INTRODUCTION

tyco

Fire & Security

is a joint venture between Suwaidi Engineering and Tyco Fire &

Integrated Solutions specializing in the design, supply, installation, testing and

commissioning of fire protection equipment, security & access control, BMS, voice alarm,

structured cabling, I.T. systems and integrated systems. Tyco has been at the forefront in

the fire protection and security industry for over a century. Global technology through local

representation has been the critical success factor for the Company in the past and it

remains the mission for the future.

As well as the above mentioned systems, Tyco mechanical product range allows Tyco to

offer quality and professional services to clients throughout the Middle East for all of the

following systems:-

Inergen, Vesda, sprinkler, foam, water mist, CO

2

, FM200, water spray, dry chemicals, fire

alarm, CCTV, security & access controls, voice alarm, intercom and fire telephone systems,

building automation systems, I.T./structured cabling systems and audio visual systems.

Economic growth throughout the world this century has brought new industrial technology,

increased competition and hazardous working environments. This in turn has resulted in

tighter regulations and new world-wide legislation being brought into force to protect lives,

environment and property. The objective of the Tyco group is to recommend, provide and

maintain optimal fire protection and safety & control solutions for all risks.

The operating units of Tyco are structured into divisions which serve specific market sectors

both for on and offshore systems. These range from small commercial projects and

systems through to sophisticated ‘state of the art’ fire and gas emergency shutdown

detection and control systems. All projects are managed and executed in line with the

Quality Assurance Procedures of Tyco’s ISO 9001 Quality System.

To ensure that Tyco stays at the forefront of technology Tyco’s product research and

development is ongoing at major research centers in the US and Europe, which employs

over 300 dedicated engineers. Manufacturing, technical and development resources are

available to resolve all technical challenges and stand behind the performance of the Tyco

group.

(3)
(4)

CO

RP

O

RA

TE

ST

RU

CT

UR

E

TY

CO

IN

TE

RN

AT

IO

N

AL

TY

CO

FI

RE

&

IN

TE

GR

AT

ED

SO

LU

TI

O

N

S

(T

FI

S)

SU

W

AI

D

IE

N

G

IN

EE

RI

N

G

GR

O

UP

TY

CO

FI

RE

&

SE

CU

RI

TY

UA

E

LL

C

(5)

Q

H

SE

O

RG

AN

IZ

AT

IO

N

ST

RU

CT

UR

E

JEFF W

. SHELDON

Dir

ector

and G

eneral M

anager

MARK ROBERTS

Deputy General Manager

QHSE MANAGEMENT

SR

IN

IVASAN

HSE E

nginee

r

NAVAZ

HSE E

nginee

r

AZAD ALI

HSE Manag

er

RASHID MAHMOOD

QA

QC Mana

ger

NEH

A

IL

A

L

M

A

NSOURI

S

af

ety Of

ficer

THUL

A

S

I

RISHN

A

N

S

af

ety Of

ficer

HENRY B

A

L

C

E

QAQC Engineer

HECT

OR MASCARENHAS

S

eni

or QA

QC

E

ngi

ne

er

CRAIG NIXON

Business Developm

ent

M

anager

NIGEL MILLINS

Contracts Manager

(Service a

nd

Small Wo

rks)

DAVID MORTIMORE

Cont

ract

s Manager

(Pro

jects)

RON

A

L

D

SORI

A

N

O

QAQC Engineer

RENEN DE LEON

QAQC Engineer

JON

A

T

H

A

N

BA

SUEL

QAQC Engineer

S

A

LEEM MOHD.

HSE Engin

eer

MOHD. SH

A

M

HSE Engin

eer

(6)
(7)
(8)

PREQUALIFICATION FACTS

1.

NAME OF ORGANISATION and LOCATION OF OFFICES

tyco

Fire & Security UAE LLC

HEADQUARTERS:

Location/Address

:

Abu Dhabi Office:

6

th

Floor, Old Al Noor Hospital Bldg.

Hamdan Street

P.O. Box: 3333

Tel: (0971) 2 6777 776

Fax: (0971) 2 6768 746

Email:

[email protected]

Dubai Office:

P. O. Box – 294458

Dubai,

U.A.E.

Tel: (00971) 4 2896711

Fax: (00971) 4 2896722

Email:

[email protected]

Qatar Office:

Tyco Qatar Fire & Security Branch LLC

P.O. Box 47679

Salwa Street, Zone 56, Company 8

(Above Mercedes Showroom)

Midmac Roundabout

Doha, Qatar

Tel: (00974) 4502680

Fax: (00974) 4502686

Email :

[email protected]

Contact Person:

Mr. Jeff W. Sheldon

(9)

2.

NATURE OF BUSINESS

tyco

Fire & Security

provide all types of fire protection, security & access

and safety, communication and control systems to the offshore, marine,

onshore power generation, chemical, petrochemical and high hazard

industrial markets, as well as the commercial market. The company

undertakes the design and supply of fire and gas detection systems,

emergency shutdown, data gathering, graphic display, safety and control,

process control power and information systems, CCTV, access control,

security, structured cabling/I.T., integrated systems, emergency voice

evacuation, public address, audio visual systems and fire extinguishing

systems using water, foam, gas and dry powder.

3. REGISTRATION

DETAILS:

Abu Dhabi

:

Chamber of Commerce

18492

Municipality

44654

Economy and Commerce

28828

Dubai

:

Chamber of Commerce

43331

Municipality

246141

Qatar

:

Commercial

28146

Municipality

52180

Civil Defence :

13537/97

4.

PARENT COMPANY DETAILS:

Tyco Fire & Integrated Solutions

Suwaidi Engineering Group

Wormald Park, Grimshaw Lane

P.O. Box 3333

Newton Heath

Abu Dhabi

Manchester, M40 2WL

United Arab Emirates

(10)

5. MANPOWER

DETAILS

KEY PERSONNEL

ƒ

DIRECTOR & GENERAL MANAGER

:

JEFF W. SHELDON

ƒ

DEPUTY GENERAL MANAGER

:

MARK ROBERTS

ƒ

CONTRACTS MANAGER

:

NIGEL MILLINS

(Service and Small Works)

ƒ

CONTRACTS MANAGER

:

DAVE MORTIMORE

(Projects)

ƒ

BUSINESS DEVELOPMENT MANAGER

:

CRAIG NIXON

ƒ

SALES MANAGER – COMMERCIAL

:

TERRY WALKER

ƒ

SALES MANAGER – OIL&GAS ELEC.

:

N. GANESAN

ƒ

SALES MANAGER – OIL&GAS MECH.

:

D. MAHESH KUMAR

ƒ

SALES MANAGER - SERVICE

:

THULASI RAM

ƒ

QAQC MANAGER

:

RASHID MAHMOOD

ƒ

HSE MANAGER

:

AZAD ALI

DEPARTMENTS

Total Nos

MANAGERS / DIRECTORS

11

ACCOUNTS

16

SALES

19

PRODUCTION

210

CAD / DESIGN

19

QAQC / HSE

11

(11)

6. FINANCIAL

INFORMATION:

ƒ

Bankers

HSBC Bank Middle East

P.O. Box 242

Abu Dhabi, UAE

ƒ

Auditors

Cooper Lybrand

ƒ

Insurance Cover

Abu Dhabi National Insurance Company

ƒ

Bonds Provided

Tender

Bond

Advance Payment Bond

Performance Bond.

SELECTED FINANCIAL DATA:

Year ended 2006 :

Turnover: DHS

103,330,000.00

(UAE Dirhams One Hundres Three Million Three Hundred

Thirty Thousand Only)

(12)
(13)

PRODUCTS AND SERVICES

1. PRODUCT

RANGE:

In addition to system design, supply and sale of standard equipment and

spares, Tyco also undertakes the installation and commissioning of systems,

training of operators and maintenance contracts:

Products Manufactured, Supplied and Supported by

tyco

:-x Fire & gas detection & alarm systems

x Vesda detection systems

x CCTV

systems

x Security

systems

x Access control systems

x Integrated systems

x Graphic display systems

x Waterspray and sprinkler systems

x Skid mounted fire protection equipment

x Manual alarm systems

x INERGEN

“

gas extinguishing systems

x CO2

systems

x Building Management Systems

x NOVEC 1230™ gas extinguishing system

x FM200 gas extinguishing system

x Structured

cabling

x

Audio visual Displays

x Foam

systems

x

Fire monitor systems (water and foam)

x

Integrity area testing

x

Passive fire protection

x

Dry powder systems

x

Portable and mobile fire extinguishers

x

Safety and rescue equipment

x

Live line insulator washing system

x

Water Supplies / Pumping Sets

x

Kitchen Hood Fire Fighting System

(14)

2.

SPARES, TESTING AND MAINTENANCE:

Spares stocked in our warehouse in Mussafah, along with distribution

warehouses in Jebel Ali, for all major systems supplied. Back up is also

available from extensive worldwide stocks.

Testing facilities available for products at our Mussafah workshop and Jebel

Ali refilling plant.

Maintenance of all systems/products we provide is available 24 hours a day,

365 days a year.

3.

INSTALLATION AND COMMISSIONING:

tyco

Fire & Security

offers:-

- Design

- Supply

- Site

installation

- Site

supervision

-

Own labour force

-

Full on site commissioning

-

In-house training of clients/operators

-

On-site training of clients/operators

(15)

4. DESIGN

CAPABILITIES:

tyco

Fire & Security is an Engineering and Contracts Company who

have the capability to using client requirements and specifications as a basis,

to carry out full design and produce detailed working drawings using the most

up to date computer aided designed software.

5. CONTRACTING

CAPABILITIES:

PROJECT MANAGER:

A Project Manager is appointed who has full responsibility for all activities

from the time of order award, through installation, commissioning at site and

to the end of the guarantee period.

SUB CONTRACTORS:

Our choice and appointment of sub-contractors is subject to the client’s

agreement. In the event of a client refusing to agree to our nominated

sub-contractor we accept the decision as uncontestable. We then propose

alternative sub-contractors until such time as agreement is forthcoming.

MAJOR SUB-CONTRACTOR:

As this is dependent upon the nature of work various Sub-contractors will be

employed. Tyco have established an approved list of Major Sub-contractors,

which is available on request.

(16)

PLANNING:

Contract planning is carried out using Computer Aided Planning and Project

Management software, which enables Tyco to produce output in barchart or

Critical Path Network.

QUALITY ASSURANCE/QUALITY CONTROL:

Quality plans are developed for contracts and are used to monitor

engineering/manufacturing/procurement activities as well as ensuring

installation and commissioning procedures are adhered to.

SERVICE and MAINTENANCE

Tyco currently service and maintain onshore Oil and Gas installations

carrying out works on Fire & Gas, PAVA, Security Systems, Fixed

Extinguishing and Sprinklers. This service is currently carried out to key

clients within the U.A.E. on a 24/7 basis which include :

x

TAKREER

x

GASCO

x

ADNOC

x

National Bank of Dubai

x

Emirates

(17)
(18)

LOCAL WORKSHOP and STORES FACILITIES

Tyco Fire & Security UAE has its own workshop facility located in Mussafah, Abu Dhabi.

This facility spans around 2,000 sq. meter area, housing all the necessary requirements to

make it a complete unit for all needs of local support on all storage, fabrication, painting,

assembly, testing, inspection, etc. for Tyco, in the UAE.

The workshop facility is set up with the following :

1. ADMINISTRATION OFFICE

This office is a complete admin facility with five (5) telephone lines, one (1) fax line

and email facility. The office runs with direct interaction with our Head Office in Abu

Dhabi. It is the base for the company’s Construction Manager and all the service

and maintenance activities of Tyco.

The office facility houses the following personnel :

x

One (1) Administration Officer

x

One (1) Safety Engineer

x

One (1) Procurement/Shipping Coordinator

x

Service and Maintenance personnel

x

One (1) QA/QC Engineer

x

All under the supervision of a Construction Manager

The office has been provided with complete needs of sanitation, lighting, water,

parking, air-conditioning, file storage/stationery, first aid, fire fighting equipment, etc.

2. STORAGE

The storage requirements in this workshop are extensive and planned to cater to all

the needs of Tyco. This includes for the following :

x

Fire protection equipment stocks ready for sale.

x

Regular and critical/emergency spare parts, for all fire protection systems.

x

All archived documents of the Head Office.

x

Electrical – fire detection and alarm equipment, stocks and spares.

x

Tools and tackles for construction work.

x

Ready storage for all consumables for the operation of the workshop and

site construction.

All the materials moving in and out and the materials inventory is maintained on a

day-to-day basis in a computerized manner.

(19)

3. FABRICATION

The facility has a covered area housing the main fabrication yard. The fabrication

yard has complete equipment, tools and tackles to carry out the major fabrication

activities like cutting, grinding, drilling, welding, sand blasting, painting, etc.

This fabrication yard produces all the requirements of Tyco’s construction/installation

materials like fabricated/threaded/grooved pipework, welded pipe spools, pipe

brackets, all the required sand blasting and painting for the above, fire suppression

system cylinder skids and enclosures, etc.

4. ASSEMBLY

The workshop facility is where assembly of all fire protection equipment in skid

mounted or in enclosures as per the client’s needs, is carried out. The skids and

enclosures will be completely fit out with the cylinders, manifolds and electrical

cabling and terminations. After assembly, it will be ready for hooking up to the site

pipework.

5. QA/QC, TESTING and INSPECTION

As an ISO certified company, Tyco has its own testing and inspection requirements

laid out for all the items produced in this workshop facility. A dedicated QA/QC

Engineer ensures all the requirements of the QA/QC procedures are met with before

any material/equipment enters or leaves the facility.

A properly maintained system of documentation for all these activities is the

evidence of this compliance.

Tyco’s workshop has all the facilities for tests and inspections to be carried out on

the fire protection equipment, skids, enclosures and pipework. Pressure tests, weld

tests, load tests, etc. are carried out.

Also, Tyco will offer all these materials to third party inspection agencies and to

client’s and his representative as required.

(20)

6. MANPOWER

The workshop facility has well-experienced men of all required categories at all

times. Qualified welders, fitters, electricians, special technicians, painters and labors

are involved under the supervision of dedicated workshop supervisors and the

Construction Manager.

Tyco has all the facilities and access to increase the manning levels than the

average at any point to rise to the occasion.

7. WORKSHOP SITE FACILITIES

The Tyco workshop is a well-planned facility with the following :

x

Entrance, exit, goods loading and unloading areas, parking areas and

walkways

x

Dining and toilet facilities for the labors

x

Prayer

hall

x

Fire Fighting equipment

x

First Aid equipment

x

Plant movement vehicles

(21)
(22)

QUALITY ASSURANCE

1. QUALITY

PLAN:

tyco

Fire & Security

have a quality plan that establishes and

describes the Management commitment and the Quality System Procedures

followed in Design, Procurement, Installation, Testing and Commissioning of

Fire Detection and Protection Systems by Tyco Fire & Security .

2. QUALITY

ASSURANCE:

Wormald Ansul operates a final Quality system that is ISO 9001 approved.

Wormald products have world -wide approval to the following standards:-

ƒ

NFPA, Underwrites Laboratory, Factory Mutual.

ƒ

American Petroleum Institute

ƒ

American Bureau of Shipping

ƒ

U.S. Cost Guard

ƒ

LPCB, BSI, QUASCO, BNFL, MOD

ƒ

Lloyds Register of Shipping

ƒ

U.K. Department of Transport

ƒ

Det Norske Veritas

ƒ

Germanisher

Lloyds

(23)
(24)
(25)
(26)

HEALTH, SAFETY and

ENVIRONMENT

(27)
(28)
(29)
(30)

PROJECTS REFERENCE

LIST

(31)

USD

D

HS

BECHTEL

ASAB GAS DEVELOPMENT (AGD) PHASE II

GASCO

INERGEN, DELUGE, CO2, VESDA, FIRE ALARM and FIRE & GAS SYSTEMS DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 10.7 MILLION DHS 39.4 MILLION 2007 CAE

NON PROCESS BUILDING - HABSHAN

G

ASCO

FIRE & GAS and PUBLIC ADDRESS

SYSTEMS

DESIGN, SUPPLY and COMMISSIONING

OIL & GAS

ABU DHABI

U

SD 1.2 MILLION

DHS 4.6 MILLION

2007

DODSAL ABU DHABI

RAS LAFFAN COMMON COOKING SEA

WATER SYSTEM

QATAR PETROLEUM

FIRE & GAS DETECTION SYSTEM

SUPPLY, INSTALLATION and

COMMISSIONING

OIL & GAS

Q ATAR USD 1.1 MILLION DHS 4.2 MILLION 2007 FERTIL

REVAMPING OF FIRE DETECTION and

ALARM SYSTEMS

FERTIL

FIRE DETECTION and ALARM SYSTEMS

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 898,000.00 DHS 3.3 MILLION 2007 NPCC

F & G 2nd Loop - OGD III - NPCC

NPCC

FIRE & GAS DETECTION SYSTEM

SUPPLY, INSTALLATION and

COMMISSIONING

OIL & GAS

ABU DHABI U SD 125,000.00 DHS 460,000.00 2007 GASCO

FOAM SKID - ASAB AGD I

G

ASCO

FOAM SKIDS

DISMANTLING EXISTING

FOAM SKID AND INSTALLING NEW FABRICATED FOAM

SKID

OIL & GAS

ABU DHABI

U

SD 105,000.00

DHS 386,000.00

2007

ABU DHABI J&P LLC

OGD III SP6 PROCESS BUILDINGS

GASCO

INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 3.7 MILLION DHS 13.7 MILLION 2006 DODSAL PTE LTD.

IRP - ADR MAQTA, RUWAIS, MUSSAFAH

TAKREER

FIRE & GAS DETECTION SYSTEM

DESIGN, ENGINEERING, MANUFACTURE, TEST,

SUPERVISION OF

INSTALLATION, TESTING and

COMMISSIONING

OIL & GAS

ABU DHABI U SD 1.3 MILLION DHS 5 MILLION 2006 DODSAL PTE LTD.

TAKREER IRP Inergen

TAKREER

INERGEN SYSTEM

DESIGN, SUPPLY and COMMISSIONING

OIL & GAS

ABU DHABI U SD 1.2 MILLION DHS 4.5 MILLION 2006 DODSAL TAKREER IRP TAKREER

DELUGE and FOAM SYSTEMS

D

ESIGN and SUPPLY

O IL & GAS ABU DHABI U SD 924,000.00 DHS 3.4 MILLION 2006 DODSAL

TAKREER IRP - PORTABLE MOBILE

TAKREER

PORTABLE AND MOBILE FIRE FIGHTING

EQUIPMENTS SUPPLY O IL & GAS ABU DHABI U SD 326,000.00 DHS 1.2 MILLION 2006 DODSAL TAKREER IRP TAKREER FIRE HYDRANTS

DESIGN and SUPPLY

O IL & GAS ABU DHABI U SD 195,000.00 DHS 717,000.00 2006 YEAR

MAJOR PROJECTS - OIL & GAS

CLIENT PROJECT E ND-USER S YSTEM DESCRIPTION S COPE of WORK SECTOR LOCATION VALUE Page 1 of 4

(32)

USD

D

HS

YEAR

MAJOR PROJECTS - OIL & GAS

CLIENT PROJECT E ND-USER S YSTEM DESCRIPTION S COPE of WORK SECTOR LOCATION VALUE DODSAL

INTER-REFINERY PIPELINE PROJECT

TAKREER

INERGEN and FIRE ALARM SYSTEMS

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 1.2 MILLION DHS 4.5 MILLION 2006 NPCC NPCC - OGD III TAKREER

FIRE & GAS, PUBLIC ADDRESS and TELECOM SYSTEMS, WATERSPRAY, TELECOM, INERGEN, VESDA and FIRE

DETECTION SYSTEMS

DESIGN, SUPPLY and COMMISSIONING

OIL & GAS

ABU DHABI

U

SD 788,000.00

DHS 2.9 MILLION

2006

QATAR FUEL (WOQOD)

REPLACEMENT/UPDATE OF FIXED FF

SYSTEMS PHASE II

QATAR FUEL (WOQOD)

FIXED FIRE FIGHTING EQUIPMENT

REPLACEMENT/UPDATE OF FIXED FF SYSTEMS PHASE II

OIL & GAS

Q

ATAR

USD 60,000.00

DHS 2.2 MILLION

2006

BELLELI ENERGY S.P.A.

TAKREER IRP - FF EQUIPMENTS

TAKREER

FIRE FIGHTING EQUIPMENTS

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI

U

SD 326,000.00

DHS 1.2 MILLION

2006

DUBAI PETROLEUM COMPANY

D

PC

DUBAI PETROLEUM COMPANY

SECURITY ACCESS CONTROL SYSTEMS

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

D

UBAI

USD 300,000.00

DHS 1.1 MILLION

2006

TAISEI CORPORATION - JAPAN

DOLPHIN - RAS LAFFAN PLANT -

UPSTREAM FACILITIES

DOLPHIN ENERGY

INERGEN, CO2, SPRINKLER, HOSE REELS

and PORTABLE EXTINGUISHERS

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

Q ATAR USD 830,000.00 DHS 3 MILLION 2005 ZUBLIN

GASCO POWER INTERCONNECTION

SUBSTATION NO. 9

GASCO

FIRE & GAS DETECTION and

INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI

U

SD 540,000.00

DHS 2 MILLION

2005

DUBAI PETROLEUM COMPANY

D

PC HALON REPLACEMENT PHASE 1

D

UBAI PETROLEUM COMPANY

N

OVEC FIRE SUPPRESSION SYSTEM

DESIGN, SUPPLY and

INSTALLATION

OIL & GAS

D UBAI USD 490,000.00 DHS 1.8 MILLION 2005 ALSTOM G UP RUWAIS GASCO PAVA SYSTEM

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 326,000.00 DHS 1.2 MILLION 2005 SNAMPROGETTI

ADCO BUHASA FACILITIES UPGRADE

ADCO

FIRE & GAS DETECTION - ADCO

DESIGN, SUPPLY and COMMISSIONING

OIL & GAS

ABU DHABI

U

SD 271,740.00

DHS 1 MILLION

2005

AL JABER ENERGY SERVICES

TAWEELAH RECEIVING FACILITY

GASCO / DOLPHIN

FIRE & GAS DETECTION & ALARM SYSTEMS and INERGEN SYSTEMS DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 245,000.00 DHS 900,000.00 2005 BUNDUQ HALON REPLACEMENT BUNDUQ INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 1.4 MILLION DHS 5 MILLION 2002/2005 Page 2 of 4

(33)

USD

D

HS

YEAR

MAJOR PROJECTS - OIL & GAS

CLIENT PROJECT E ND-USER S YSTEM DESCRIPTION S COPE of WORK SECTOR LOCATION VALUE ZADCO

HALON REPLACEMENT - PHASE 1

(ZIRKU/ARZANAH) and PHASE 2 (UMM AL

DALKH/SATAH)

ZADCO

EPC CONTRACT for ONSHORE and

OFFSHORE FACILITIES

DESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING

OIL & GAS

ABU DHABI U SD 3.26 MILLION DHS 12 MILLION 2001 - 2004 TAKREER

ULG / LGSO SUB-STATIONS

TAKREER

INERGEN and FIRE FIGHTING EQUIPMENT

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 1.1 MILLION DHS 4.2 MILLION 2004 FERTIL

HALON REPLACEMENT AT SUB-STATIONS

FERTIL

INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING

OIL & GAS

ABU DHABI

U

SD 720,000.00

DHS 2.65 MILLION

2004

GULF PIPING COMPANY

QPD OFFSHORE FIELD DEVELOPMENT -

OFFSHORE PLATFORMS

QATAR PETROLEUM

FOAM DELUGE, FM200, WATERSPRAY DELUGE and TWIN AGENT SYSTEMS DESIGN, SUPPLY and COMMISSIONING

OIL & GAS

Q

ATAR

USD 500,000.00

DHS 1.8 MILLION

2004

TOTAL FINA ELF

TABK HALON REPLACEMENT

TOTAL ABU AL BUKHOOSH

H

ALON REPLACEMENT

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 407,600.00 DHS 1.5 MILLION 2004 NPCC UMM AL NAR TAKREER

FIRE & GAS DETECTION

DESIGN, SUPPLY and COMMISSIONING

OIL & GAS

ABU DHABI

U

SD 300,000.00

DHS 1.1 MILLION

2004

TOTAL ABU AL BUKHOOSH

TOTAL ABU AL BUKHOOSH PLATFORMS

TOTAL ABU AL BUKHOOSH

INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 1.08 MILLION DHS 4 MILLION 2003 GASCO N EW ADMINISTRATION BUILDING GASCO INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 407,000.00 DHS 1.5 MILLION 2003 ZADCO U

MM AL DALKH PLATFORMS PU15/16

ZADCO

FIRE & GAS SYSTEMS

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 271,740.00 DHS 1 MILLION 2002 GASCO BUHASA-HALON REPLACEMENT GASCO INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING

OIL & GAS

ABU DHABI U SD 735,000.00 DHS 2.7 MILLION 2001 ADNOC

RUWAIS REFINERY and UMM AL NAR

DETECTION UPGRADE

TAKREER

EPC CONTRACT for the REVAMPING of FIRE

DETECTION SYSTEM

DESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING

OIL & GAS

ABU DHABI U SD 3.26 MILLION DHS 12 MILLION 2000 ADNOC R

UWAIS GUP FACILITIES

TAKREER

COMPLETE FIRE FIGHTING SYSTEM

DESIGN, SUPPLY and

INSTALL

OIL & GAS

ABU DHABI U SD 2 MILLION DHS 7.5 MILLION 2000 ADMA-OPCO H Q BUILDING ADMA-OPCO

SPRINKLER and INERGEN SYSTEMS

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 271,740.00 DHS 1 MILLION 2000 ADNOC R

UWAIS REFINERY GUP EXPANSION

ADNOC

FIRE DETECTION SYSTEM

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 271,740.00 DHS 1 MILLION 2000 GASCO H ALON REPLACEMENT GASCO INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 407,600.00 DHS 1.5 MILLION 1999 / 2000 Page 3 of 4

(34)

USD

D

HS

YEAR

MAJOR PROJECTS - OIL & GAS

CLIENT PROJECT E ND-USER S YSTEM DESCRIPTION S COPE of WORK SECTOR LOCATION VALUE

NATIONAL DRILLING COMPANY

N

EW HEADQUARTERS BUILDING

NATIONAL DRILLING

COMPANY

INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 1.7 MILLION DHS 6.4 MILLION 1998 / 1999 ADNOC

ONSHORE GAS DEVELOPMENT (OGD)

PROJECT PHASE II

ADNOC

INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING

OIL & GAS

ABU DHABI U SD 1.3 MILLION DHS 5 MILLION 1999 C.C.C.

RUWAIS REFINERY EXPANSION - SUBSTATIONS and SATELLITES

TAKREER

INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING

OIL & GAS

ABU DHABI D HS 1.7 MILLION DHS 6.3 MILLION 1998 ADGAS H Q BUILDING ADGAS

SPRINKLER and INERGEN SYSTEMS

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 543,000.00 DHS 2 MILLION 1998 KHANSAHEB JETTY EXPANSION ADGAS

HIGH EXPANSION FOAM SYSTEM

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 271,740.00 DHS 1 MILLION 1998 ADNOC H

ABSHAN CONTROL ROOM

GASCO

INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 540,000.00 DHS 2 MILLION 1995 / 1996 ADNOC R

UWAIS SULPHUR PROJECT

TAKREER

INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 540,000.00 DHS 2 MILLION 1996 ZADCO / GASCO N EW HEADQUARTERS BUILDING ZADCO / GASCO INERGEN SYSTEM

DESIGN, SUPPLY, INSTALL and COMMISSIONING

OIL & GAS

ABU DHABI U SD 300,000.00 DHS 1.1 MILLION 1996 Page 4 of 4

References

Related documents

Since gas detection instruments and systems are products of safety technology for industrial applications they need to comply not only with statutory requirements (e.g.

physical access control and monitoring system, intrusion detection and alarm system, fire detection and suppression system, uninterrupted power supply, heating / ventilation /

Using psm2200, you integrate and control func- tions such as primion access control, intrusion and fire detection systems, digital, analogue and IP video systems, emergency

It consist of intrusion detection sensors, (pressure, Smoke/Fire, Gas and PIR motion), wireless sensors, programmable microcontroller in embedded C language, regulated power

including intrusion detection, access control, video surveillance, monitoring solutions, fire & life safety and energy management solutions, we are well- positioned to meet

Power protection is needed wherever there are cameras, video recording devices, access control systems, fire alarms, intrusion detection devices, emergency communications

Control Center Intrusion Detection Access Control Perimeter Surveillance CCTV Surveillance Video Analytics Module System Manager Video Display Module Media Server TSM Control

M u lt ip le s u b -s ys te m s Emergency call systems Evacuation Mass notification Smoke and fire detection Evacuation Extinguishing Access control Gate control Perimeter