• No results found

Adolescent Sexual Aggression: Risk and Protective Factors

N/A
N/A
Protected

Academic year: 2020

Share "Adolescent Sexual Aggression: Risk and Protective Factors"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

TABLE 1.Percentages of Male Youth Reporting Perpetrationof Sexual Violence by Environmental and Personal Characteristics
TABLE 4.Differences in Emotional and Behavioral Charac-teristics Between Female Youth Who Have and Have Not Re-ported Perpetration of Sexual Violence*
TABLE 5.Odds Ratios and Confidence Intervals for Perpetration of Sexual Violence Among Male Youth
TABLE 6.Odds Ratios and Confidence Intervals for Perpetration of Sexual Violence Among Female Youth

References

Related documents

We have examined the attached restated standalone summary financial information of Thyrocare Technologies Limited (“the Company”) as approved by the Board of Directors

You should read the following discussion of our financial condition and results of operations together with the financial statements of HOV Services Limited (“HOVS”) for the

MANUAL CONTROLS | BATTERY OPTIONS | BUILT FOR PORTABILITY DMX 512 EQUIPPED | BUILT FOR PRO GRADE STUDIO INSTALLATIONS.. STUDIO

Your daily log of observations will be the best means for sharing the data and information col- lected during the experiment. Charts and graphs will provide a fine way to share data

In the main book we mentioned how just visiting a site with malicious code could result in unwanted programs installing on your machine (especially if your computer is not

Through exploring the experiences of employees who self- identify with having witnessed bullying in the workplace, this transcendental phenomenological study was guided by

Having reduced the bilateral debt stock and rescheduled outstanding loans (with a commitment to seek comparable terms from non-Paris creditors) the issue of multilateral debt was

One significant challenge when applying PDB heuristics to planning, as opposed to classical search problems, is that PDB construction time must be amortized within a single planner