Tunneled access to multistorey parking inside the Park of the Castle, Brescia
Client:
Brescia mobilità S.p.A.
Head designer:
Via Ingegneria SrL – Eng. Matteo Di Girolamo
Assignment:
Preliminary and detailed design stage
Role:
Structural and civil engineers
Percentage held on contract:
100%
Mission:
Design a new underground parking under the historical castle area
Location:
Brescia, Italy
Year of implementation:
2011
Construction cost:
€ 21.991.013
References on tunnels
Design of the new tunnel in Monte Ripoli, Tivoli
Client: Municipality of Tivoli
Team members: VIA ingegneria SrL
Mission: Detailed design and Study of Environmental Assessment of the “Tunnel-Monte Ripoli”
Location: Tivoli (RM)
Year of implementation:2008 - ongoing Progress: Design completed
Design of Route n°684 including Monteluco tunnel, L’Aquila
Client: Anas - Compartimento dell’Abruzzo Team members: VIA ingegneria SrL
MIssion: Detailed design of Route n°684 including Monteluco tunnel, L’Aquila Location: L’Aquila (AQ)
Year of implementation:2009 - ongoing Progress: Design approved
Design of the S. Lucia tunnel, Naples
Client: RFI SpA
Team members: VIA ingegneria SrL
MIssion: All stages of design of the S. Lucia tunnel, Naples - Nocera Inferiore - Salerno
Location: Naples (NA)
Construction cost: 29.000.000 Euro Progress: Design approved
Route n°52 Carnica - Design of the second tunnel at Comelico
Client: ANAS SpA - Compartimento per la viabilità del Veneto Team members: VIA ingegneria SrL
MIssion: Preliminary design of the Route n°52 Carnica - Design of the second tunnel at Comelico
Location: Belluno (BL)
Year of implementation:2003 - 2004 Construction cost: 60.000.000 Euro Progress: Design approved
Tunnel of the route n° E78 so called - Guinza
Client: Anas SpA - Compartimento per la viabilità delle Marche Team members: VIA ingegneria SrL
Mission: Detailed design of Tunnel of the route n° E78 so called - Guinza Location: Ancona (AN)
Year of implementation:2003 Construction cost: € 91.000.000 Progress: Design approved
New tunnel between Foro Italico and via Pineta Sacchetti - Passante a Nord-Ovest
Client: Astaldi SpATeam members: VIA ingegneria SrL
Mission: Detailed and construction design of the New tunnel between Foro Itali-co and via Pineta Sacchetti - Passante a Nord-Ovest
Location: Roma (RM)
Year of implementation:2002 - 2005 Construction cost: 22.700.000 Euro Progress: Work completed
Design of the tunnel along the route n°80 - Svincolo Teramo - Centro e Galleria San Giuseppe
Client: COOP Costruttori - Impresa Sparaco SpartacoTeam members: VIA ingegneria SrL
Mission: Detailed design of Design of the tunnel along the route n°80 - Svincolo Teramo - Centro e Galleria San Giuseppe
Location: Teramo (TE)
Year of implementation:2001-2007 Construction cost: 73.400.000 Euro Progress: Works in progress
Tunnels “Sardina” and “Costa del Monte” along the Salerno - Reggio Calabria route
Client: Studio MatildiTeam members: VIA ingegneria SrL
Mission: Detailed design of the new Tunnels “Sardina” and “Costa del Monte” along the Salerno - Reggio Calabria route
Location: SA-RC
Year of implementation:2004 Construction cost: € 90.000.000 Progress: Design completed
References on tunnels
Design of the Canapegna tunnel, Fabriano
Client: Itinera SpA
Team members: VIA ingegneria SrL
Mission:Design of the Canapegna tunnel, FabrianoLuogo: Fabriano (PG) Year of implementation:2005 - 2006
Progress:Design completed
Design of the new tunnel “sinarca” along the route n°16
Colient: Impresa Lungarini
Team members: VIA ingegneria SrL
Mission: Detailed design of the new tunnel “sinarca” along the route n°16 Location: Termoli (CB)
Year of implementation:2003 Progress:Design completed
Design of the services inside the tunnel “Limina” along the route n°682 “Jonio-Tirreno”
Client: Anas SpA - Compartimento per la viabilità della Calabria Team members: VIA ingegneria SrL
Incarico: Detailed design of the services inside the tunnel “Limina” along the route n°682 “Jonio-Tirreno”
Location: Catanzaro (CZ) Year of implementation:2004 Construction cost: € 16.600.000
Progress: Design approved, works in progress
Re design of the Passo della Morte tunnel
Client: Anas SpA - Compartimento per la viabilità delle Friuli Venezia Giulia Team members: VIA ingegneria SrL
Mission: Geotechnical works Location: Trieste
Year of implementation:2002 Construction cost: € 25.000.000 Progress:Design completed
Design along the route Piceno-Aprutina - Tunnel “Croce di Casale”
Client: Anas SpA Compartimento per la viabilità delle Marche Team members: VIA ingegneria SrL
Mission: Detailed design along the route Piceno-Aprutina - Tunnel “Croce di Ca-sale”
Location: Ancona (AN) Year of implementation:2002 Construction cost: € 4.800.000
Highway Messina - Palermo, Tunnel Cozzo Minneria
Client: Impresa Galleria Cozzo Minneria S.c.r.l. Team members: VIA ingegneria SrL
Mission: Detailed design of theTunnel Cozzo Minneria along the Messina high-way
Location: Palermo (PA) Year of implementation:2002 Construction cost: € 20.650.000 Progress: Work completed
New design of the Cerchiarello Sud tunnel along the highway A4 Torino - Milano, Milano
Client: SINA SpATeam members: VIA ingegneria SrL
MIssion: Detailed design of the Cerchiarello Sud tunnel along the highway A4 Torino - Milano, Milano
Location: Milano (MI)
Year of implementation:2005 Progress: Design completed
Design of the tunnel Montegiordano along the route n°106 Jonica tratto 8
Client: ANAS SpA - Direzione generaleTeam members: VIA ingegneria SrL
MIssion: Detailed design of the tunnel Montegiordano along the route n°106 Jonica tratto 8
Location: Amendolara
Year of implementation:2004-2006 Construction cost: 3.360.000 Euro Progress: Design completed
References on tunnels
Tunnel “S. Lucia” along the route Naples - Nocera Inferiore - Salerno
Client: RFI SpA
Team members: VIA ingegneria SrL
Incarico: Detailed design of Tunnel “S. Lucia” along the route Napoli - Nocera Inferiore - Salerno
Location: Naples (NA)
Year of implementation:ongoing Construction cost: € 29.000.000
Tunnel “Palombari”, “San Benedetto”, “Sperlonga” along the route n°89
Client: Anas SpA - Compartimento per la viabilità della Puglia Team members: VIA ingegneria SrL
Mission: Detailed design along the tunnel “Palombari”, “San Benedetto”, “Sper-longa” along the route n°89
Location: Puglia
Year of implementation:2003 Construction cost: 3.400.000 Euro Progress: Works completed
Tunnel “Leonardo, S. Pietro e Paolo, Coreca” along the route n°18 “Tirrena Inferiore”
Client: Anas SpA - Compartimento per la viabilità della Calabria Team members: VIA ingegneria SrLMission: Detailed design of the Tunnel “Leonardo, S. Pietro e Paolo, Coreca” along the route n°18 “Tirrena Inferiore”
Location: Calabria
Year of implementation:2003-2004 Construction cost: 8.600.000 Euro Progress: Design approved
Design of the tunnel along the route n°24 Prato Isarco - Ponte Gardena, Bolzano
Client: Provincia Autonoma di BolzanoTeam members: VIA ingegneria SrL
MIssion: Detailed Design of the tunnel along the route n°24 Prato Isarco - Ponte Gardena, Bolzano
Location: Bolzano (BZ)
Year of implementaion:2010 - ongoing Construction cost: 8.000.000 Euro Progress: Design approved
Tunnel Trisungo and Monte Castello along the route “Trisungo - Acquasanta Terme”
Client: Anas SpA - Compartimento viabilità delle Marche Team members: VIA ingegneria SrL
Mission: Detailed design of the Tunnel Trisungo and Monte Castello along the route “Trisungo - Acquasanta Terme”
Location: Ancona
Year of implementation:2003 Construction cost: € 5.700.000
Tunnel “Tanagro” e “Castelluccio” along the Naples - Reggio Calabria highway
Client: STE SrLTeam members: VIA ingegneria SrL
MIssion: Detailed design of the Tunnel “Tanagro” e “Castelluccio” along the Na-ples - Reggio Calabria highway
Location: NA-RC