HOW TO USE THIS TEMPLATE: Introduction

The   template   reflects   the   steps   set   out   in   the   PRINCE2   Method   and   is  designed to prompt the Project Manager and help in the creation of the Work  Package.   The information for the Work Package will be found within the  Controls   Section   of   the   PRINCE2   Manual.     There   is   also   a   Product  Description for the Work Package at Appendix A of the PRINCE2 Manual. Loading the file This template has been produced using Microsoft Word 97.  To use it, load up  the file directly from the directory and starting from page 1 follow the prompts  (in [...] brackets).  Deleting the [....] text When the template is complete, the whole Work Package document can be  printed and approved.   Prior to printing, you should delete all [....] prompt text. Saving the Work Package document under its own name Save the Work Package document by selecting the “SAVE­AS” command;  this will avoid overwriting the standard template.  You must specify your own  Project Directory. Once your Work Package Document is completed check the document  against the following Quality Criteria: • Is the required Work Package clearly defined and understood by the  assigned resource? • Is there a Product Description for the required product(s) with clearly  identifiedand acceptable quality criteria? • Does the Product Description match up with the other Work Package  documentation? • Are standards for the work agreed?

(2)

• Are the defined standards in line with those applied to similar products? • Have all necessary interfaces been defined?

• Do   the   reporting   arrangements   include   the   provision   for   exception  reporting?

• Is there agreement between the Project Manager and the recipient on  exactly what is to be done?

• Is   there   agreement   on   the   constraints,   including   effort,   cost   and  targets?

• Are the dates and effort in line with those shown in the Stage Plan? • Are reporting arrangements defined?

• Is any requirement for independent attendance at, and participation in,  quality checking defined?

(3)

PROJECT DOCUMENTATION

WORK PACKAGE

Project:

Release:

Date:

Team/Person

Authorised:

PRINCE2

Author:

Owner:

(4)

Insert Project Name Work Package Date:  22 March 2010

Client:

Document Ref:

Version No:

Page  2

(5)

Insert Project Name Work Package Date:  22 March 2010

1 Work Package History

1.1 Document Location

This document is only valid on the day it was printed. The source of the document will be found on the project's PC in location 

1.2 Revision History

Date of this revision: Date of Next revision: Revision 

date Previous revision  date Summary of Changes Changes marked First issue

1.3 Approvals

This document requires the following approvals.  Signed approval forms are filed in the Management section of the project files.

Name Signature Title Date   of 

Issue Version

1.4 Distribution

This document has been distributed to:

Name Title Date   of 

Issue

Version

(6)

Insert Project Name Work Package Date:  22 March 2010

2 Table of Contents

        Page 1 Work Package History 1 1.1 Document Location 1 1.2 Revision History 1.3 Approvals 1.4 Distribution 2 Table of Contents 3 Purpose  4 Work Package Description 5 Product Description(s) 6 Techniques/Processes/Procedures 7 Interfaces 8 Quality Checking Method 9 Configuration Management Requirements 10 Stage Plan Extract 11 Agreements 12 Sign­Off Requirements 13 Work Return Arrangements 14 Completion 15 Constraints 16 Independent Quality Checking Arrangements 17 Reporting 18 Problem Handling and Escalation Page  4

(7)

Insert Project Name Work Package Date:  22 March 2010

Work Package

3

Purpose 

[A Work Package is a set of information about one or more required products collated by  the   Project   Manager   to   pass   responsibility   for   work   or   delivery   formally   to   a   Team  Manager or team member]

4

Work Package Description

5

Product Description(s)

[Each with clearly identified and acceptable quality criteria]

6

Techniques/Processes/Procedures

[State which are to be used]

7

Interfaces

[Interfaces to be maintained during the work and satisfied by the work]

8

Quality Checking Method

[State which are to be used]

9

Configuration Management Requirements

[Identify the individual sub­products of the final product.  Identify those products that will  be required in order to produce other products]

10 Stage Plan Extracts

[Include the extract form the Stage Plan that the products relate to]

11 Agreements

[Joint agreement on effort, cost, start and end dates] Page  5

(8)

Insert Project Name Work Package Date:  22 March 2010

12 Sign­Off Requirements

[State who will be responsible for sign­off for completed products]

13  Work Return Arrangements

[For the return of products on completion]

14 Completion

[State how completion is to be advised]

15 Constraints

[Any constraints to be observed]

16 Independent Quality Checking Arrangements

17 Reporting

[State the arrangements for reporting progress including method and frequency]

18 Problem Handling and Escalation

[Risk identification and what to do when they do occur] Page  6

References

Related documents

Sentinel surveillance of international travellers returning with DENV infections from such regions has been suggested as a valuable tool for filling these current data gaps

Many of the rituals that people perform for Chinese weddings in Singapore are seen as “traditional” and understood as rites that have been passed on through

Our Alcohol range is the latest addition to our extensive products and services offer and we continue developing this range by adding premium products regularly. We currently offer

We have shown that our model can present results that are a priori paradoxical in a Ricardian context: when there is technical progress in North biased towards the most

Recreational angling for Largemouth Bass ( Micropterus salmoides ; herafter referred to as bass) has grown in popularity in recent decades. Bass catch and release angling has become

Using LEGO materials and the ROBOLAB software as the toolset, Tufts University’s Center For Engineering Educational Outreach has had significant success with our efforts to

Figure 4 Convergence curves of the BIWO algorithm for distinct grid layout The results of the studies in published literature related the wind turbine placement problem to a

An inductive loop vehicle detector system consists of three components: a loop (preformed or saw-cut), loop extension cable and a detector.. When installing or repairing an