Maintain
Training
Facilities
Template #1
OPERATIONAL PROCEDURE Equipment Type Gas Oven
Equipment Code
Location Bread and Pastry Production Workshop Operation Procedure:
Steps/Procedure:
1. Turn on the gas regulator
2. Turn on the switch in the oven burner and place the lighter on the, open the oven
3. Pre-heat the oven for 15-20 minutes.
4. After pre-heating the oven, put the pan and ready to bake. 5. Get the finished product inside the oven.
6. Put the finished product in the cooling work
7. Turn off the oven burner and open the oven door after baking to prevent rusting
8. Let the oven cool before cleaning it.
9. Remove the burned particles by scraping with a blunt scraper.
BREAD AND PASTRY PRODUCTION Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by: Page of
NC II Developed by:
Revision #
Operational Procedure of Equipment Equipment Type Refrigerator
Equipment Code BPP-EQT-001
Location Bread and Pastry Production laboratory
Operation Procedure
1. Be sure to check good air circulation and provide ample space so that air can flow through the rear of the unit and should be located no less than 5 inches from the wall.
2. Place on strong ground enough to support total weight and stable
condition for use and the level from front to back and side to side of the refrigerator.
3. Make sure that the unit should be on dedicated electrical circuit. Do not use extension cords and isolate the unit on an electrical circuit of proper size.
4. Plug in and turn on the power switch located on the bottom of the top grill. The display panel will be lighted. The compressor will begin to run. 5. Set the default temperature setting to 35 degrees F (+1 degree C).
6. The compressor is automatically cycled by the electronic controller.
7. Temperature Control Range 39 degrees F – 28 degrees F (+7 degree C – 3 degree C).
8. The interior light is activated by the door switch when the door is opened. 9. Evaporator fan motor will run after all doors are completely closed.
10. Place black plastic condensate pan thru back or front. Make sure pads
are installed upwards and drain hose is in pan.
BREAD AND PASTRY PRODUCTION Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by: Page of
NC II Developed by:
Template #2
HOUSEKEEPING SCHEDULE
Qualification Bread and Pastry Production NC II Station/Bldg Area/Section BPP Workshop
In-Charge FLOSERFIDA C. MACALINCAG
ACTIVITIES Responsibl
e Person
Schedule for the Month of ______________
Daily Ever y other Day Weekl y Every 15th Day Monthl y Remark s Dispose segregated waste; clean garbage can
Cleaners of the day
X
Sweet floors; if wet, wipe dry
Cleaners of the day
X Wipe and clean
whiteboards
Cleaners of the day
X Clean and arrange
working tables
Cleaners of the day
X
Clean and check equipment
Cleaners of the day
X Before leaving, collect
food waste
Cleaners of the day
X Dispose segregated
waste; clean garbage cans
Center Utility/train ee/trainer
X
Clean posters, visual aids Trainee/Trai ner X Clean bulbs/lamps/ceilings/wal ls Center Utility/train ee/trainer X Clean/wash of window/glasses/mirrors Center Utility/train ee/trainer X
Clean and check tools, utensils, machines, supplies and materials Center Utility/train ee/trainer X
Sanitize garbage receptacles Center Utility/train ee/trainer X
Clean and arrange tool room Center Utility/train ee/trainer X Inspect electrical system; clean cables, wires Center Utility/train ee/trainer X Clean instructional materials and modules; arrange and put in order
Center Utility/train ee/trainer
X
Inspect and clean fan Center Utility/train ee/trainer X BREAD AND PASTRY PRODUCTION NC II Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by:
Page of Developed by:
BREAD AND PASTRY PRODUCTION WORKSHOP HOUSEKEEPING SCHEDULE
DAILY TASK YES NO
Dispose segregated waste; clean garbage can Sweet floors; if wet, wipe dry
Wipe and clean whiteboards Clean and arrange working tables Clean and check equipment Before leaving, collect food waste
WEEKLY TASK YES NO
Dispose segregated waste; clean garbage cans
Clean posters, visual aids
Clean bulbs/lamps/ceilings/walls Clean/wash of window/glasses/mirrors
Clean and check tools, utensils, machines, supplies and materials Sanitize garbage receptacles
MONTHLY TASK YES NO
Clean and arrange tool room
Inspect electrical system; clean cables, wires
Clean instructional materials and modules; arrange and put in order Inspect and clean fan
Clean and arrange tool room
BREAD AND PASTRY PRODUCTION NC II Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by:
Page of Developed by:
BLANK TEMPLATE # 2 EQUIPMENT MAINTENANCE SCHEDULE
EQUIPMENT TYPE Industrial Oven
EQUIPMENT CODE
LOCATION Bread and Pastry Production Workshop
ACTIVITIES MANPOWER
Schedule for the Month of SEPTEMBER 2015
Daily Every Other Day Weekly Every 15th Day Monthly Remarks 1. Clean and check the oven Trainee/Trainer X 2. Oven general cleaning Trainee/Trainer X 3. Checking of gas hose and regulator Trainee/Trainer X 4. Changing of gas Trainee/Trainer X BREAD AND PASTRY PRODUCTION NC II Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by:
Page of Developed by:
BLANK TEMPLATE # 2 EQUIPMENT MAINTENANCE SCHEDULE
EQUIPMENT TYPE Industrial Dough Kneading Machine
EQUIPMENT CODE
LOCATION Bread and Pastry Production Workshop
ACTIVITIES MANPOWER
Schedule for the Month of SEPTEMBER 2015
Daily Every Other Day Weekly Every 15th Day Monthly Remarks 1. Clean and check the machine Trainee/Trainer X 2. Greasing the machine Trainee/Trainer X 3. Checking of electrical wirings Trainee/Trainer X 4. Checking the parts of the machine Trainee/Trainer X BREAD AND PASTRY PRODUCTION NC II Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by: Page of
Revision #
Blank Template No. 3
HOUSEKEEPING INSPECTION CHECKLIST Section/Area
In-Charge
Bread and Pastry Production
YES NO INSPECTION ITEMS
1. Are the walls, ceiling, floors, aisles and other fixtures
well-cleaned and in order?
2. Are all furniture free from dust and in order?
3. Is the equipment arranged properly for the purpose of
learning and skills development, safety and maintenance ? 4. Is the equipment well-cleaned and in order?
5. Are learning areas properly lighted and well ventilated?
6. Are the chairs and tables arranged properly?
7. Are comfort room cleaned and with enough supply of water?
8. Are waste properly disposed?
Inspected by: Date:
BREAD AND PASTRY PRODUCTION Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by: Page of
NC II Developed by:
Revision #
Blank Template No. 4 : MAINTENANCE INSPECTION CHECKLIST
Equipment Type : Industrial Oven Property Code/Number:
Location : Bread and Pastry Production Workshop Person-In-Charge : FLOSERFIDA C. MACALINCAG
Inspected by : Date of Inspection :
YES NO INSPECTION ITEMS
1. Is the oven cool before cleaning it?
2. Is the burnt food particles cleaned and removed after baking?
3. Is the oven rinse with water and dry with clean cloth? 4. Is the hose and regulator checked after used?
BREAD AND PASTRY PRODUCTION NC II Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by:
Page of Developed by:
Revision #
Blank Template No. 5:
EQUIPMENT RECORD W/ CODE AND DRAWING
No Location Eqpt.
No. Qty Title
Descriptio n PO No. Drawing Ref. 1 BPP Workshop PLMA R- BPP-001 2 units Industria l Oven Gas Oven, RP made, stationary type; 8 tray capacity; LPG fired; enamel finished; 49”H, 4’L SNMC511 2 BPP Workshop PLMA R- BPP-002 3 units Commerc ial mixer with complete attachme nt Hobart type, made in RP, 20 QTRs. Cap. ¾ HP US electric motor, 3 speed driven, complete with stainless steel, bowl, SNMC512
whire whip, dough hook & Flat beater 3 BPP Workshop PLMA R- BPP-003 1 unit Dough Kneader Local fabricated, 2HP, Single Phase, 200V, 60Hz, 43”H x 10”W x 43”D, 15 kg. SNMC513 4 BPP Workshop PLMA R- BPP-004 1 unit Commerc ial Bread Cutter 30 US blades, ¼ HP, electric motor table, 200V 60Hz, Single Phase, made in RP SNMC514 5 BPP Workshop PLMA R- BPP-005 2 units Gas range “La Germania w/ oven 3 gas, 1 electric SNMC515 6 BPP Workshop PLMA R- BPP-006 1 unit Refrigera tor Refrigerator “Sharp” 7 cu ft. Manual defrost single door SNMC516 7 BPP Workshop PLMA R- BPP-007 1 unit Industria l electric fan “3D Brand 24” blade diameter 3 speeds, 220V/60Hz SNMC517
BREAD AND PASTRY PRODUCTION NC II Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by:
Page of Developed by:
Revision #
Blank Template No.6:
TAG-OUT BILL
DANGER/CAUTION TAG-OUT INDEX AND RECORD AUDITS LOG SERIAL DATE ISSUED TYPE ( Danger/Caution) DESCRIPTION (System Components, Test reference ,etc. DATE COMPLETED 001 01/6/15 Danger-defective in cord 30 US blades, ¼ HP, electric motor table, 200V 60Hz, Single Phase, made in RP 01/8/15 002 01/8/15 Danger-Overheating gas range “La Germania w/ oven 3 gas, 1 electric
01/10/15
003 01/9/15 Out of Order Freezer “ White
Westinghouse” Chest
type, Big
Prepared by: Approved:
FLOSERFIDA C. MACALINCAG ___________________ Trainer Supervisor BREAD AND PASTRY PRODUCTION NC II Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by:
Page of Developed by:
Revision #
Blank Template No. 7:
WASTE SEGREGATION LIST
Section/Area BREAD AND PASTRY PRODUCTION
WORKSHOP GENERATED /
ACCUMULATED WASTE
WASTE SEGREGATED METHOD
Recycle Compost Dispose
1. Egg shell x
2. Tissue paper x x
4. Paper cups x
5. Aluminum foil x
6. Broken Wooden spoon x
7. White board marker x
8. Rugs x 9. Lighter x 10. Pastry bags x 11. Paper x x 12. Plastics x 13. Styrofoam x 14. Can bottles x BREAD AND PASTRY PRODUCTION NC II Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by:
Page of Developed by:
Revision #
BLANK TEMPLATE No. #8
BREAKDOWN / REPAIR REPORT Area /
Section
: Bread and Pastry Production Laboratory
Area / Section
:
FACILITY TYPE NATURE OF
BREAKDOWN RECOMMENDATION
Industrial Oven regulator
Refrigerator Condenser not
functioning Replacement of Condenser
Reported by: Date
FLOSERFIDA C. MACALINCAG
Signature Over Printed Name BREAD AND PASTRY PRODUCTION NC II Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by: Page of Developed by: Revision # WORK REQUEST Unit No.001
Description: Industrial Oven Observation:
The hose and regulator should be replaced
Date Reported: January 25, 2015
Reported by: FLOSERFIDA C. MACALINCAG
Activity: Date completed:
Replacement Sign:
Spare parts used: Hose and regulator
WORK REQUEST Unit
No.002
Description: Refrigerator Observation:
The condenser is not functioning
Date Reported: January 25, 2015 Reported by: FLOSERFIDA MACALINCAG
Activity: Date completed:
Replacement Sign:
Spare parts used Condenser
BREAD AND PASTRY PRODUCTION NC II Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by: Page of Developed by: Revision # Blank Template 10 SALVAGE REPORT Area / Section
: Bread and Pastry Production Laboratory
Area / Section
:
FACILITY TYPE PART ID RECOMMENDATION
Refrigerator Hose and regulator Replacement
Refrigerator Condenser Replacement
Reported by: Date
FLOSERFIDA MACALINCAG
Signature Over Printed Name BREAD AND PASTRY PRODUCTION NC II Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by:
Page of Developed by:
Revision #
INSPECTION REPORT
FACILITY TYPE INCIDENT ACTION TAKEN PROGRESS/
REMARKS
Industrial Oven
Gas leakage Replacement
No leakage of gas after replacement of hose and regulator Refrigerator Refrigerator not functioning
Replacement Machine is functional
Reported by:
FLOSERFIDA MACALINCAG
Signature Over Printed Name Date:
BREAD AND PASTRY PRODUCTION NC II Date Developed: Date Revised:
Document No. BPPNCII-01 Issued by:
Page of Developed by:
PURCHASE REQUEST
Division: PR No.: Date: Section: SAI No.: Date:Qty Unit Item Description Stock Estimated Estimated
No. Unit Cost Cost
10 sets Measuring spoons 50.00 500.00 PHP
10 pcs Flat sheet 100.00 1,000.00 PHP
10 pc s Cake tester 20.00 200.00 PHP
10 pcs Pastry bag 50.00 500.00PHP
10 sets Measuring cups 200.00
PHP 2,000.00
PHP 4,200.00 Purpose: :
To be used in Bread and Pastry Production NC II Training.
Requested By: Approved By:
FLOSERFIDA MACALINCAG
(put the name of your boss)
PURCHASE ORDER
Supplier: RIZAL EAST ENTERPRISES P.O. No.: Address: Date: TIN: Mode of Procurement: Gentle men:Please Furnish this office the following articles subject to term and conditions contained herein:
Place of Delivery: Term:Delivery Date of Delivery: Term:Payment
Item No. Qty. Unit Description Cost Unit Amount
1 10 sets Measuring spoons 50.00 500.00
2 10 pcs Flat sheet 100.00 1,000.00
3 10 pc s Cake tester
20.
00 200.00
4 10 pcs Pastry bag 50.00 500.00
5 10 sets Measuring cups 200.00 2,000.00
(Total Amount
in Words)
FOUR Thousand Two Hundred Pesos Only
PHP4,20 0.00
In case of failure to make full delivery within the time specified above, a penalty of one-tenth (1/10) of one percent for every day of delay shall be imposed.
Very truly yours,
Conforme: (name of supervisor)
Administrator (Signature over printed name)
(Date) Funds Available:
Amount: