• No results found

GA Based Heuristic to Minimize Makespan in Single Machine Scheduling Problem with Uniform Parallel Machines

N/A
N/A
Protected

Academic year: 2020

Share "GA Based Heuristic to Minimize Makespan in Single Machine Scheduling Problem with Uniform Parallel Machines"

Copied!
11
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 2. Processing times of jobs shown in chromosome 1.
Table 3. Representation of chromosomes using proportionate number of jobs allocation to machines
Table 4. Layout of problem generation.
Table 5. Results of ANOVA.

References

Related documents

Focusing on EU enlargement, the economic recession, and Brexit as a series of interlinked unsettling events and combining qualitative data from different studies

International Journal of Scientific Research in Computer Science, Engineering and Information Technology CSEIT1833619 | Received 01 April 2018 | Accepted 10 April 2018 | March April 2018

The single phase high pressure fluid at the outlet of slim-tube, the small pressure drop across it, and no methane bank in the composition of effluent gas indicate that

Maternal and umbilical cord blood samples collected at nine normal deliveries were an- alyzed for serum amylase activity (Table II). Values obtained in the specimens

Turfgrass (Including Turfgrass Grown for Seed or Sod) Apply Lontrel Turf and Ornamental in enough water to deliver 20 gallons or more of total spray mix per acre.. Higher

Non-invasive Ontario native plant species and drought tolerant plants thrive in local conditions; this means less water, easier care, fewer pests, and less reliance on

WOMEN'S INTERNATIONAL LEAGUE FOR PEACE AND FREEDOM LIGUE INTERNATIONALE DE FEMMES POUR LA PAIX ET LA LIBERTE WORLD ACADEMY OF ART AND SCIENCE. ACADEMIE MONDIALE DES ART ET

• This website includes a link to a CQI vs Research Form that is required to be filled out by the student and submitted directly to Dr.. Peter Iafrate at