU

(8)

Marie Curie action

PACMAN

ESR Subject Secondment Univ. CERN

Superv. 1.1 Non contact high precision sensor for Leitz Infinity Coordinate

Measuring Machine Hexagon (3M+2M) ETHZ / Savoie A. Cherif 1.2 Development and validation of an Absolute Frequency

Scanning Interferometry (FSI) network

Etalon (3M) ETHZ H. Mainaud Durand 1.3 Micro-triangulation for high accuracy short range

measurements of dynamic objects

Etalon (3M), ETHZ (3M)

ETHZ H. Mainaud Durand 2.1 Stretched wire systems for the magnetic measurements of

small-aperture magnets

Sigmaphi (3M), Metrolab (3M)

Sannio S. Russenschuck 2.2 Printed circuit board technology for small-diameter field

probes

Eltos (3M), Sigmaphi (2M)

Sannio S. Russenschuck 3.1 Ultra-precise quadrupole magnets assembly and testing.

Integration of an alignment test-bed towards an industrial production DMP (4M) SYMME (3M) Cranfield / Savoie M. Modena

3.2 Seismic sensor development and vibration characterization LAPP (3M), DMP (3M)

Savoie A. Gaddi 3.3 Nano-positioning of the main LINAC quadrupole as means of

laboratory pre-alignment

TNO (3M) Delft TBD 4.1 Alignment and resolution of a Beam Position Monitor

operating at microwave frequencies in the nanometre regime

NI (3M) Valencia M. Wendt 4.2 Development of direct measurement techniques for the in-situ

internal alignment of accelerating structures

NI(3M) Valencia N. Catalan Lasheras

(9)

Marie Curie action

PACMAN

High quality of the training program:

o Training through research at CERN and at universities

o Exchange of knowledge through secondments in the industrial partners

o Scientific, academic and technological training courses including trainings

organized by PACMAN

o Transferable skills training courses

3 PACMAN workshops, with training and dissemination purposes:

o First workshop: setup the scenario: presentation of the state of the art by

industrial partners, presentation of the PhD subjects by ESR

o Second workshop: present the first results and conclusion concerning each

subject

o Third workshop: conclusion of the project in front of invited experts

A workshop on Intellectual Property and technology transfer, organized with the KT group at CERN, including a training session prepared by the WIPO (World International Property Organization), with other participants as Hexagon, TNO and NI, with practical cases prepared by their IP department.

 Participation in external conferences and workshops : LCWS, IBIC, IWAA, MT, IMMW, IPAC, etc.

 Special emphasis put on women scientists  Dedicated outreach activities

(10)

PACMAN Organization: schedule

(11)

WP6 Diss & Outreach M. Modena

Supervisory Board

CERN,

HEXAGON, ETALON, ELTOS, METROLAB, DMP, SIGMAPHI, TNO, NI DELFT, CRANFIELD, SANNIO univ., LAPP, ETHZ,IFIC, SYMME

WP0 Management H. Mainaud Durand WP5 Training N. Catalan Lasheras WP4 Beam Instrumentation WP3 Precision mech. & stabilization WP2 Magnetic Measurements WP1 Metrology & Alignment ESR1.3 ESR4.1 ESR3.1 ESR3.2 ESR3.3 ESR2.2 ESR2.1 ESR1.2 ESR1.1 ESR4.2

Management team

(12)

Status / Next steps / open issues

 Grant agreement under preparation

• Global budget: 360 persons-months paid by EC

• IP aspects under discussion with NI and TNO

• Consortium agreement under preparation  Web site under definition: http://cern.ch/pacman

 Opening of applications expected mid June 2013.

Open issues

 Find a place for the project, with 5 offices, 3 labs, for 4 years, in a place thermally stable (20°C ± 1°C), with low level vibrations.  Looking for a CERN supervisor for ESR3.3 (Nano-positioning)

(13)
(14)
(15)

PACMAN is a golden opportunity:  For the students:

o Exposure to leading edge technology o Work on state of the art equipment

o Evolve in a multi-disciplinary and multi-cultural institution as CERN o Work with a large network of industries and universities

o High quality training and outreach activities organized by the network

For the supervisors:

o Get highly qualified manpower for their project o Better knowledge of the other disciplines

o Develop contacts with industries and universities

For associated partners:

o Get trained manpower during the secondment o Develop synergies with other partners

o Attract international researchers to strengthen their team

For the CLIC project:

o To push technologies and methods to improve the alignment of the CLIC

components, which is critical challenge for the project.

o To have a network of industries in order to provide solutions for the future,

towards a CLIC future approval  For CERN:

o To extrapolate the methods and technologies developed to other projects

o To strengthen the links between different domains as metrology, magnetic

measurements, magnet design, beam instrumentation, micrometric alignment

References

Related documents

Sonic Advance 2 (USA) (En,Ja,Fr,De,Es,It) Sonic Advance 3 (USA) (En,Ja,Fr,De,Es,It) Sonic Battle (USA) (En,Ja,Fr,De,Es,It) Sonic Pinball Party (USA) (En,Ja,Fr,De,Es,It) Sonic

Bei der Installation der Dunstabzugshaube an einen Anschluss oder mit einem Gerät für Verbrennungen, wie Herd, Ofen oder Heizung, welche lokal angeschlossen werden,

Wenn die Garantie geltend gemacht werden kann, wird IKEA durch seinen eigenen Kundendienst oder einen autorisierten Servicepartner nach eigenem Ermessen das schadhafte

a) La duración de la garantía Krups es la correspondiente al país donde se utilice el producto, aún cuando la duración de la garantía donde haya sido comprado el producto dentro de

 Εάν είστε έγκυος, πρέπει να παρακολουθείτε την αρτηριακή σας πίεση τακτικά διότι μπορεί να ποικίλει σημαντικά στην περίοδο της κύησης.  Αυτή η συσκευή

Wenn die Garantie geltend gemacht werden kann, wird IKEA durch seinen eigenen Kundendienst oder einen autorisierten Servicepartner nach eigenem Ermessen das schadhafte

Détartrez régulièrement votre machine avec la trousse de détartrage Krups (numéro F054), disponible dans les centres de service agréés Krups (visitez Krupsonlinestore.ca pour

Pour mettre en œuvre le service après-vente en cas de panne couverte par la garantie contractuelle, ou pour obtenir des informations techniques pour la mise en service ou le