DOCUMENT REVIEW AND COVER SHEET
Company:
Construction Contractor:
Engineering Contractor:
Engineering and Technical Services:
Review :
PROJECT
Gazprom Neftekhim Salavat Acrylic Acid / Acrylates Plant
(RSAE) Project Bashkortostan, Russian Federation
CONTRACT NO
88621 - December, 2012
DOCUMENT TITLE
ITP for MOTORS
DOCUMENT NUMBER
RSAE
- ITP - QA - EL - 010
REV. A1
DOCUMENT DESCRIPTION
Inspection and Test Plan (ITP)
Status
Status Code
Code Description
⃝
1
APPROVED WITHOUT COMMENT
⃝
2
REVISE AND RESUBMIT. WORK MAY PROCEED SUBJECT TO
INCORPORATON OF CHANGES INDICATED.
⃝
3
REJECTED. TO BE REVISED B: RESUBMITTED. WORK MAY NOT PROCEED
⃝
4
INFORMATION ONLY. REVIEW NOT REQUIRED. WORK MAY PROCEED
⃝
5
CANCELLED/SUPERSEDED
Revieved Engineer: NAME
SIGN
DATE
Remarks or Comments:
Document Number:
Revision:
RSAE
ITP
QA
EL
010
A1
REVISION SHEET
Revision Description of changes
Page
A1
First Issued For approval
Document Number:
Revision:
RSAE
ITP
QA
EL
010
A1
Gazprom Neftekhim Salavat Acrylic Acid / Acrylates Plant (RSAE) Project
Inspection and Test Plan
Motors
Issue Date: 17/09/2014
Doc. Number:
RSAE-ITP-QA-EL-010
Revision: A1
Page:
1 of 1
No
DESCRIPTION OF ACTIVITY
CONTROL DOCUMENT
ACCEPTANCE CRITERIA
VERIFICATION DOCUMENT
RC
INVOLVEMENTS
MHI
Owner
1
1.1
Installation Inspection
1-
Check cable glanding and
termination
2-
Check earthing
3-
Check rating plate
4-
Check space heater
5-
Check motor type according to
location
3935 E321-00100
3935 E321-00200
Spec./DWG
RSAE-FRM-226
R
S
S
1.2
Insulation Resistance Test
Method of Statement for
Motors
LV Motors: 500 VDC 1 Min
>50 MOhm
MV Motors: 2500 VDC 1
Min
>50 Mohm
RSAE-FRM-226
R
S
-
1.3
Phase Rotation Test
Method of Statement for
Motors
Method of Statement for
Motors
RSAE-FRM-226
R
S
-
1.4
Motor Solo Run Test
Method of Statement for
Motors
Method of Statement for
Motors
RSAE-FRM-226
H
H
S
LEGEND
RC: Renaissance Construction, MHI:
Mitsubishi Heavy Industries, GNS: Gazprom Neftekhim Salavat, W: Witness, R: Review, H: Mandatory Hold Point, S: Surveillance (Random Check)
(MV motor and outdoor LV motor only)
DWG:
1. MV Motor
3935 E321-00100 (WEG)
3935 E321-00110 (HHI)
2. LV Motor
3935 E321-00200 (WEG)
3935 E321-00210 (HHI)
MV Motors: 1000V DC 1Min (WEG)
2500V DC 1Min (HHI) (SEIMENS)
>100Mohm
>100Mohm
(WEG, HHI)
>50Mohm
(Others)
Instruction Manual:
3935 E421-00110 (WEG)
3935 E421-00120(HHI)
W
W
W
W
W
W
W
S
S
W
(MV motor and outdoor LV motor)
Owner
gland
As per drawing
ATTACHMENT:
1. RSAE-FRM-226 Inspection Check List for Motor
2. RSAE-FRM-xxx Inspection Check List for Motor Solo Run
XXX
Method of Statement for Motors
and Vibration limit shall be
referred to IEC 60034-14
Date: Area Check List Ref. No. :
DWG No.: Motor Tag
Power (HP/kW)
Rated
Current RPM Rated Voltage Type / Serial Number
No RC MHI GNS Remarks 1 2 3 4 5 6 7 8
Motor Insulation Resistance testing Phase-PE (MΩ) Result (OK/NG) After 1 Min After 10 Min PI No 1 2 3 No 1 2 Min 1 Min 5 Min 10 Min 15 Min 20 Min 25 Min 30 DE NDE Equipment serial No
Testing Instruments List [The calibration certificate of the testing instruments shall be attached]
Name Manufacturer Calibration date
Record direction of rotation Record Starting Current
4
Record No Load Current
________________A ________________A ________________A ________________A ________________A ________________A 3 _______________ _______________ Record Vibration (mm/s RMS) RSAE-FRM-226 Date: RSAE-FRM-226
RFI Ref. No. :
OWNER - QC ENGINEER Name/Surname: Signature: Date: MHI – QC ENGINEER Name/Surname: Signature: Date:
Motor Solo Run Test
Signature:
Verify that if the motor installed in accordance with project design and the vendor manual
RONESANS – QC ENGINEER
Rotate the motor shaft manually (if possible) to ensure that the rotor moves freely, without rubbing Check visually if the conduits, bushings are sealed
Check earthing system connection
Ensure that the motor is clean and dry. End bells, covers, filters, and accessories shall be firmly attached.
After Connection of Cable
Check Cable connection, ensure that it is torqued and marked
Test Voltage : __V DC Minimum resistance : _________MΩ
Check Insulation Resistance of Motor and Motor Cable together against Earth
Check the functionality of Space heater and Insulation Resistance
against Earth ______________ Mohm
Verify that the motor protection circuits have been set and all protective relays tested
INSPECTION CHECK LIST
Acrylic Acid Plant
SALAVAT, BASHKORTOSTAN, RUSSIAN FEDERATION
Name/Surname:
Inspection and Check List for Motor
Ensure that motor cables checked and tested
______________ Mohm Before Connection of Cable
Check for any damage
________________A ________________A
0AO
Owner
cable gland is connected tightly/cable is connected correct torque strength/Torque marking