ALARM SOLUTION AT BTS SITE

Created by: N00717083

Outsource department TSD

(2)

CONTENT

Alarm system checking at BTS

Frequent mistake of installation

(3)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 3

Alarm system checking at BTS

Safety reason

Shall not wear any gold, silver, watch, ring or any jewelry

during the testing process

Make sure all of the testing step shall not be make any

interruption of BTS, or affect to the BTS system

Shall not put any iron or conductive material on or near the

equipment as BTS and power system, this may cause some

dangerous damage to the system and interrupt of

communication

Take a insulated glover and pay high attention when working

(4)

Alarm system checking at BTS

Tools requirements

Multi-meter

(is a must)

LED

(is a must)

Krone knife

(is a must)

Knife

(is a must)

Minus and star screwdriver

(is a must)

Camera

(optional)

(5)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 5

Alarm system checking at BTS

General checking

General checking the status of electrical part as following:

AC main

DC power

Air conditioning

OBlight

ACU Controller

SPD (Arrester)

CB position, etc

(6)

Alarm system checking at BTS

General checking (Continue)

Fast reading the drawing of alarm wiring system

DDF Fire sensor siren

1

8 6 4 2 5 9 1 3 7 10 Rectifier

2 3 4

6 7 8 9

ACU

&

EMU

Ventilation Aircon1 Aircon2

BTS

(7)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 7

(8)

Alarm system checking at BTS

General checking (Cont)

Checking color code of cable on DDF

Row 1: Make sure cable run in right way to equipment

– Check color code on row 1

(9)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 9

Alarm system checking at BTS

Checking color code of cable on DDF (Cont)

Row 2:

– Color code shall be same picture as follow

(10)

Alarm system checking at BTS

Checking the label of UTP cable

(11)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 11

Alarm system checking at BTS

Checking the label of UTP cable (Cont)

On BTS (Alarm port)

– If any difference, check the port again and reconnect or re-label if

need

(12)

Alarm system checking at BTS

Testing alarm

Clear all alarm

Check alarm signal at all of 10 pins on DDF

Using Multi-meter (Recommend): Two pole of each pin shall close,

sound can be heart

(13)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 13

Alarm system checking at BTS

Testing alarm (Cont)

Make sure all of testing will not affect to the BTS system before

testing

Test alarm one by one from No.1 to No.10, refer table below for

(14)

Alarm system checking at BTS

Testing alarm (Cont)

Door Alarm High temp 1 Control fail A High temp 2 Fire Alarm Oblight Alarm Common Alarm Module Alarm Low Bat Alarm Main Alarm Open the door Set “high tem 1” Switch it’s power Set “high tem 2” Smoke Switch off Oblight Simulate PS alarm Pull out rectifier Set “low bat 2” Switch Off AC Pull out cable Pull out cable Pull out cable Pull out cable Test relay 6 Test relay 5 Test relay 3 Test relay 1

10

9

8

7

6

5

4

3

2

1

(15)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 15

Alarm system checking at BTS

Testing alarm (Cont)

With each alarm, check pins is open or short circuit status, should

do a record as below from pin 1 to pin 10 (Grey highlight is the hint

about the right operation of testing)

Alarm

OFF

ON

LED

(NO only)

Open

Short-circuit

Multi-meter

Normal

Pin No.#

(16)

Alarm system checking at BTS

Testing alarm (Cont)

1. Main alarm:

Make sure Battery can supply power for BTS

Switch off AC main CB

Switch off CB

will simulate

(17)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 17

Alarm system checking at BTS

Testing alarm (Cont)

2. Low bat alarm:

Go to service option/ Relay test/ Relay No.# and test relay 3

3. Module alarm:

(18)

Alarm system checking at BTS

4. Common alarm:

This alarm shall be happen if any mistake of PS system

Also can test relay 6 to simulate this in other way

Switch off this

CB will

simulate alarm

(19)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 19

Alarm system checking at BTS

5. Oblight alarm

Switch off Oblight switch

(20)

Alarm system checking at BTS

6. Fire alarm

Smoke

Or pull out cable from ACU

Smoke will

simulate alarm

(21)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 21

Alarm system checking at BTS

7. High temp 2 alarm

Set “High temp 2” lower than current temp

Or pull out cable from ACU & EMU

(22)
(23)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 23

Alarm system checking at BTS

8. Control fail alarm

Switch off switch on ACU & EMU

If there is no power switch, should turn off the power switch of air

condition in Auto mode

Switch

off will

simulate

the alarm

Turning off to

simulate the

alarm

(24)

Alarm system checking at BTS

9. High temp 1

Set “High temp 1” lower than current temp

Or pull out cable from ACU & EMU

(25)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 25

Alarm system checking at BTS

10. Door larm

Open the door will simulate the alarm

Closing the door will clear the alarm

(26)

Frequent mistake of installation

Failure hardware as

ACU & EMU: Too many

Eltek alarm card out put: Some

Oblight alarm out put: Some

Wrong connection:

From UTP cable to DDF: Too many => Follow Huawei’ standard is a

must

Wrong UTP port position, wrong label

=>

IF ANY DIFFERENCE FROM HUAWEI’S STANDARD, NEED

TO REINSTALL FOR THE RIGHT OPERATION

(27)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 27

THANK YOU

HUAWEI TECHNOLOGIES CO., LTD

NGUYEN XUAN QUANG: N00717083

EMAIL: [email protected]

MOBILE: 090.486.2889

References

Related documents

His specific experience history includes six years of air quality permitting and enforcement with a state regulatory agency, nine years of environmental program management in

Analizom upitnika upitnika UIQ-7 (utjecaj poremećaja funkcije mokraćnog mjehura na svakodnevni život) prije i nakon tri, šest i dvanaest mjeseci od operacijske

Student affairs professionals should prepare themselves as best as possible to be advocates for the needs of students with visible and invisible disabilities just as social

Wireless Configuration Utility Wireless Setup Utility Wireless mode Wireless router router WLAN Wireless Local Area Network.

FOIPOP: The Nova Scotia Freedom of Information and Protection of Privacy Review

CB power mode Alarm level Relay state Mains unplugged or CB is in power down No Alarm NC On mains or battery at “wake up” Bed Alarm\** NO No Alarm NC. \* When the mains

Trobosan pemerintah dengan diubahnya kementrian kebudayaan dan pariwisata menjadi kementrian pariwisata dan ekonomi kreatif menjadi harapan baru bagi tumbuhnya pariwista di

In addition, if I marked "Yes" to any of the above questions, I hereby authorize release of information from my Department of Transportation regulated drug and alcohol