Full text

(1)

WORK SESSION

April 22, 2014

City Commission Room, 700 N. Jefferson, Junction City KS 66441

Mayor Michael Ryan

Vice Mayor Mick McCallister

Commissioner Pat Landes

Commissioner Jim Sands

Commissioner Cecil Aska

City Manager Gerald Smith

Assistant City Manager Cheryl Beatty

City Attorney Catherine Logan

City Clerk Tyler Ficken

1. 7:00 P.M. - CALL TO ORDER

2. SPECIAL PRESENTATIONS:

a.

Water and Wastewater Financial Business Plan and Water & Sewer Rate

Recommendations Summary Presentation.

(2)

Backup material for agenda item:

a. Water and Wastewater Financial Business Plan and Water & Sewer Rate

Recommendations Summary Presentation.

(3)

City of Junction City

City Commission

Agenda Memo

April 15, 2014

From: Gregory S. McCaffery, Municipal Services Director

To: City Commission and Gerald Smith, City Manager

Subject: Water and Wastewater Financial Business Plan and Water & Sewer Rate Recommendations Summary Presentation

Objective: City Commission Workshop for the Water and Wastewater Financial

Business Plan and Water & Sewer Rate Recommendations Summary Presentation

Explanation of Issue: The City on February 18, 2014 retained the services of Raftelis

Financial Consultants, Inc. (RFC) to complete a Water and Wastewater Financial Business

Plan and provide recommendations on water and sewer rates towards implementation of

the City’s water & wastewater overall systems operations. These operational costs include general operations & maintenance, capital improvements, and debt obligations for each system.

The City, through HDR Engineering (HDR), recently complete reports which identified immediate, short and long term improvement needs at the City’s three treatment plants. Additionally, City staff and HDR Engineering completed a review of the City’s Master Water & Wastewater Plans, completed by Burns & MacDonald towards needed water distribution and sanitary collection systems replacement needs. These “Needs Summaries” were used towards the development of the Financial Business Plan, in addition to the overall costs for services and debt obligations.

RFC will provide three alternatives to the City Commission for consideration and discussion. These alternatives include the existing water and wastewater revenues, costs of service and planned improvements and rate considerations. The presentation is provided in order that the City Commission has a general understanding of the financial needs and development of the City’s a water & sewer rate recommendations.

As a follow-up to this presentation, and subject to input from the City Commission, it is the intent of RFC to provide an overall recommendation to the City for consideration and approval of the final Financial Business Plan and Water & Sewer Rate Recommendations. These recommendations would be subsequently brought before the City Commission for consideration at a regular Commission meeting in late May/ June 2014.

(4)

City of Junction City

City of Junction City

CITY OF

JUNCTION CITY

Water and Wastewater Financial Business Plan

(5)

For Discussion

Adequacy of Existing Water and Wastewater Revenues

Water and Wastewater Financial Business Plan

Alternative #1 (Recommended Schedule)

Alternative #2 (Extended)

Alternative #3 (Deferred Regulatory)

Cost of Service Study

Rate Design Considerations

(6)

City of Junction City

ADEQUACY OF

(7)

Factors Impacting Revenue

Sufficiency

Demand Factors

Normal decline in per capita water consumption

Difficulties in forecasting account growth/decline

Operating Costs

Inflationary O&M Increases

Financial Management Practices (e.g. reserve policy)

Capital Costs

Cash Funded Capital

(8)

City of Junction City

City of Junction City

Water Utility Revenues at Existing

Rates

$1 $2 $3 $4 $5 $6 $7 $8 $9 $10 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 M illio n s

Recommended Extended Deferred Regulatory Revenue @ 2014 Rates

(9)

Wastewater Utility Revenues at

Existing Rates

$1 $2 $3 $4 $5 $6 $7 $8 $9 $10 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 M illio n s

(10)

City of Junction City

FINANCIAL BUSINESS

PLAN

(11)

Financial Planning Overview

Purpose: determine rate revenue required for financial

sustainability

Process

Forecast customer units of service and revenue at existing rates

Forecast operation and maintenance expenditures (“O&M”)

Forecast capital expenditures

»

CIP

»

Existing and Proposed DS

(12)

City of Junction City

City of Junction City

Factors Driving Financial Plans

Inflationary O&M Increases

Size and Timing of Capital Improvements

Financial Policies

(13)

Inflationary O&M Increases

Largely associated with personnel costs

Annual COLA adjustments to Salaries and Medical

Legacy costs

»

Pension and Retiree Healthcare

»

Generally increase with salaries, usually higher based on pension funding

levels

Also related to the cost of materials and supplies (e.g. chemicals,

electricity)

Veolia Water Contract

Increases in cost of services provided via the General Fund (i.e.

(14)

City of Junction City

City of Junction City

O&M Inflation Assumptions

0.0% 2.0% 4.0% 6.0% 8.0% 10.0% 12.0%

Medical Transfer to Other Funds Chemicals Utilities-Electric Utilities-Gas General Materials/Supplies Vehicle Maintenance Telecommunications Salaries and Wages Benefits Pension

(15)

Capital Improvement Programs

Some recapitalization necessary on an annual basis

Level and frequency based on age of water and wastewater

system and original construction materials

Can reduce O&M costs (i.e. less sewer back-ups, water main

breaks etc.)

Avoids “mining assets”

CIP includes projects from Burns and McDonnell Master Plans

+ WTP/WWTP needs identified by HDR Engineering

Plan to fund future improvements with KPWSLF loans + some

(16)

City of Junction City

City of Junction City

Water CIP

$2 $4 $6 $8 $10 $12 $14 $16 $18 $20 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 M illio n s

Recommended Extended Deferred Regulatory

(17)

Wastewater CIP

$5 $10 $15 $20 $25 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 M illio n s

Capital Expenditures (Wastewater)

(18)

City of Junction City

City of Junction City

Financial Policies

Separate Financial Plans for Each Utility

Equity for Customers

Ensures one fund is not subsidizing another

Operating Reserve

Target of 90 days O&M and Debt Service

Generally minimum rec’d for utilities

Existing and Proposed Debt Service Coverage

Currently GO and SRF outstanding

Minimum Target of 1.25 Overall

(19)

Reserve Balance (Water)

$1 $1 $2 $2 $3 $3 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 M illio n s

Recommended Extended Deferred Regulatory

(20)

City of Junction City

City of Junction City

Reserve Balance (Wastewater)

$1 $1 $2 $2 $3 $3 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 M illio n s

Recommended Extended Deferred Regulatory

Target ("Recommended") Target ("Extended") Target ("Deferred Regulatory")

(21)

Debt Service Coverage (Water)

1.10 1.15 1.20 1.25 1.30 1.35 1.40 1.45 1.50 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Recommended Extended Deferred Regulatory Target (1.25x)

(22)

City of Junction City

City of Junction City

Debt Service Coverage (Wastewater)

0.50 1.00 1.50 2.00 2.50 3.00 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Recommended Extended Deferred Regulatory Target (1.25x)

(23)

COST OF SERVICE

STUDY

(24)

City of Junction City

City of Junction City

Cost of Service Study Overview

Purpose:

Allocate costs to customer classes based on the demands they impose

on the water and wastewater utility systems

Demand

»

Water: Average and Peak (Max Day, Max Hour) usage, and Customer

Costs

»

Wastewater: Volume, Strength (BOD and TSS) and Customer Costs

Process

Determine revenue requirement

Allocate revenue requirement to cost components

Determine units of service by customer class

Determine unit cost of service

Allocate costs to customer classes

(25)
(26)

City of Junction City

City of Junction City

Rate Design Considerations

Balance Between Fixed vs. Volumetric Charges

Move to Customer Class Rates?

Contract Rates

(27)

Existing Breakdown

Considerations

Fixed Charges

Typically recovers meter reading

billing and collection and CS

(+) Stable $

(-) Impact on lower volume users

Volumetric

Recovers average and peak demand

(water), strength and volume

(wastewater)

(+) Impact on lower volume users,

(-) Variable $

Fixed Versus Volumetric Charges

$0.42

$0.58

(28)

City of Junction City

City of Junction City

Move to Rates by Customer Class?

All classes currently pay the same volume and fixed charges

More equitable

»

Customers pay according to how they cause costs to be incurred by

utility

Wastewater: higher volume and strength classes pay more

Water: higher peaking classes pay more

Creates winners and losers (initially)

Potential Demand Response

»

Losers may use less

»

Winners unlikely to increase usage

Can be difficult to understand/explain

(29)

Contract Rates

Armour Eckridge

Water

»

5% total water rate revenue

»

The higher of $1.00 per 1,000 gallons or 60% of residential rate

»

Currently charged 37% of Tier 2 rate

$.88 per CCF

$1.18 per 1,000 gallons

»

Recommendation: Should move towards 60%

Wastewater

»

10% of wastewater rate revenue

»

AE Units and revenue lower than stipulated in ED contract

»

Recommendation: Industrial Surcharge should be increased

Grandview Plaza: Inflation Only (3% assumed)

(30)

City of Junction City

(31)

Projected Combined Bill (5 CCF)

$20.00 $40.00 $60.00 $80.00 $100.00 $120.00 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 $ /M o n th

(32)

City of Junction City

City of Junction City

Water Bill vs. Area Utilities

29

$0.00 $5.00 $10.00 $15.00 $20.00 $25.00 $30.00 $35.00 $40.00

(33)

Wastewater Bill vs. Area Utilities

$10.00 $20.00 $30.00 $40.00 $50.00 $60.00

(34)

City of Junction City

References

Related documents

14 When black, Latina, and white women like Sandy and June organized wedding ceremonies, they “imagine[d] a world ordered by love, by a radical embrace of difference.”

An analysis of the economic contribution of the software industry examined the effect of software activity on the Lebanese economy by measuring it in terms of output and value

UPnP Control Point (DLNA) Device Discovery HTTP Server (DLNA, Chormecast, AirPlay Photo/Video) RTSP Server (AirPlay Audio) Streaming Server.. Figure 11: Simplified

and environmental challenges in the region and bringing policy makers attention to the problems.. in the

If the roll is equal to or higher then the model's shooting skill then it hits and wounds as described in close combat.. If the roll was lower then the model's shooting skill then

The main objective of the Project on Movie Ticket Booking System is to manage the details of Movie, Customer, Booking, Payment, Seats.. It manages all the information about

As inter-speaker variability among these the two groups was minimal, ranging from 0% to 2% of lack of concord in the 21-40 group and from 41% to 46% in the 71+ generation, we

Every year, more than 20 million passengers (more than 10 million for the Shuttles and almost 10 million for high-speed passenger trains) travel through the Channel Tunnel. Eurotunnel