• No results found

PRELIMINARY - NOT FOR CONSTRUCTION

N/A
N/A
Protected

Academic year: 2021

Share "PRELIMINARY - NOT FOR CONSTRUCTION"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

(1)

App’d Ch’k’d Description Drawn Date Rev Rev Status Drawing Number Title Client Security

Project Number B/O Total

Apex Clean Energy, Inc

310 4th St. NE, Suite 300

Charlottesville, VA 22902

Heritage Wind Farm

Switching

Station

General Arrangement

Scale at ARCH D

PRELIMINARY - NOT FOR CONSTRUCTION

HER-SS-0001

A

25'-0" 66'-6" 10'-0" 33'-0" 200'-0"

A

A

B

B

(2)

PRELIMINARY

NOT FOR

CONSTRUCTION

REPLACE WITH ENGINEERS STAMP AT CONSTRUCTION AND/OR FABRICATION App’d Ch’k’d Description Drawn Date Rev Date Drawing Number Scale at ANSI D Drawn Designed Title Client Checked Approved Rev

Apex Clean Energy, Inc

310 4th St. NE, Suite 200

Charlottesville, VA 22902

NOTES:

Heritage Wind Farm

Switching Station

Elevation A-A

HER-SS-002

A

PRELIMINARY - DO NOT USE FOR CONSTRUCTION

(3)

PRELIMINARY

NOT FOR

CONSTRUCTION

REPLACE WITH ENGINEERS STAMP AT CONSTRUCTION AND/OR FABRICATION App’d Ch’k’d Description Drawn Date Rev Date Drawing Number Scale at ANSI D Drawn Designed Title Client Checked Approved Rev

Apex Clean Energy, Inc

310 4th St. NE, Suite 200

Charlottesville, VA 22902

Heritage Wind Farm

Station

Switching

Elevation B-B

HER-SS-003

A

PRELIMINARY - DO NOT USE FOR CONSTRUCTION

(4)

5 3 1 6 4 2 5 3 1 6 4 2 5 3 1 6 4 2 5 3 1 6 4 2 5 3 1 6 4 2 5 3 1 6 4 2 5 3 1 6 4 2 5 3 1 6 4 2 5 3 1 6 4 2

-ROAD

-FENCE

-TRENCH (PEDESTRIAN)

-H20 TRENCH (VEHICLE)

-LIGHT LOCATION

-SHIELD WIRE

-EXPANSION RIGID BUS

CONNECTION

-FIXED RIGID BUS

CONNECTION

-SLIP RIGID BUS

CONNECTION

LEGEND

NOTES

1.

SUBSTATION LAYOUT, ARRANGEMENT, RATINGS AND

PHASING MAY VARY DEPENDING ON SPECIFIC SITE

REQUIREMENTS.

2.

REACTIVE COMPENSATION EQUIPMENT SHOWN ON

THIS DRAWING IS SUBJECT TO CHANGE BASED ON

REACTIVE POWER REQUIREMENTS DETERMINED BY

REACTIVE COMPENSATION STUDY.

3.

CONTROL ENCLOSURE SIZES ARE PRELIMINARY.

4.

EQUIPMENT IS PRELIMINARY PENDING VENDOR

SUBMITTALS.

5.

NORTH ARROW IS PRELIMINARY TO BE CONFIRMED

WITH SITE COORDINATES.

App’d Ch’k’d Description Drawn Date Rev Rev Status Drawing Number Scale at ARCH D Title Client Security

Project Number B/O Total

REPLACE THIS TEXT WITH

ENGINEER'S STAMP AT

CONSTRUCTION AND/OR

FABRICATION. ISSUE IF

REQUIRED BY PROJECT

ADMINISTRATION

MANUAL

Apex Clean Energy, Inc

310 4th St. NE, Suite

300

Charlottesville, VA 22902

Heritage Wind Farm

Collector Substation

General Arrangement

1/16" = 1'-0"

PRE

310'

150'

PRELIMINARY - NOT FOR CONSTRUCTION

15' 10' 10' 12' 15' 22' 22' 11' 20' 12' 16' 8' 4' 4' 15' 28' R50' 4' 4' 16 ' 55' 5' 30' 84' 8' 12' 8' 8' 12' 8' 12' 8' 8' 8' 8' 8' 50' 79' 47' 95' 101' 74' 27' 24' 20 ' 20 ' A 001 AØ BØ CØ AØ BØ CØ SST1

H-FRAME S.A.

SW1

CCVT1

52-T1

MPT

NGR SST1

SW-T1

VT1

52-F1

52-F2

52-F3

52-F4

52-F5

52-F6

52-F7

52-F8

52-C1

SW-C1 TO 115kV SWITCHYARD SW-CSW1 SW-CSW2 CSW-2 VT-CAP-2 CSW-1 VT-CAP-1 AØ BØ CØ

CAP-1

CAP-2

20'-0" DRIVE GATE 20'-0" DRIVE GATE

CONTROL ENCLOSURE AØ BØ CØ 24' 25' 49' 31' 12' 33' 75' 28' 49' 4' 4' 14' 14' 18'-6" 5' 5' 5' AØ BØ CØ S F EXP F S S S EXP F S 12' 12' 9' 9' B 002 C 003 D 004

HER-SUB-000

A

(5)

45'-0" 15'-0" 20'-0" 30'-0" H-FRAME 115KV, 1200A "V" DISC SWITCH OPGW

NUMBER AND POSITION OF LIGHTS WILL VARY. nVENT ERICO DYNASPHERE 18'-0" 10'-0" 10'-0" 2-795 AAC 8'-6" MATCHLINE CONTINUED ON DWG. 0021 SA H1 CABLE SPACER

TO FLAT PAD (TYP.)

8" CABLE SPACER TO FLAT 2-3500 AAC 795 AAC (N.S., FOR NEUTRAL) 2-3500 AAC MPT POWER XFMR 115/34.5KV 140/186/232 MVA 2-795 AAC 12'-0" 15'-0" 22'-0" 17'-0" 2-795 AAC 2-795 AAC 2-795 AAC 2-795 AAC 4'-0" 4'-0" F 3" IPS AL. SCH. 40 115 KV CCVT1 115 KV BREAKER 1200A- 52-T1 SURGE ARRESTERS 7'-0" FENCE 5'-0"

(Safety clearance to live parts NESC Table 110-1) 15'-0" 954 ACSR

PRELIMINARY

NOT FOR

CONSTRUCTION

REPLACE WITH ENGINEERS STAMP AT CONSTRUCTION AND/OR FABRICATION App’d Ch’k’d Description Drawn Date Rev Date Drawing Number Scale at ANSI D Drawn Designed Title Client Checked Approved Rev

Apex Clean Energy, Inc

310 4th St. NE, Suite 200

Charlottesville, VA 22902

1. ALL STEEL STRUCTURE DIMENSIONS AND BUS HEIGHTS ARE FROM

TOP OF CONCRETE.

2. ALL OPEN TUBE ENDS TO BE CAPPED.

3. 3" IPS AL BUS TO BE BE SCHEDULE 40.

5" IPS AL BUS TO BE SCHEDULE 40 OR SCHEDULE 80 AS NOTED ON DRAWINGS.

4. CONTRACTOR TO TERMINATE THE SECONDARY STATION SERVICE

CONDUCTORS WITH A SOLID, PIN TYPE TERMINAL TO PREVENT WATER INTRUSION THROUGH THE CONDUCTOR JACKETING INTO THE FUSED DISCONNECT BOX.

TO BE COORDINATED

WITH UTILITY

Heritage Wind Farm

Collector Substation

Elevation A-A

HER-SUB-001

A

PRELIMINARY - DO NOT USE FOR CONSTRUCTION

115KV DISC SWITCH

MATCHLINE CONTINUED ON DWG.

HER-SUB-002

(6)

11'-0" 4'-0"

22'-0"

ELEVATION B-B

34.5KV SW. 4000A - SW-T1

GROUNDING REACTOR NOT SHOWN FOR CLARITY SEE SECT. C-C ON DWG. 0024

S SPEEDSLOWTCC119-2 15E TBD A FUSED DISC. SST1 TBD KVA SEE NOTE 6 #2 AAC (ONLY Aɸ) #2 AAC 6 4 2 6 4 2 2 4 6 34.5KV SW. 1200A - SW-C1 15'-0" 8'-0" 12'-0" 8'-0" 34.5KV FDR. BRKR 1200A - 52-F1 34.5KV FDR. BRKR 1200A - 52-F2 28'-0" 12'-0" 8'-0" 34.5KV FDR. BRKR 1200A - 52-F3 8'-0" 3'-6" SPEEDSLOWTCC119-2 15E 10'-0" VT1 JCT BOX VT1 VT-FUSED CUTOUTS #2 AAC #2 AAC 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" S S F R1'-3" 2-3500 AAC SW-F1-2 795 AAC (TYP.) SW-F2-2 795 AAC (TYP.) SW-F3-2 795 AAC (TYP.) VT1 25'-8" MATCHLINE CONTINUED ON DWG. HER-SUB-001 AØ BØ CØ CØ BØ AØ CØ BØ AØ 5" IPS AL, SCH. 80 5" IPS AL, SCH. 80 28'-0" 18'-0" 4'-0" 3'-8" 25'-8" 15'-0" R1'-3" R1'-3" 8'-0" SA H1 CABLE SPACER

TO FLAT PAD (TYP.)

8" CABLE SPACER TO FLAT 2-3500 AAC 8" CABLE SPACER (TYP. AS NEEDED) 795 AAC (N.S., FOR NEUTRAL) 2-3500 AAC MPT POWER XFMR 115/34.5KV 140/186/232 MVA 2-795 AAC R1'-3" F FOR X0 6 4 2 34.5KV FDR. BRKR 1200A - 52-F4 SW-F4-2 795 AAC (TYP.) BØ AØ CØ 8'-0" R1'-3"

HER-SUB-002

A

NOTES:

PRELIMINARY - DO NOT USE FOR CONSTRUCTION

1. ALL STEEL STRUCTURE DIMENSIONS AND BUS HEIGHTS ARE FROM

TOP OF CONCRETE.

2. FOR TOP OF CONCRETE ELEVATIONS SEE FOUNDATION PLAN

3. SEE GENERAL ARRANGEMENT DWG. 0010 NOTE 2.

4. ALL OPEN TUBE ENDS TO BE CAPPED.

5. 3" IPS AL BUS TO BE BE SCHEDULE 40.

5" IPS AL BUS TO BE SCHEDULE 40 OR SCHEDULE 80 AS NOTED ON DRAWINGS.

6. CONTRACTOR TO TERMINATE THE SECONDARY STATION SERVICE

CONDUCTORS WITH A SOLID, PIN TYPE TERMINAL TO PREVENT WATER INTRUSION THROUGH THE CONDUCTOR JACKETING INTO THE FUSED DISCONNECT BOX.

PRELIMINARY

NOT FOR

CONSTRUCTION

REPLACE WITH ENGINEERS STAMP AT CONSTRUCTION AND/OR FABRICATION App’d Ch’k’d Description Drawn Date Rev Date Drawing Number Scale at ANSI D Drawn Designed Title Client Checked Approved Rev

Heritage Wind Farm

Collecto

r Substation

Elevation B-B

Apex Clean Energy, Inc

310 4th St. NE, Suite 200

Charlottesville, VA 22902

(7)

20'-0" 5" IPS AL., SCH. 40 4'-0" 4'-0" 6'-0" 6'-0" 6'-0" 4'-0" 4'-0" 6'-0" 2'-6" 20'-0" 15'-0"

ELEVATION C-C

10'-0" 10'-0" 10'-0" 10'-0" FENCE AØ BØ CØ CØ BØ AØ

3" IPS AL (TYP.) 3" IPS AL (TYP.)

NOTE 2 (TYP.) 795 AAC (TYP.) 795 AAC (TYP.) F S S TOP OF SW PAD

OF BUS 7'-0" 5'-0" 1' 22'-0" 37'-0"

(Safety clearance to live parts NESC Table 110-1)

1. ALL STEEL STRUCTURE DIMENSIONS AND BUS HEIGHTS ARE FROM

TOP OF CONCRETE.

2. FOR TOP OF CONCRETE ELEVATIONS SEE FOUNDATION PLAN

3. SEE GENERAL ARRANGEMENT DWG. 0010 NOTE 2.

4. ALL OPEN TUBE ENDS TO BE CAPPED.

5. 3" IPS AL BUS TO BE BE SCHEDULE 40.

5" IPS AL BUS TO BE SCHEDULE 40 OR SCHEDULE 80 AS NOTED ON DRAWINGS.

PRELIMINARY

NOT FOR

CONSTRUCTION

REPLACE WITH ENGINEERS STAMP AT CONSTRUCTION AND/OR FABRICATION App’d Ch’k’d Description Drawn Date Rev Date Drawing Number Scale at ANSI D Drawn Designed Title Client Checked Approved Rev

Apex Clean Energy, Inc

310 4th St. NE, Suite 200

Charlottesville, VA 22902

Heritage Wind Farm

Collector Substation

Elevation C-C

HER-SUB-003

A

PRELIMINARY - DO NOT USE FOR CONSTRUCTION

(8)

R1'-3" 9'-0" 22'-0" 4'-0" 4'-0" 8'-0" 15'-0" 34.5KV, 1200A SW-CSW2 CØ BØ AØ

ELEVATION D-D

3" IPS AL EXP (N.S.) 23 26 TYP. 795 AAC (TYP.) GROUND STUD OPERATOR PLATFORM H2 H1 T.B.D. T.B.D. CAP2 VT-CAP CSW2 2 SA GND. SW VT-CAP2 25 24 4'-0" T.B.D. 795 AAC OPERATOR PLATFORM 31 TYP.

1. ALL STEEL STRUCTURE DIMENSIONS AND BUS HEIGHTS ARE FROM

TOP OF CONCRETE.

2. FOR TOP OF CONCRETE ELEVATIONS SEE FOUNDATION PLAN

3. SEE GENERAL ARRANGEMENT DWG. 0010 NOTE 2.

4. ALL OPEN TUBE ENDS TO BE CAPPED.

5. 3" IPS AL BUS TO BE BE SCHEDULE 40.

5" IPS AL BUS TO BE SCHEDULE 40 OR SCHEDULE 80 AS NOTED ON DRAWINGS.

NOTES:

PRELIMINARY - NOT FOR CONSTRUCTION

HER-SUB-004

A

REACTIVE COMPENSATION SIZING IS PRELIMINARY. ACTUAL SIZING MAY CHANGE AFTER FINAL MODELING IS COMPLETE.

NOTE:

PRELIMINARY

NOT FOR

CONSTRUCTION

REPLACE WITH ENGINEERS STAMP AT CONSTRUCTION AND/OR FABRICATION App’d Ch’k’d Description Drawn Date Rev Date Drawing Number Scale at ANSI D Drawn Designed Title Client Checked Approved Rev

Heritage Wind Farm

Collector Substation

Elevation D-D

Apex Clean Energy, Inc

310 4th St. NE, Suite 200

Charlottesville, VA 22902

3" IPS AL CONTINUES

T0

(9)

10'-0"

10'-0" (MAX SPACING) 10'-0" (MAX SPACING) 10'-0"

3'-0" 3'-3"

1'-0" 9"

3'-6"

TYPICAL FENCE FABRIC DETAIL

TYPICAL FENCE CORNER DETAIL

3'-0" 3'-3"

TYPICAL FENCE TENSION SECTION DETAIL

3'-3" 3'-0" 1'-0" 9" 9" 9" 9" 3" 2" 3" X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX XX XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X ίMANTENERSE FUERA! ESTA SUBESTACION UTILIZA CABLES DE ACERO RECUBIERTO PARA SU SISTEMA DE TIERRAS. ESTA MATERIAL NO TIENE VALOR DE REVENTA. KEEP OUT! THIS SUBSTATION'S GROUNDING SYSTEM UTILIZES COPPER-CLAD STEEL HARDWARE. THIS MATERIAL HAS NO SCRAP VALUE.

THEFT DETERRENT SIGN

SCALE: N.T.S. 3'-2"

1'-10"

3"

TYPICAL WARNING SIGN

1'-2"

10"

SCALE: N.T.S.

2 3/8" O.D. LINE POST (TYP.)

45° EXTENSION ARM (TYP.) 3 STRANDS BARBED WIRE SEE NOTE 1

1 5/8" TOP RAIL

TENSION BAND (TYP.) 3 STRANDS BARBED WIRE SEE NOTE 1 45° EXTENSION ARM 2 3/8" O.D. LINE POST 45° EXTENSION ARM 2 3/8" O.D. LINE POST

TENSION BAND (TYP.) 3 STRANDS

BARBED WIRE

SEE NOTE 1 1 5/8" TOP RAIL

45° EXTENSION ARM 2 3/8" O.D. LINE POST

SEE SIGN NOTE 4

WHITE BACKGROUND WITH BLACK TEXT NOTE 5

RED BACKGROUND WITH WHITE TEXT

WHITE BACKGROUND WITH BLACK TEXT

2 7/8" TERMINAL POST TENSION BAR (3/16"x3/4") TENSION BAR CLAMPS, 14" MAX. SPACING 3/8" DIA. DIAGONAL TENSION ROD WITH TURNBUCKLE (TYP.) 1 5/8" BOTTOM RAIL

1 5/8" BOTTOM RAIL 3/8" DIA. DIAGONAL TENSION ROD WITH TURNBUCKLE

2" 2"

BOLLARD

TOP VIEW

TYPICAL 20' DRIVE SLIDE GATE DETAIL

SCALE: N.T.S. SNAKE FENCE

NOT SHOWN FOR CLARITY

GATE POST GATE POST LATCH POST

INSIDE OUTSIDE 90° BARBWIRE ARM 4" POST GATE POST INLINE WITH FENCE LINE ROLLER AND ROLLER GUARD ROLLER AND ROLLER GUARD

SIDE VIEW

TYPICAL 20' DRIVE

CANTILEVER

SLIDE GATE DETAIL

7'-0"

3'-0" 3'-3"

1'-2"

TYPICAL 4' WALK GATE DETAIL

3'-6" 2" 1'-2" 3" X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X ίMANTENERSE FUERA! ESTA SUBESTACION UTILIZA CABLES DE ACERO RECUBIERTO PARA SU SISTEMA DE TIERRAS. ESTA MATERIAL NO TIENE VALOR DE REVENTA. KEEP OUT! THIS SUBSTATION'S GROUNDING SYSTEM UTILIZES COPPER-CLAD STEEL HARDWARE. THIS MATERIAL HAS NO SCRAP VALUE.

4" GATE POST

TENSION BAND (TYP.) 3 STRANDS BARBED WIRE SEE NOTE 1

3/8" DIA. DIAGONAL TENSION ROD WITH TURNBUCKLE (TYP.) 4" GATE POST 2" GATE FRAME (2 SIDES) 2 7/8" CORNER POST SCALE: 3/8" = 1'-0"

SCALE: N.T.S. SCALE: 3/8" = 1'-0" SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0" 1 5/8" TOP RAIL X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 3'-0" 3'-3" 3" 3'-0" 3'-3" 3" 3 STRANDS BARBED WIRE SEE NOTE 1 4" GATE POST (N.S.) 7'-0" 5'-0" (TYP.) ίMANTENERSE FUERA! ESTA SUBESTACION UTILIZA CABLES DE ACERO RECUBIERTO PARA SU SISTEMA DE TIERRAS. ESTA MATERIAL NO TIENE VALOR DE REVENTA. KEEP OUT! THIS SUBSTATION'S GROUNDING SYSTEM UTILIZES COPPER-CLAD STEEL HARDWARE. THIS MATERIAL HAS NO SCRAP VALUE. 6" 12'-0" LATCH 4" GATE POST 2 1/2" BOTTOM RAIL 2 1/2" TOP RAIL 2" 4" GATE POST (N.S.) 1 5/8" BOTTOM RAIL OVERHANG 90 DEG. EXTENSION ARM (TYP.) POST BRACE

TYPICAL 20' DRIVE CANTILEVER SLIDE GATE DETAIL

SCALE: 3/8" = 1'-0" 1 5/8" O.D. DIAGONAL (TYP.) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX XX XX XX XX

GATE BARBWIRE ENDS ON 90 DEG. EXTENSION ARM

3'-0" 3'-3" 3" 1'-2" 2" ROLLER COVER (TYP.) GATE OPENS X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 2"

FENCE FABRIC THIS SECTION OF GATE NO FENCE FABRIC THIS SECTION OF GATE

20'-0" CLEAR OPENING INNER SIDE TO INNER SIDE

1 5/8" BOTTOM RAIL POST BRACE 1 5/8" TOP RAIL 6'-0" 1'-2" 1'-2" 6'-0" TOP OF CRUSHED ROCK 1 5/8" BOTTOM RAIL 7'-0" 1'-0" ίMANTENERSE FUERA! ESTA SUBESTACION UTILIZA CABLES DE ACERO RECUBIERTO PARA SU SISTEMA DE TIERRAS. ESTA MATERIAL NO TIENE VALOR DE REVENTA. KEEP OUT! THIS SUBSTATION'S GROUNDING SYSTEM UTILIZES COPPER-CLAD STEEL HARDWARE. THIS MATERIAL HAS NO SCRAP VALUE. 3'-2"x1'-10" PLACED EVERY 75'-0" 10"x14" PLACED EVERY 75'-0"

1 1/4" POST BRACE 1 1/4" POST BRACE

SNAKE FENCE NOT SHOWN FOR CLARITY

FORKED TYPE LATCH HAVING PADLOCK LOCKING CAPABILITY FROM EITHER SIDE OF GATE. FENCE GATE HINGE

1 1/4" POST BRACE

SNAKE FENCE NOT SHOWN FOR CLARITY

1'-0" 3" 3'-6" 1'-0" 6'-0" WIDE CONCRETE APRON TOP OF CRUSHED ROCK 10'-0"

ROLLER COVER (TYP.)

App’d Ch’k’d Description Drawn Date Rev Date Drawing Number Scale at ANSI D Drawn Designed Title Client Checked Approved Rev

1. EXTENSION ARMS WITH 3 STRANDS BARBED WIRE 12-1/2 GAUGE

GALVANIZED TWISTED DOUBLE STRAND, 4 POINT ROUND BARBS SPACED AT 5" O.C. EACH ARM.

2. CROWN CONCRETE AROUND ALL POSTS, T.O.C. SHALL BE APPROXIMATELY

1" ABOVE AGGREGATE SURFACING.

3. FENCE FABRIC - 9 GAUGE, 2" MESH.

4. INSTALL CAPS ON ALL GATE, CORNER AND PULL POSTS.

5. ALL PIPE SIZES ARE O.D. AS REFERENCED IN FENCE SPECS U.N.O.

GENERAL NOTES:

1. SIGNS SHALL COMPLY WITH ANSI Z535.1-Z535.5 (LATEST REVISION).

2. THE SYMBOL/PICTORIAL PANEL SHALL BE SQUARE WITH A BLACK SYMBOL

OF A BODY WITH WIRE AND LIGHTNING BOLT ON A WHITE BACKGROUND.

3. SIGNS SHALL BE MANUFACTURED FROM AN 80 MIL ALUMINUM SHEET,

TYPE 3003 H-14 COATED FRONT AND BACK WITH AN ACRYLIC ENAMEL. ALL SHARP EDGES AND BURRS SHALL BE REMOVED. THE SIGNS SHALL HAVE A THICKNESS OF 0.080". THE MOUNTING HOLES SHALL BE PROTECTED BY BRASS FERRULES.

4. THE SIGNAL WORDS "NOTICE" AND "AVISO" SHALL BE WHITE LETTERS ON

A RECTANGULAR ANSI SAFETY BLUE BACKGROUND.

SIGN NOTES:

Heritage Wind

Collector Substation

Fence Details

HER-SUB-005

ISSUED FOR CONSTRUCTION

Apex Clean Energy, Inc

310 4th St. NE, Suite 200

Charlottesville, VA 22902

A

PRELIMINARY

NOT FOR

CONSTRUCTION

REPLACE WITH ENGINEERS STAMP AT CONSTRUCTION AND/OR FABRICATION

(10)

App’d Ch’k’d Description Drawn Date Rev Date Drawing Number Scale at ANSI D Drawn Designed Title Client Checked Approved Rev

HER-SUB-006

ISSUED FOR CONSTRUCTION

Heritage Wind Farm

Collector Substation

Control Building

Details

Apex Clean Energy, Inc

310 4th St. NE, Suite 200

Charlottesville, VA 22902

PRELIMINARY

NOT FOR

CONSTRUCTION

REPLACE WITH ENGINEERS STAMP AT CONSTRUCTION AND/OR FABRICATION

A

(11)

FINISHED GRADE

H-FRAME LIGHTS

CONDUIT DETAILS

(LOOKING NORTH)

SCALE: N.T.S. TO TRENCH 4'-0" (TYP.) 30'-0" (N.T.S.) (MAY VARY) 12" 18" MAX / 12" MN 12"

MOUNTING HT. (MAY VARY)

1'-0"

ELEVATION

LIGHT FIXTURE WITH

PHOTOCELL MOUNTING (TYP.)

ACTUAL NUMBER OF LIGHTS VARIES

SCALE: N.T.S.

PLAN (TYPICAL)

ACTUAL NUMBER OF LIGHTS VARY

SCALE: N.T.S.

VARIES

DIRECT EMBED

AREA LIGHT POLE CONDUIT DETAIL

SCALE: N.T.S. FINISHED GRADE

4'-0"

TO TRENCH POLE TOP BRACKET FOR

LIGHTS WILL VARY FROM 2 TO 4 LIGHTS

LIGHT POLE, PIPE 8" XPS (SCH 80)

2" RGS 90 DEG. ELBOW, 24" RADIUS 2" PVC TO RGS COUPLING

2" PVC CONDUIT

1" LIQUIDTIGHT STRAIGHT CONNECTOR 2" TO 1" PVC REDUCER

2" PVC FEMALE ADAPTER 2" RGS TO PVC COUPLING 1" LIQUIDTIGHT FLEX CONDUIT

1" LIQUIDTIGHT STRAIGHT FLEX CONNECTOR SEE LP SWITCH NOTE ABOVE

THREADED NIPPLE FOR LIGHT SWITCH CONDUIT TYPICAL LIGHT FIXTURE WITH PHOTOCELL

1'-0" 1'-0"

LIGHT FIXTURE WITH PHOTOCELL

CABLE FROM BELOW

LIGHTING HANDHOLE YARD LIGHTING ARM BY STEEL VENDOR LIGHT FIXTURE WITH PHOTOCELL

SLIP FITTER KNUCKLE

H-FRAME /

LIGHTNING MAST LEG

KELLEMS GRIP CABLE SPLICE 3 PER

CONNECTION

SEE 1010-YARD LIGHTING PLAN

(2) 1" LIQUIDTIGHT STRAIGHT FLEX CONNECTOR (2) 2" TO 1" PVC REDUCER

(2) 2" PVC FEMALE ADAPTER (2) 2" RGS TO PVC COUPLING (2) 1" LIQUIDTIGHT FLEX CONDUIT

(2) 1" LIQUIDTIGHT STRAIGHT FLEX CONNECTOR SINGLE SW. BOX

SINGLE HUB

THREADED NIPPLE FOR LIGHT SWITCH CONDUIT

HANDHOLE AND COVER

2" PVC TO RGS COUPLING HANDHOLE

AND COVER THREADED NIPPLE FOR LIGHT SWITCH CONDUIT

DYNASPHERE SINGLE GANG SW. BOX DOUBLE HUB 2" RGS 90 DEG. ELBOW, 24" RADIUS 2" PVC CONDUIT 18" MAX / 12" MN

NUMBER OF LIGHTS MAY VARY

30'-0" (MAY VARY)

SEE 1010-YARD LIGHTING PLAN

45

'-0"

TYPICAL DIRECT EMBED LIGHTNING MAST

LIGHTS CONDUIT DETAILS

SCALE: N.T.S. 1'-0" 2'-10" 3'-10" 18'-0" TO TRENCH HAND HOLE & COVER THREADED NIPPLE FOR LIGHT SWITCH CONDUIT SEE LM SWITCH NOTE ABOVE

1" LIQUIDTIGHT STRAIGHT FLEX CONNECTOR

1" LIQUIDTIGHT FLEX CONDUIT

1" LIQUIDTIGHT STRAIGHT CONNECTOR 2" TO 1" PVC REDUCER 2" PVC FEMALE ADAPTER 2" RGS TO PVC COUPLING 2" PVC CONDUIT 2" PVC TO RGS COUPLING 2" RGS 90 DEG. ELBOW, 24" RADIUS NUMBER OF LIGHTS MAY VARY nVENT ERICO DYNASPHERE

PRELIMINARY

NOT FOR

CONSTRUCTION

REPLACE WITH ENGINEERS STAMP AT CONSTRUCTION AND/OR FABRICATION App’d Ch’k’d Description Drawn Date Rev Date Drawing Number Scale at ANSI D Drawn Designed Title Client Checked Approved Rev

Apex Clean Energy, Inc

310 4th St. NE, Suite 200

Charlottesville, VA 22902

Heritage Wind Farm

Collector Substation

Lightening Mast Details

HER-SUB-007

A

PRELIMINARY - NOT FOR CONSTRUCTION

(12)

CONTROL ENCLOSURE GENERAL LAYOUT

S

2'-0" 3'-8"

S

5'-3" 49'-9" 55'-0" 16'-0" 41'-9" 16'-0" 3'-9" 4'-8" 3'-0" 4'-7" 10'-9" 5'-3" 6'-0" 2'-0" 27'-6" 5'-1" 5'-3" 6'-6"

S

S

S

7'-0"

HER-SUB-008

A

1. MANUFACTURER AND MODEL LISTED IS SUGGESTED AND MAY BE SUBSTITUTED WITH A PRODUCT OF EQUAL QUALITY AND MATERIAL. (THIS ONLY APPLIES TO ITEMS REFERENCING THIS NOTE.)

2. CABLE TRAY IS SET AT 8'-6" FROM FLOOR TO BOTTOM OF TRAY. 3. ALL CABLES TRAYS TO BE SET AT THE SAME HEIGHT.

4. VENDOR MAY USE MANUFACTURER AND MODEL THAT MEETS DESCRIPTION AND/OR SPECIFICATIONS.

5. VENDOR TO DETERMINE EXACT EQUIPMENT LAYOUT AND SUBMIT DETAIL LAYOUT FOR APPROVAL.

6. EQUIPMENT SHOWN SHALL BE PROVIDED AND INSTALLED BY OTHERS. INSTALLATION OF THIS EQUIPMENT WILL BE ACCOMPLISHED AFTER CONTROL HOUSE IS DELIVERED AND INSTALLED AT OWNER'S SUBSTATION.

7. VENDOR TO DETERMINE CORRECT SIZE (AIR HANDLING TONNAGE AND

HEATING CAPACITY) FOR GEOGRAPHIC LOCATION OF SUBSTATION AND SUPPLY APPROPRIATE UNITS.

8. 4"x4" WIREWAY TO BE INSTALLED AROUND ENTIRE ROOM PERIMETER (BOTH ROOMS) IN CORNER OF CEILING AND WALLS. WALL MOUNTED EQUIPMENT

(SWITCHES, RECEPTACLES, ETC) TO USE THIS WIREWAY AS MUCH AS POSSIBLE.

FOR CLARITY, WIREWAY NOT SHOWN ON DRAWING.

9. VENDOR TO WIRE ALL AVAILABLE BUILDING ALARMS TO ALARM CABINET. AT A MINIMUM THESE ARE: 2x HVAC TROUBLE, 2x INTRUSION, 2x BLDG HI/LO TEMP, 2x SMOKE DETECTOR AND 2x HYDROGEN DETECTION. VENDOR TO RUN SPARE EMPTY 1.5" CONDUIT TO WIREWAY FOR CUSTOMER USE.

10. SITE PERSONNEL TO RUN GENERATOR AND STATION SERVICE POWER CABLES TOGETHER AND PARTITIONED/SEPARATED FROM OTHER CABLES IN CABLE TRAY.

11. SATELLITE CLOCK / CELL PHONE ANTENNA LOCATION SHALL BE LOW AND

CLOSE TO CONTROL HOUSE ROOF ABOVE MAXIMUM SNOW ACCUMULATION AND

AWAY FROM MAINTENANCE ACTIVITIES. ANTENNA, CABLE AND SURGE ARRESTOR MOUNTING WILL BE COMPLETED BY ONSITE PERSONNEL.

12. VENDOR TO VERIFY SIZE FOR AIRFLOW REQUIRED FOR OPERATION OF BOTH EXHAUST FANS AT ONCE.

NOTES

No.

DESCRIPTION

MFG.

CAT #

QTY

S

CONTROL ENCLOSURE EQUIPMENT SCHEDULE

NOTES

No.

DESCRIPTION

MFG.

CAT #

QTY

CONTROL ENCLOSURE EQUIPMENT SCHEDULE

NOTES

SYMB

DESCRIPTION

MFG.

CAT #

QTY

ELECTRICAL SYMBOL LEGEND

PRELIMINARY

NOT FOR

CONSTRUCTION

REPLACE WITH ENGINEERS STAMP AT CONSTRUCTION AND/OR FABRICATION App’d Ch’k’d Description Drawn Date Rev Date Drawing Number Scale at ANSI D Drawn Designed Title Client Checked Approved Rev

Heritage Wind Farm

Collector Substation

Control Building Layout

Apex Clean Energy, Inc

310 4th St. NE, Suite 200

Charlottesville, VA 22902

References

Related documents

We used the evaluation framework of reference de- signed for subspace clustering described in [13] that reports the results obtained by well-established approaches for

Overall, this advantage for girls at girls’ schools, about 10% of a standard deviation, has to be seen against an 11% disadvantage as far as attendance at boys’ schools was

To determine the minimum cover for durability (and also the strength class and minimum water cement ratio) either the UK National Annex or BS 8500 can be used.. The various

I feel like a lot of the stuff is stuff that will teach them like um just how to care for themselves and how to just like a lot of special needs education is centered around

Gippsland Southern Health Service Medical Education Officer Omeo District Health Chief Executive Officer Orbost Regional Health Chief Executive Officer Yarram and District

L & W 11mth old, lovely feminine bitch which has changed dramatically since I last saw her, her head is ultra feminine if a little finer than 1, lovely correct shape eye and

A0 Not Not enough enough language language knowledge knowledge demonstrated demonstrated to to allow f allow for any or any meaningful meaningful inferences inferences

Figure 5: Predicted offer distribution in the ultimatum game using the model with sub- jective expectations (dark bars), predicted offer distribution setting subjective