• No results found

Pressure contact multi chip packaging of SiC Schottky diodes

N/A
N/A
Protected

Academic year: 2020

Share "Pressure contact multi chip packaging of SiC Schottky diodes"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1.  Schematic of the multi-chip SiC Schottky diode using pressure contacts,  where the different elements are identified
Fig. 2.  Picture of the evaluated multiple and single chip SiC Schottky diode modules using pressure contacts in different assembly stages
Fig. 7. (a) Impact of the clamping force on the forward voltage during a DC  pulse for a multi-chip module, (b) Forward voltage during a DC pulse for  single chip and multi-chip modules for an effective clamping force of 500 N
Fig. 13 (a) Current sharing between parallel chips for high clamping force  imbalance and load current below the ZTC (b) Impact of the clamping force imbalance on the forward voltage for a load current above the ZTC

References

Related documents

Finally, at the last stage, the request signal is sent out from the pipeline as Rout which can be used as the input control signal for the next module to send output data Dout

2g and Additional file 1: Figure S4D displays heteroge- neous but high levels of damage accumulation: like coding genes, there is reduced damage at promoters (average minimum

Definition: Once an IP link is established, and if no other TCP/IP stack resource is active, this command sent by the attached host directs the TCP/IP stack to initiate an UDP

Results: A total of 424 patients from six eligible studies that provided data about galectin-3 expression in PTC and non-PTC patients were included.. A total of 378 patients from

The objective is to study and compare different approaches of MPPT algorithms to evaluate the power extracted under the standard test conditions and varying

employment of a nuclear weapon in response - whether it be a high-altitude detonation over the perpetrators territory, a low-yield, tactical ground burst, or an air-burst

This is a minimum requirement and any CFD Generator in a CoP3 site or a Type 2, Type 3 Private Network site can install separate testing facilities for the main and check Meters

Apply for a new connection 1 7 Testing site equipment 2 Designing a new connection 6 Choose your electricity supplier 3 Order and payment 4 MPAN / supply number 5 DNO activities