DOCUMENT REVIEW AND COVER SHEET

Company:

Construction Contractor:

Engineering Contractor:

Engineering and Technical Services:

Review :

PROJECT

Gazprom Neftekhim Salavat Acrylic Acid / Acrylates Plant

(RSAE) Project Bashkortostan, Russian Federation

CONTRACT NO

88621 - December, 2012

DOCUMENT TITLE

ITP for MOTORS

DOCUMENT NUMBER

RSAE

- ITP - QA - EL - 010

REV. A1

DOCUMENT DESCRIPTION

Inspection and Test Plan (ITP)

Status

Status Code

Code Description

1

APPROVED WITHOUT COMMENT

2

REVISE AND RESUBMIT. WORK MAY PROCEED SUBJECT TO

INCORPORATON OF CHANGES INDICATED.

3

REJECTED. TO BE REVISED B: RESUBMITTED. WORK MAY NOT PROCEED

4

INFORMATION ONLY. REVIEW NOT REQUIRED. WORK MAY PROCEED

5

CANCELLED/SUPERSEDED

Revieved Engineer: NAME

SIGN

DATE

Remarks or Comments:

Document Number:

Revision:

RSAE

ITP

QA

EL

010

A1

(2)
(3)

REVISION SHEET

Revision Description of changes

Page

A1

First Issued For approval

Document Number:

Revision:

RSAE

ITP

QA

EL

010

A1

(4)

Gazprom Neftekhim Salavat Acrylic Acid / Acrylates Plant (RSAE) Project

Inspection and Test Plan

Motors

Issue Date: 17/09/2014

Doc. Number:

RSAE-ITP-QA-EL-010

Revision: A1

Page:

1 of 1

No

DESCRIPTION OF ACTIVITY

CONTROL DOCUMENT

ACCEPTANCE CRITERIA

VERIFICATION DOCUMENT

RC

INVOLVEMENTS

MHI

Owner

1

1.1

Installation Inspection

1-

Check cable glanding and

termination

2-

Check earthing

3-

Check rating plate

4-

Check space heater

5-

Check motor type according to

location

3935 E321-00100

3935 E321-00200

Spec./DWG

RSAE-FRM-226

R

S

S

1.2

Insulation Resistance Test

Method of Statement for

Motors

LV Motors: 500 VDC 1 Min

>50 MOhm

MV Motors: 2500 VDC 1

Min

>50 Mohm

RSAE-FRM-226

R

S

-

1.3

Phase Rotation Test

Method of Statement for

Motors

Method of Statement for

Motors

RSAE-FRM-226

R

S

-

1.4

Motor Solo Run Test

Method of Statement for

Motors

Method of Statement for

Motors

RSAE-FRM-226

H

H

S

LEGEND

RC: Renaissance Construction, MHI:

Mitsubishi Heavy Industries, GNS: Gazprom Neftekhim Salavat, W: Witness, R: Review, H: Mandatory Hold Point, S: Surveillance (Random Check)

(MV motor and outdoor LV motor only)

DWG:

1. MV Motor

3935 E321-00100 (WEG)

3935 E321-00110 (HHI)

2. LV Motor

3935 E321-00200 (WEG)

3935 E321-00210 (HHI)

MV Motors: 1000V DC 1Min (WEG)

2500V DC 1Min (HHI) (SEIMENS)

  >100Mohm

>100Mohm

(WEG, HHI)

>50Mohm

(Others)

Instruction Manual:

3935 E421-00110 (WEG)

3935 E421-00120(HHI)

W

W

W

W

W

W

W

S

S

W

(MV motor and outdoor LV motor)

Owner

gland

As per drawing

ATTACHMENT:

1. RSAE-FRM-226 Inspection Check List for Motor

2. RSAE-FRM-xxx Inspection Check List for Motor Solo Run

XXX

Method of Statement for Motors

and Vibration limit shall be

referred to IEC 60034-14

(5)

Date: Area Check List Ref. No. :

DWG No.: Motor Tag

Power (HP/kW)

Rated

Current RPM Rated Voltage Type / Serial Number

No RC MHI GNS Remarks 1 2 3 4 5 6 7 8

Motor Insulation Resistance testing Phase-PE (MΩ) Result (OK/NG) After 1 Min After 10 Min PI No 1 2 3 No 1 2 Min 1 Min 5 Min 10 Min 15 Min 20 Min 25 Min 30 DE NDE Equipment serial No

Testing Instruments List [The calibration certificate of the testing instruments shall be attached]

Name Manufacturer Calibration date

Record direction of rotation Record Starting Current

4

Record No Load Current

________________A ________________A ________________A ________________A ________________A ________________A 3 _______________ _______________ Record Vibration (mm/s RMS) RSAE-FRM-226 Date: RSAE-FRM-226

RFI Ref. No. :

OWNER - QC ENGINEER Name/Surname: Signature: Date: MHI – QC ENGINEER Name/Surname: Signature: Date:

Motor Solo Run Test

Signature:

Verify that if the motor installed in accordance with project design and the vendor manual

RONESANS – QC ENGINEER

Rotate the motor shaft manually (if possible) to ensure that the rotor moves freely, without rubbing Check visually if the conduits, bushings are sealed

Check earthing system connection

Ensure that the motor is clean and dry. End bells, covers, filters, and accessories shall be firmly attached.

After Connection of Cable

Check Cable connection, ensure that it is torqued and marked

Test Voltage : __V DC Minimum resistance : _________MΩ

Check Insulation Resistance of Motor and Motor Cable together against Earth

Check the functionality of Space heater and Insulation Resistance

against Earth ______________ Mohm

Verify that the motor protection circuits have been set and all protective relays tested

INSPECTION CHECK LIST

Acrylic Acid Plant

SALAVAT, BASHKORTOSTAN, RUSSIAN FEDERATION

Name/Surname:

Inspection and Check List for Motor

Ensure that motor cables checked and tested

______________ Mohm Before Connection of Cable

Check for any damage

________________A ________________A

0AO

Owner

cable gland is connected tightly/cable is connected correct torque strength/Torque marking

To be included

" Check the nameplate and Tag number"

Phase - Ground

Motor solo run test to be

separated sheet, referred

to attached

"Format_Motor_Solo Run

Test_(Sample).xls"

MHI suppose the motor solo run will be done until saturate

the temperature. generally it is 2hours.

Location

References

Related documents

It focuses on teachers’ readiness to teach phonological awareness and conducting the LINUS 2.0 LBI programme, the effect of phonological awareness on pupils’ English proficiency,

Price Float Price of particular medicine Profit Int Profit percentage at medicine Supply date Datetime Supply date of

Using the BOM with Usage Engineering/design which was created by the Engineering Department create a group bill of material with Usage Production that can be assigned to plants or

vii. Competitors may choose at which Summer and Winter Regional Championship they compete and may compete in different Regionals if they have qualified more than one horse. The

participating in DOVE had on HVs such as increasing their understanding of IPV and its impacts and increasing their confidence in using new skills to intervene with

Choose a Diet·with Plenty of Vegetables, Fruits and Grain Products Foods that provide complex carbohydrates, dietary fibre, and other components are linked to good

As a result of the research, the strategic management functions of the animal feedingstuff milling of the region are divided among the three entities – a

has sexually transmitted disease” (Mar.. Everyone would like to control his or her own public image. 62 People sometimes do things in private that they are not proud of and do