Introduction

1

About the forum

2

Electricity pricing and our planning proposal

highlights

3

Participant feedback on our prices and

planning proposal

8

Appendix

- Presentation: Our five-year plans, Networks NSW CEO Vince

Graham

-

Presentation: Endeavour Energy’s electricity plans and prices,

Endeavour Energy General Manager, Network Development Ty

Christopher

Further information contact:

Network Regulation

Mike Martinson, Group Manager Network Regulation, Networks NSW Ph: 02 9249 3120

Email: mike.martinson@endeavourenergy.com.au

Stakeholder Feedback

Kylie Yates, Group Manager Corporate Communications, Networks NSW Phone: 0418 607 575

Email: kylie.yates@ausgrid.com.au

Kate McCue, Manager Corporate Affairs, Endeavour Energy Ph: 02 9853 6141

Email: kate.mccue@endeavourenergy.com.au

(3)

1

Introduction

Customer representatives from across NSW gathered on 11

March 2014 to explore the industry’s plans for the next five years

and to consider the impact our plans will have on our share of

customers’ electricity bills.

Ausgrid, Endeavour Energy and Essential Energy held the joint forum for consumer advocacy organisations to understand their views and priorities. The forum formed part of the industry’s consumer engagement program for developing its plans for regulator approval.

Each business recently submitted draft transitional proposals to the Australian Energy Regulator which cover the 2014-2015 year. Each business is required to submit its full five year proposal to the regulator on 31 May.

The forum provided the opportunity to seek consumer representatives’ feedback on:

• our proposed plans,

• the impact of the plans on the electricity network and prices, and • how we can improve our customer service, communication and

engagement.

Feedback from the forum will be considered in developing our final, full five year plan.

This report provides an outline of the forum with peak consumer advocacy groups.

The feedback from the forums with residential and small business customers is provided in the separate report: Endeavour Energy’s Consumer

Engagement Report April 2014.

Senior industry representatives met with peak consumer group

representatives, including Vince Graham Networks NSW CEO (centre back row)

(4)

2

About the forum

Customer groups welcomed the opportunity to discuss issues

with Networks NSW CEO Vince Graham and other industry

leaders including Endeavour Energy General Manager Ty

Christopher, Ausgrid Manager Asset and Network Planning Neil

Gordon and Essential Energy Manager Network Regulation

Natalie Lindsay.

What we discussed

The following presentations were discussed with forum participants. • Networks NSW CEO covered:

1. What is Networks NSW?

2. Our objectives

3. How we are managing costs and prices

4. How the AER proposal process works

5. How we’re consulting with customers

6. Highlights of our proposals

7. Our challenge: declining electricity use puts pressure on customer prices and possible response: look at different ways of charging for electricity use.

• A representative from each of Ausgrid, Endeavour Energy and Essential Energy presented their network investment strategies and proposed expenditure for the five years to 2019.

The Networks NSW and Endeavour Energy presentations are attached.

Organisations represented at the forum

Ballina Shire Council Physical Disability Council NSW Break Thru People Solutions, Greystanes

Disability Services, Mountains Youth Services Team, Syd-West Multicultural Services Inc

PIAC Public Interest Advocacy Centre

Council on the Ageing (COTA) Salvation Army Department of Ageing, Disability and Home

Care

Wiradjuri Council of Elders

Energy & Water Ombudsman NSW Australian Energy Regulator Parramatta Chamber of Commerce Energex

FEEDBACK ON THE FORUM

“It was no small thing to see the thought and effort invested by very senior people in the forum…the making of the effort spoke volumes in its own right. I thought it was very valuable.

“While networks might stumble with engagement approaches in the early stages, just to have made this effort is recognition of the preparedness of the industry to listen and to value customers.”

(5)

2

3

ELECTRICITY

PRICING

AND OUR

PROPOSAL

HIGHLIGHTS

For the full proposal highlights presented at the forum,

refer to the presentations in the Appendix

(6)

4

17.48% 15.06% 16.22% 3.55% 0.01% -0.24% 1.22% -2% 0% 2% 4% 6% 8% 10% 12% 14% 16% 18% 20% 22% 2009-102010-112011-122012-132013-142014-152015-162016-172017-182018-19 Year

The proposed increase in our share of customers' electricity bills constrained to CPI (or less)

Movement in our share of electricity bills (nominal %)

Target:Our share of customers' electricity bills will increase by no more than CPI

ELECTRICITY PRICING AND PLANNING

Endeavour Energy has developed a proposal for the Australian

Energy Regulator which outlines how we plan to operate and

maintain the electricity distribution network now, and into the

future.

In developing our proposal to the industry regulator, our objectives place the customer first and promote the long term interests of customers with respect to safety, affordability and reliability.

Endeavour Energy’s costs are around 40% of a customer’s electricity bill.

The continuing decline in electricity use has been putting

pressure on customer prices.

Networks NSW has started a conversation with Peak Consumer

Advisory Groups about the need to rethink electricity tariffs and have

proposed introducing a declining block tariff rather than inclining block

tariffs.

(7)

5

SAFETY

By continuously

improving our safety

performance for

employees,

contractors and the

public

AFFORDABILITY

By striving to contain

average increases in

our share of

customers’ electricity

bills at or below CPI

RELIABILITY

By ensuring the

ongoing reliability,

security and

sustainability of our

network

EVERYTHING ENDEAVOUR ENERGY DOES IS DRIVEN BY

3 KEY PRIORITIES:

(8)

6

44%

5%

1.6%

OUR PROPOSAL FOR THE FUTURE

Our proposal focuses on keeping costs down and operating and maintaining an electricity network that is

safe, affordable and reliable for customers.

CAPITAL EXPENDITURE (CAPEX) - to build and renew the network and replace ageing equipment

Proposal highlights:

• Endeavour Energy will spend $1.7 billion on capex over the next five years. • We will spend $1.1 billion less than we did the last 5 years.

This is a reduction of 37% and is 44% below the forecast of inflation over the five year period

OPERATING EXPENDITURE (OPEX) - to maintain the existing electricity network

Proposal highlights:

• Endeavour Energy will spend $1.8 billion on opex over the next five years.

While this is an increase of 7%, this amount is still 5% below the expected level of inflation over the next five years.

FORECAST AVERAGE CUSTOMER ELECTRICITY USE – which impacts pricing

Proposal highlights:

• Average customer electricity use is expected to fall by 1.6% a year over 5 years.

This is due to rooftop solar, the high Australian dollar affecting manufacturing and the ongoing impact of past price increases. This puts pressure on prices.

(9)

7

BENEFITS AND RISKS

For transparency, below is a summary of the benefits and potential risks of our proposal to consumers.

Benefits to customers

Stable prices – We propose to keep average price increases to our share of customers’ electricity bills at or below CPI for the next five years • Reliability – We propose to maintain or slightly improve reliability in some

areas.

Safety – Our proposal aims to deliver programs that are safe and sustainable for the electricity network and the communities it serves. • Clarity of costs – We are giving customers greater transparency about

how much they pay for metering services.

New growth areas – Electricity infrastructure for new growth centres will foster local economic development.

Removing cost subsidies – Customers who do not use specific services (such as special meter test readings) will no longer subsidise those who do.

Potential risks to customers

Price volatility – If energy use is lower than forecast, a revenue cap may result in customers paying more than we propose.

Reduced reliability – If our capital program is not approved, we may need to postpone projects which could make the electricity supply less reliable in some areas.

Future prices – If our forecasts for economic growth, asset condition and customer connections are wrong, we may need to spend more than our AER allowance to address unexpected issues. This could add to customer prices in the 2020-24 period.

New rules – Customers who request a special service may now pay considerably more for that service as the AER now requires that those customers cannot be subsidised by our general customer base.

(10)

7

PARTICIPANT

FEEDBACK ON

OUR PRICES AND PLANNING

PROPOSAL

(11)

9

Themes from participant feedback

The main themes that dominated the discussion and participant

feedback were:

1. The biggest priority or concern for their members is affordability and stability of price, followed by maintaining the current level of reliability (without paying any more).

2. The most important issues for households with fixed incomes with

respect to electricity bills is keeping prices stable over the medium to long term, followed by the ability to reduce bills by using less electricity or efficient appliances.

3. They would be supportive of changing the way customers are charged for electricity if it meant prices would be more stable and predictable.

4. While many representatives recognised complex policy issues affect pricing, they also called for simplicity and clarity from the industry and its regulators to meet the longer term interests of customers.

5. Broadly, participants are pleased with the significance of safety, affordability and reliability as underpinning all Endeavour Energy’s operations.

(12)

10

Forum poll results

Which of the following issues is the biggest priority or concern for your members?

Response Percentage

Affordability and stability of prices 85.7% Maintaining current level of reliability (pay no more) 14.3% Paying more for better reliability 0% Paying less for reduced reliability 0% Safety of the electricity network 0% Better communication channels – i.e. mobile apps, online

info

0%

Other 0%

What would you say is the most important issues for households with fixed incomes with respect to electricity bills?

Response Percentage

Keeping prices stable over the medium to long term 50% Ability to reduce bills by using less electricity, efficient

appliances

25% Reducing cross-subsidies so they don’t pay for other

households’ technology (e.g. solar)

16.7% Better understanding of their electricity bill 8.3%

How supportive would you be of changing the way customers are charged for electricity if it meant prices would be more stable and predictable? (Noting that our share of bills won’t increase above CPI for the next 5 years.)

Response Percentage

Supportive 100% Neutral 0% Opposed 0%

(13)

Forum on electricity plans and prices

Welcome

2013

Networks NSW

Consumer

Advocacy

Groups

11 MARCH

(14)

Networks NSW

2

Agenda

1. Introduction

- Safety Briefing

- Networks NSW video

- Explanation of polling

2. Discussion: 5 year plans, priorities & challenges – Vince Graham, CEO

Break

3. Overviews by Ausgrid, Endeavour Energy, Essential Energy

4. Q&A and discussion

5. Wrap up and close

(15)

Our five-year plans

2013

Networks NSW

FORUM -

Consumer

Advocacy

Groups

Vince

Graham

11 MARCH

2014

(16)

Networks NSW

We will talk about

1.

What is Networks NSW?

2.

Our objectives

3.

How we are managing costs and prices

4.

How does the AER proposal process work?

5.

How we’re consulting with customers

6.

Highlights of our proposals

7.

Our challenge ahead

(17)

Networks NSW

8

What is Networks NSW?

NETWORKS NSW

(Umbrella Agreement)

AUSGRID

ENDEAVOUR

ESSENTIAL

Comprises Ausgrid, Endeavour Energy and Essential Energy (‘poles and wires in NSW”)

remain separate companies

joint Board

common CEO and senior management team

Why was it established?

Networks NSW was formed by the NSW Government on 1 July 2012 to:

Put downward pressure electricity prices and

save $400M

over 4 years, to help fund electricity rebates for low income households

What is Networks NSW?

?

(18)

Networks NSW

Our purpose and objectives

Our purpose:

Our objectives:

9

• Continuously improve safety performance

Safety

• Strive to contain our share of customers’

electricity bills to CPI or less

Affordability

• Ongoing reliability, security, sustainability of

the network

Reliability

To be of service to our communities by efficiently distributing electricity

to our customers in a way that is safe, reliable and sustainable.

(19)

Networks NSW

How we are managing costs (our share)

Households- Average network charges increased by 66% or $346

Small business - Average network charges 61% or >$1,000

We can only control electricity bills if we control our costs

Reform program - across the Ausgrid, Endeavour, Essential

$4.3billion in savings forecast over the 5 years to 2016:

- $1.4 billion savings over past 2 years

- another $2.9 billion savings identified over next 3 years

10

66%

61%

Past:

Electricity network bill increases of 60% (2009- 2014)

(20)

Networks NSW

Transitional proposal for 2014-15

Three objectives :

The next 5-year regulatory period starts in July 2014 and ends in June 2019.

We provided our draft transitional proposals to the AER on 31 January 2014.

Outlines our plans for the network and the effect on prices for 2014-15 only.

Our plans are funded by the network part of customers’ electricity bills

We also had to give an indication of our plans for the next 4 years of the period.

We submit our full, substantive proposals for the remaining 4 years on 31 May 2014

AER approves prices for 2014-15.

AER reviews that decision when considers substantive proposals (April 2015).

11

Affordability

-

CPI

Reliability

(21)

Networks NSW

Substantive (full) proposal for 4 years

We provide our substantive proposal to the AER in May 2014.

The AER will make a determination for the last four years of the 2015/16

to 2018/19 period in April 2015.

The AER will review our proposal, taking into account stakeholder submissions.

The AER will review whether the prices for the transitional year (2014-15) were efficient,

and if necessary make adjustments to the prices for the last 4 years.

The AER’s decision will also set cost reflective prices for metering and more than 50

ancillary services (non-routine services requested by the customer).

We want to inform you of our proposals and understand any concern

or priorities your members have

.

(22)

Networks NSW

Proposal Highlights

(combined totals over 5 yrs)

;

13

Capital program will reduce from $15.6 billion approved for last 5 year period to

a proposed $9.6 billion for the 2014-2019.

= a 38% reduction, which is 45% below forecast rate of inflation

Nominal

Real

15%

Will increase from $6.7 billion approved by the AER for last 5 year period to a

proposed $7.8 billion for the 2014-2019.

= a 15% increase, which is 2% above the forecast rate of inflation

Expected to fall by 1.6% a year over 5 years from 1 July 14.

Due to rooftop solar, high Aussie dollar affecting manufacturing and ongoing

impact of past price increases. This puts pressure on prices.

Average customer electricity use across NSW – down 1.6% p.a

Operating Program - up from $6.9 billion to $7.7 billion

Capital program - down from $15.6 billion to $9.7billion

1.6%

38%

45%

(23)

Networks NSW

Highlights - what it means for customers

Ausgrid

14

17.48% 15.06% 16.22% 3.55% 0.01% -0.24% 1.22% -2% 0% 2% 4% 6% 8% 10% 12% 14% 16% 18% 20% 22% Year

Movement in our share of electricity bills (nominal %)

Now

Then

Endeavour Energy

Essential Energy

Our share of electricity bill increases will be held at or below CPI for the next 5 years

• Our share of customers’ electricity bills will fall in real terms

• Greater stability to help households and small businesses manage their budgets

22.99% 19.50% 21.43% 21.90% -0.90% 0.32% 2.09% 2.43% 1.03% 1.25% -3% -1% 1% 3% 5% 7% 9% 11% 13% 15% 17% 19% 21% 23% 25% 18.34% 20.05% 21.26% 18.64% -2.30% 2.49% -4% -2% 0% 2% 4% 6% 8% 10% 12% 14% 16% 18% 20% 22%

Movement in our share of electricity bills (nominal %)

Now

Then

(24)

Networks NSW

Highlights – our transitional proposals

Ausgrid

Endeavour

Essential

Impact on Customer Bills

July 2014 (our share)

+1.12%

-0.24%

+2.49%

Real change in capital spending

(09/14 v’s 15/19)

-48%

-44%

-42%

Real change in operational

spending

+2%

-5%

+8%

Assumed wage increase p.a.

2.5%

2.5%

2.5%

Electricity use forecast p.a.

-1.5%

-1.6%

-1.6%

Reliability of our network

steady

steady

steady

Opening Return on Asset Base

(RAB) – July 2014

$14.6bn

$5.6bn

$6.8bn

(25)

Networks NSW

Change to typical electricity bills (our share)

proposed from 1 July 2014

16

Typical Customers

Annual bill

2013/14

($ p.a)

Annual bill

2014/15

($ p.a )

Change ($)

Change (%)

Ausgrid

Household (5MWh)

$812.52

$821.65

$9.13

1.12%

Small business (15MWh) $2,612.73 $2,656.34

$43.61

1.67%

Endeavour

Household (6MWh)

$705.58

$703.87

- $1.71

-0.24%

Small business (26MWh) $2,375.35 $2,369.60

- $5.75

-0.24%

Essential

Household (7MWh)

$1,282.80 $1,314.72

$31.92

2.49%

Small business (23MWh) $4,435.03 $4,545.39 $110.36

2.49%

Table: Electricity bill impact from distribution network charges for typical household and small business customers

($nominal)

(26)

Networks NSW

Falling electricity use

1

17

Electricity use is expected to fall by 1.6% each year on average across

the NSW over the next 5 years (2014-19).

Due to take up of domestic solar panels, high Aussie dollar affecting

Australian manufacturing and the customer response to past price increases.

48000 50000 52000 54000 56000 58000 60000

FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19

Actual energy/ expected for FY2014

AER determination

Forecast (transitional proposal)

(27)

Networks NSW

Industry challenge ahead

18

Why?

1. Historic tariff structures

• Network costs mostly fixed

• Customer charges mostly variable - based on how much

electricity is used - on an inclining scale

• Price structures don’t reflect costs

2. Technology

•Customers who can afford technology can avoid variable

electricity charges (ie home owners with disposable income)

•Those that can’t afford technology bear the burden of

declining electricity consumption (renters, low & fixed incomes)

Declining electricity use puts pressure on customer prices

$

$

$

(28)

Networks NSW

35.00

10.89

14.58

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

20,000

0.00

20.00

40.00

60.00

80.00

100.00

120.00

Fixed (c/day)

1st Block

(c/kWh)

2nd Block

(c/kWh)

3rd Block

(c/kWh)

IB

T T

hre

sh

old

(k

W

h p

.a

.)

Co

mp

on

en

t P

ric

e

NSW Endeavour N70

Endeavour N70

Block Threshold (rhs)

Current tariff structure - inclining

19

Family uses

9,000 kWh pa

Fixed

$128

33c/day x 365

1

st

Block $762

10.89 c x

2

nd

Block $292

14.58c x

TOTAL $1,128

Example:

(29)

Networks NSW

20

Different ways of charging for electricity use

DGhjfg

(30)

Networks NSW

Discussion

(31)

Networks NSW

POLL

How supportive would you be if we changed the way we charged

for electricity so prices were more stable and predictable in the

long term?

(Noting that our prices will not increase by more than CPI for 5 years)

 Extremely supportive

 Supportive

 Mildly supportive (sounds ok, need convincing)

 Neutral

 Mildly opposed (sceptical but open to more information)

 Opposed

 Strongly opposed

(32)

Networks NSW

23

Customer Engagement

Focus on improving our engagement long term

Engagement strategy follows best practice guidelines from AER based on IAPP

Engagement underway (Facebook, face-to-face meetings, research conducted,

analysis of existing engagement activities) to understand priorities and how

people want to engage with us in future

Customer

Research

-Key Themes

Affordability

Reliability

Information

Hardship

Demand

Management

Engagement

Safety

(33)

Networks NSW

Customer Engagement – new channel

Using new channels to engage with customers – mums and dads.

“Your Power, Your Say” - joint Facebook page

allows ongoing conversations with our customers

Topics include

Reliability

Streetlights

Solar

Pricing

Vegetation Management

Demand Management

Safety

Metering

24

(34)

Networks NSW

What customers told us

No more price shocks – want

affordable

, stable prices

Satisfied with

reliability

of network

don’t want to pay more for better reliability or less for reduced reliability

Improve customer

value

without affecting reliability

Ensure

safety

of network

Better

communications

channels: mobile apps, online

25

Affordability

Communications

Safety

Value

Reliability

(35)

Networks NSW

POLL

Which of the following customer issues is the biggest priority or concern

for your members?

 Affordability and stability of network prices

 Maintaining current level of reliability (without increasing prices)

 Paying more for better reliability

 Paying less for reduced reliability

 Safety of electricity network

 Better communications channels – ie mobile apps, online information

 Other

(36)

Networks NSW

POLL

What would you say is the most important issue for households

with fixed incomes with respect to electricity bills?

 Ability to reduce their bills by using less electricity, efficient appliances

 Keeping prices stable and predictable over the medium to long term

 Better understanding of their electricity bill

 Reducing cross-subsidies so they don’t help pay for other households’

technology (eg solar)

(37)

Networks NSW

Thankyou

28

(38)

Endeavour Energy’s

electricity plans and

prices

Consumer Forum

11 March 2014

Ty Christopher

(39)

2

ENDEAVOUR ENERGY’S NETWORK

$5.3 billion electricity network

Serves 2.2 million people in

households and businesses

across Sydney’s Greater West,

Blue Mountains, the Illawarra,

Southern Highlands and South

Coast.

170 major substations, 315,000

power poles and 28,000 smaller

substations connected by 33,000

kilometres of underground and

overhead cables.

(40)

OUR OBJECTIVES

Safety – our number one

priority. We want to

continuously improve our

safety performance.

Affordability - contain our

share of network bill

increases to at or below CPI

for customers.

Reliability - ensure the

ongoing reliability, security

and sustainability of the

network.

(41)

OUR NETWORK

4

Peak temperatures typically higher and more sustained than

coastal areas - greater chance of temperatures being above

40ºC in any given year.

8 in 10 homes in Western Sydney have air conditioners.

8.5% of customers have solar generators on their homes. This

costs other customers $52M per year until end of 2016.

Our network covers Sydney’s North West and South West

Growth Centres. They will house more than 500,000 people in

more than 180,000 homes.

Two cities each the size of Canberra to be built within the

(42)

NORTH WEST GROWTH CENTRE

5

• 16 Precincts

• 70,000 new

dwellings

• 200,000

people

(43)

ORAN PARK – SOUTH WEST GROWTH CENTRE

6

• 18 Precincts

• 110,000 new

dwellings

• 300,000 people

(44)

7

(45)

8

TO THIS: KELLYVILLE 10 YEARS ON

(46)

CAPITAL EXPENDITURE 2014-19

Capital expenditure is the money used to expand and renew the network.

Capital will reduce by $1.1 billion in 2014-19 compared to 2009-14

This is a 37% reduction or 44% below the forecast of inflation over 2014-19.

(47)

CAPITAL EXPENDITURE 2014-19

Key challenges:

maintaining a safe, reliable and sustainable network

renewing ageing network assets

while there is falling demand across the broader network, we still

need to service substantial growth in demand in the key greenfield

growth areas of North West and South West Sydney

(48)

OPERATING EXPENDITURE 2014-19

Money used to employ workers and undertake network maintenance

Operating expenditure to increase from $1.7B in 2009-14 to a proposed

$1.8 billion over 2014-19

This is a 7% increase, but 5% below the forecast of inflation over 2009-14

$100 $150 $200 $250 $300 $350 $400 $450 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 O p ex ( $m , real 2013 -14)

ENDEAVOUR - Transitional proposal opex and "underlying

opex"

Actual / Fcast (2019-14) AER opex allowance (2009-14)

Transitional proposal opex (including ACS and ERW) Underlying Opex

(49)

OPERATING EXPENDITURE 2014-19

Network operating costs includes :

network inspection, maintenance and repair

vegetation management to keep trees a safe distance from

powerlines

fault and emergency repairs

customer service

operational switching and outage management

demand forecasting

procurement, logistics and stores

information technology that supports network operations

(50)

ENDEAVOUR ENERGY PRICES

Avoid price shocks

Our share of an average household electricity bill will decrease by 0.24%

next year, which is 2.68% below the forecast rate of inflation.

2013-14

2014-15

Change ($)

Change (%)

Residential customer

$705.58

$703.87

-$1.71

-0.24%

Small business customer

$2,375.35

$2,369.60

-$5.75

-0.24%

Typical bill impact ($, nominal)

(51)

QUESTIONS

(52)

Further information contact:

Network Regulation

Mike Martinson, Group Manager Network Regulation, Networks NSW Ph: 02 9249 3120

Email: mike.martinson@endeavourenergy.com.au

Stakeholder Feedback

Kylie Yates, Group Manager Corporate Communications, Networks NSW Phone: 0418 607 575

Email: kylie.yates@ausgrid.com.au

Kate McCue, Manager Corporate Affairs, Endeavour Energy Ph: 02 9853 6141

References

Related documents

Konstruktyvistinë treèiafrontininkø pozicija suartina juos su ketvirtojo deðimtmeèio Lietu- vos poezija - J. Taèiau vis dëlto treèiafrontinin- kø kûryboje avangardizmo

This study aimed at understanding how exposing second year medical learners to the clinical reasoning process (via computer based instruction) prior to simulation learning

The VA Office of Inspector General Office of Healthcare Inspections conducted an inspection in response to the unexpected death of a patient in the substance abuse

Search results of the study’s 59 graphic novel titles in the 38 libraries’ discovery tools or next generation catalogs for both social tagging activity and genre headings

The traffic loads are simulated by four rectangular load pressures, and the pavement and the subgrade are regarded as two elastic layers resting on a poroelastic half-space

Using writing analysis techniques to study marital relationship offers potential benefits for couple interventions and future research examining marital satisfaction.. The concept

sub-clouds, which may be in the private cloud or in the Partner/Public cloud. Moreover, encryption of the data in rest is an optional service for critical