• No results found

Complex engineering objects construction using Multi-D innovative technology

N/A
N/A
Protected

Academic year: 2021

Share "Complex engineering objects construction using Multi-D innovative technology"

Copied!
22
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 4 illustrates the concept of a data ‘hub’ (i.e. central data source). This hub is utilized to  store data and establish key data relationships (such as equipment to documents) which are  then  utilized  in  CM  and  design  basis  process,  as  well

References

Related documents

Neighbour-joining (NJ) phylogenetic tree of STEC isolates based on 2069 genes (defined as core genome) shared by 137 STEC isolates (including five reference STEC).. Whole tree

We feel that the key is to (1) select appropriate words that children will encounter while reading, (2) teach students to relate words to their own background knowledge, (3)

(2013) Higher Carbohydrate Antigen 125 Levels Are Associated with Increased Risk of Coronary Heart Disease in Elderly Chinese: A Population-Based Case-Control Study.. This is

BACKGROUND: The main goal of psychiatric care is not to be focused only on reducing psychopathological symptoms, but on improvement of the patient's quality of life.

The Eastern European IT market has a total value of € 12 778 million and is growing at an average annual growth rate of more than 10.6%.. Particularly strong growth rate is seen

[r]

This paper presents a case study based research of both the method and technology for integration of sustainable design analysis (SDA) and building

When assessing the relative objective financial risk of capitation contracts, the key question to providers is: "Are the costs at my organization predominantly fixed