• Quotation valid for 30 days •
Payment Terms:
• Equipment and spares only: 50% with order 50% on delivery
• Installation: as outlined in clause 4.2 of Motan Colortronic standard Terms and Conditions - 50% with order 40% on notification of ready to dispatch, 10% on completion within 30 days of the date of invoice • Installation work based on continuity, clear and unobstructed site access and Motan Colortronic standard
hours of work apply
• Cost of return crane visits if lift aborted due to weather conditions • Cost of return visits if lift aborted due to weather conditions
• Delivery and installation (if quoted) are based on receipt of official order, payment of initial deposit and clarification of all points
• Method of transport - by road, unless otherwise specified • Prices subject to VAT at standard rate
• Motan Colortronic Standard Terms and Conditions of Sale apply (see attached), available to view on our website
• Throughputs are approximate and are based on equipment and any filters being new and in full working order with cutting devices such as blades, discs, sieves etc. being complete, new, sharp and damage free and correctly set
• The material must be free from any foreign bodies like e.g. metals, stones, glass or sand etc. that could damage, destroy or reduce the performance of the equipment, rotor, housing, knives, sieves, screen’s, filters or any other such parts.
• Depending on the feeding of the input material, material nature, type, shape, size, density, viscosity moisture, parts, products etc. to be processed actual throughputs, flow, accuracy, resolution and or lifetime may vary
• Sufficient cooling, airflow and water spray as well as consistent and correct infeed of the material is required at all times to ensure the correct performance of the equipment
• Where applicable, the customer will be expected to give adequate machine downtime during normal working hours to allow installation to take place (if quoted)
• We highlight that all equipment must be installed, operated and serviced in line with the procedures outlined in the manuals and instruction documents available
• In the event that installation or commissioning, is not completed by a Motan Colortronic engineer. The customer must have evidence of correct commissioning procedures to validate the warranty.
• In the event of problems related to start-up or incorrect commissioning, any warranty costs will be the customers responsibility
• The supply, connection or fitting of non-supplied Motan Colortronic Ltd parts or equipment invalidates any warranty or specified performance
Page 2 of 6
EXCLUSIONS: (unless specified elsewhere)
• Improper use, operation of the unit with improperly fitted or non-functional safety equipment, not observing the instructions, requirements and prohibitions of the operating manual, unauthorised modifications, insufficient monitoring of parts subject to wear, improper maintenance and repair work not performed on schedule or as required invalidates any CE conformity and any warranty provided with the equipment.
• A prerequisite for our warranty is the regular maintenance of our equipment, machines and our plant • Chillers and equipment should be protected from particle contamination. Where this is likely, a strainer
or precautions should be fitted or taken and regular maintenance checks implemented
• We reserve the right to offer and implement design improvements to the products and equipment in the light of never-ending optimization of the equipment
• Any drawings, illustrations or pictures contained in the supplier’s quotation or brochures are issued or published for the sole purpose of giving an approximate idea of the goods or services described in them • The equipment components are generally clean prior to delivery. However, we assume that further cleaning / sanitizing be required prior to putting the equipment into service that this will be undertaken by the customer
• Flushing and or cleaning of existing systems and or pipework • Delivery, packaging, off-loading and safe/dry storage of equipment
• Storage of goods for up to one working week beyond the agreed scheduled despatch date. Goods will then be stored and the specific storage and handling costs will be advised accordingly
• Removal, disposal and recovery of packaging material and waste
• Any special packaging, export documentation, manuals, import taxes or duties
• Removal and disposal of existing equipment, machine adapter plates/lids or modifications • Assembly, erection, installation work, commissioning or training
• Any necessary planning consents, civil works, civil engineering/design or approval and any required weather sealing
• Foundation and modification works to the building, air or ground channels for cables
• The customers’ existing structures and foundations must be suitable and have adequate strength to bear the required loadings by us and/or resulting from use of our equipment
• Sound insulation or other requirements by HSE or Local Authorities • Sufficient ventilation in the area of the supplied machine and/or equipment
• Precautions against odour due to contamination, any chemicals to support the cleaning process • Precautions against explosion risks, anti-wear protection against abrasive material or corrosion • Anti-honking measures to prevent and or reduce quaking due to storage of certain materials
• Channels, pits, containers, piping for dirty and clean water collection and drainage or exhaust air ducting • Dirty/clean water treatment beyond our offered mechanical water treatment (if quoted)
EXCLUSIONS cont.: (unless specified elsewhere)
• Access and lifting equipment, access platforms, banisters, supports or lifts on site which may be required • Devices for assembly, fork trucks, cranes and other such equipment
• Any tools, platforms, PPE and means required for the maintenance of equipment or re-sharpening of knives
• The supply and installation of power, air or water supplies to the required points including: Connection of your electrical supplies to our equipment, or cabling and plugs to do so
Electrical earthing, grounding or bonding of units, day bins, silos and any other such requirement Earth continuity conductor
Earth plate, electrode or rod
Provisions against lightening, static, electromagnetic impulse, electrical discharge, surge protection and any other such requirement
Connection of compressed air line to any of our equipment, or the pipe and fittings to do so Water fittings and pipe, or the connection of our equipment to your water supply or tooling Any other such requirements are the responsibility of the customer
• Control units or integration of equipment when delivering single components
• Supply and connection of required machine signals or inputs/outputs required from the customer's machine/equipment
• Provision of single or three phase supplies and isolators as required • Automatic air filtering units or systems
• Provision to ATEX measurements EU Policy 94/9/EG, fire rating or any other such special requirement or norm
• ATEX directive 99/92/EC has been implemented in the UK as part of DSEAR (The Dangerous Substances and Explosive Atmosphere Regulations 2002) and it is the responsibility of the end user • We have assumed that the plot or location on which the equipment is to be located is a safe area and is
not bounded or overlapped by adjacent hazardous areas / either combustible dust or gas as defined by the ATEX directives
• We have assumed the material to be handled is not explosive, flammable or toxic and does not contain any constituents that may lead to an exothermic reaction, reduced lifetime of the equipment, corrosion etc.
• All clients purchasing granulator, washing plant, sink / swim tank, spares or any other recycling equipment where water is used or may be present are responsible to ensure of the correct water treatment and or that any additives or constituents do not react with the supplied parts or equipment which may lead to damage, reduced lifetime, corrosion or any such issue.
• We recommend in all cases the customer should consult a water, or such specialist for obtaining recommended items for both initial and ongoing treatment of their specific conditions and system.
Page 4 of 6
EXCLUSIONS cont.: (unless specified elsewhere)
• All clients purchasing water cooling or temperature control equipment should consult a water treatment specialist for obtaining recommendations for both initial and ongoing treatment of their specific water conditions and system
• Where glycol antifreeze is required for frost protection, the suppliers recommended concentration levels must be maintained at all times and the glycol must contain suitable inhibitors, clients should consult a specialist in this field
• Equipment using oil must be checked and the correct liquid used according to the application and working temperature range to avoid damage and excessive wear and tear to the equipment
• Delivery of equipment during weekend or out of normal working hours • Any specialist inspections / leakage / load test (factory or site)
• Any inter connecting pipework, water pumps, condensate pumps, valves, strainers, fittings, traps and drains
• Any additional system additives i.e. glycol, refrigerant, water treatment chemical (Biocides) etc. or associated dosing equipment
• Water systems balancing / commissioning • Any temperature or pressure test points • Trace heating of water services and pipework
• Provision of chiller / heat testing during commissioning • Post manufacture storage
• Site equipment protection
• Piping to atmosphere of refrigerant relief valve vent pipes • Specific / unique project drawings
• Provision of any O & M manuals outside of manufactures standard literature • Any onsite steelworks for supporting unit(s) or associated items
• Project management
EXCLUSIONS cont.: (unless specified elsewhere)
General Requirements & Working Conditions
Motan Colortronic & Metal Detection Equipment
The designed equipment and systems are built up in line with the following rules: - Measuring System – Metric
Language – English • Electrical Supply 400v – 50hz – three phase Signal cable 0v 230v – 50hz – single phase 24v control voltage • Compressed Air Dry 5-7 bar max • Environmental Conditions
According to the applicable EN60204-1 standard equipment +5°C -40°C and a relative humidity not exceeding 50% at 40°C
The performance of our equipment is based on a Max of 100mt (3,280ft) from the sea level • Process water for granulation, shredding hot and cold wash plant and other such recycling equipment • The processed water has to fulfil the following minimum specification
Suspended solids < 100mg/L COD 500mg/L
pH value 6.8 – 7.4
• The defined valves are chosen to minimise mechanical wear caused by inert content as well as reducing corrosion caused by low pH values.
• Water hardness cold wash 14° dH
Page 6 of 6
EXCLUSIONS cont.: (unless specified elsewhere)
Regloplas & Reglochill Thermal Regulators, Chillers and Equipment
• The processed water has to fulfil the following minimum specification Appearance – Clear/without sediment
Clud ,0.5 NTU (very light cloud) Total Hardness 10̊ dH
pH value 6.5-8.5
Conductivity max 500µs/cm Carbonate hardness ,5° dH
• Addition of RK93 corrosion inhibitor is also recommended (see RK93 data sheet)
Thermal Oil Minimum Requirement
• Synthetic oil R0300 or therminol 66
• The film temperature of the therminol oil must be 40°C above the outlet temperature of the temperature control unit
• Working Voltages
Nominal voltage of +/- 10% nominal frequency +/- 5% • Ambient temperature 10°C – 40°C
• Max humidity 80% at 40°C (sea level)
• Sufficient ventilation must be ensured during setup
• The distance between devices and or between the temperature control unit and a wall must be at least 10cm
• The ventilated slots must not be covered