• No results found

The factors of deterioration in long-term clinical course of lumbar spinal canal stenosis after successful conservative treatment

N/A
N/A
Protected

Academic year: 2020

Share "The factors of deterioration in long-term clinical course of lumbar spinal canal stenosis after successful conservative treatment"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1 Long-term results of conservative treatment for LSS in this study. The probability of symptom preservation after the successful conservativetreatment of LSS remained at 68.3% 5 years post-discharge and 57.2% 7 years post-discharge
Table 2 Five-year preservation probability and median preservation expectancy
Table 3 Logistic regression analysis of prognostic factors

References

Related documents

15) Repeat Arc command. Specify Start point of arc or [Center]: Choose the From object snap. Base point: Pick the center of the leftmost circle. Specify second point of arc

A tool that provides a support to the test management, used by the specialist testers or test managers at system or acceptance

Digital Signature Certificates (DSC) are being issued on verification of the identity and address of the applicant under the Information Technology Act. These guidelines are

Lack of cartilage rings induce altered tracheal epithelium differentiation (increased Clara cells, and decreased basal and goblet cells) and defective development of

The FDA ( 2 ) defines IVIVC as “a predic- tive mathematical model describing the relationship between an in vitro property of an extended release dosage form (usually the rate or

this study are the feedforward backpropagation neural networks ( FFBP ) and the FFBP hybridized with genetic algorithm ( FFBP + GA ), in comparison with values obtained using

The higher sustained data transfer rates in kernel 2.6 was attributed to it’s more efficient “copy” routines while the much higher number of simultaneous connections in kernel 2.6 was

Fulton Center opened to commuters in November 2014, and plans for its 65,000 square feet of commercial space are underway with a targeted opening in spring/summer 2015..