• No results found

Infrastructures and Transport

N/A
N/A
Protected

Academic year: 2021

Share "Infrastructures and Transport"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

www.sener-group.com

Infrastructures

and Transport

Infrastructures & Transport

Global Presence

Awards and Recognitions

SENER Offices

Infrastructures & Transport Main Projects San Francisco, USA

Los Angeles, USA

PANAMA USA

MEXICO

Mexico City, MEXICO

Abu Dhabi, UAE

Okayama, JAPAN Busan, SOUTH KOREA Warsaw,

POLAND

EGYPT

BRAZIL

São Paulo, BRAZIL

Buenos Aires, ARGENTINA Lisbon, PORTUGAL Bilbao, SPAIN Barcelona, SPAIN Madrid, SPAIN Manchester, UK Algiers, ALGERIA ALGERIA INDIA Doha, QATAR QATAR SAUDI ARABIA KUWAIT Shanghai, CHINA PHILIPPINES TAIWAN New Delhi, Bangalore, INDIA INDIA OMAN UAE

Rio de Janeiro, BRAZIL

Santiago de Chile, CHILE Bogota, COLOMBIA COLOMBIA DENMARK PORTUGAL POLAND NORWAY MOROCCO EQUATORIAL GUINEA COSTA RICA

www.sener-infrastructures-transport.com

[email protected]

2013 European Energy Awards 2012 Potencia Award. Tunnels Category 2012 European Business Award for Innovation The Fleming Award 2014. Finalist Junio 2 015 - SR/ S C / P U - 0 3 8 E d/R v: 1/0

AF FOLLETO SENER INFRAESTRUCTURAS_TRANSP.2015.indd 2-3

(2)

SENER Group

Infrastructures and Transport

SENER Strategy

A global multidisciplinary Engineering and

Technology Group, developing excellent

projects & innovative solutions for public

and private clients across four continents.

“SENER’s corporate

culture of excellence:

Innovation, Quality &

Independence”

GAS TURBINES

ENERGY & ENVIRONMENT ENGINEERING & CONSTRUCTION

SENER ENGINEERING AND SYSTEMS

• Oil and Gas • LNG

• Solar • Power

• Space • Defense • Aeronautics & Vehicles Infrastructures & Transport Aeroespace Power & Process

Marine • FORAN System • Marine Engineering Urban Transport Roads Railways

Airports Water and

Environment

Ports and Coasts Architecture TORRESOL ENERGYO EE

CONCENTRATED SOLAR POWER

GEMASOLAR ARCOSOL (Valle 1) TERMESOL (Valle 2) RRFFF R R

BIOMASS AND USED OIL REREFINING

ZABALGARBI

AERONAUTICS

•Turbines engineering and technology

• Manufacturing of components and module integration

• In Service Support

MARKETS

• Large civil aircraft • Defense • Industrial turbines • Small civil aircraft • Helicopters

ITP

Industria de Turbopropulsores

MUNICIPAL WASTE TO ENERGY

More than

10,000

of Rail

projects

Km

60

years of

Experience

Key Facts

Roads

Railways

Ports

Water &

Environment

Urban

Transport

Airports

Architecture

Urban Transport

Systems

70

1.3

Over

billion €

turnover / year

INTERNATIONALIZATION

INNOVATION

INVESTMENT

3i

Workforce of

6,000

professionals

SENER’s

3i

strategy

is based on three

key pillars: Innovation, Internationalization

& Investment being Innovation the main

one for facilitating the other two.

AF FOLLETO SENER INFRAESTRUCTURAS_TRANSP.2015.indd 4-5

(3)

• Functional and Conceptual Design • Master Plans

• Pre-feasibility and Feasibility Studies • Transport Planning

1. Planning Stage

SOME EXAMPLES:

• Bogota Metro Line 1 (Colombia)

• Shivaji-Nagar and Bijwasan Railway Stations (India) • Basque Country Early Flood

Prevention System (Spain)

IN

TE

GR

AL

TECH

NO

LO

G

IC

A

L

V

IS

IO

N

IN ALL

DIFFERENT

CONSTRUCTION

AND FINANCING

SCHEMES

D&B

EPC

PPP

DBOT

BOT

• Operation and Maintenance Plan • Recruitment and Training • Operation and Maintenance Support • Cost Optimization

4. Operation and

Maintenance Stage

SOME EXAMPLES:

• Barcelona Metro Line 9 (Spain)

• ABHS Adolfo Suarez Madrid - Barajas Int. Airport (Spain) • Porto LRT (Portugal)

• Preliminary and Detailed Engineering • Value Engineering

• Schedule and Cost Estimation • Execution Design

• Systems Integration

2. Design Stage

SOME EXAMPLES:

• Panama Metro Line 1 (Panama)

• Highway A-1 (Poland) • California High Speed

Railway (USA)

• Tender Documents and Evaluation • Site Supervision and Quality Control • Construction Management

• Testing and Commissioning

3. Construction Stage

SOME EXAMPLES:

• Transmontana Highway (Portugal)

• Mexico Central Hospital (Mexico)

• Palma de Mallorca Int. Airport (Spain)

ALL STAGES

SOME EXAMPLES:

• Riyadh Metro (Saudi Arabia)

• High Speed Line Spain-France, section Figueras-Perpignan (Spain/France) • Southern Metropolitan Bypass (Spain) • LNG GATE Terminal (The Netherlands)

• Risk Management

• Interface Management

• RAMS - Reliability, Availability

and Maintainability

• Independent Checker Engineering

• Project Management Consultancy

Services

• Documents and Data

Management

• Quality Assurance and

Quality Control

• Environmental and

Sustainability

P

L

A

N

N

IN

G

S

TA

G

E

DE

SIG

N S

TAG

E

CONSTR

UCT

ION

ST

AG

E

O

P

ER

AT

IO

N

&

M

A

IN

T

E

N

A

N

C

E

S

T

A

G

E

SENER off ers

all range of services

needed to complete a project from the

initial

phases to operation

and under many diff erent fi nancing and construction

schemes, with a clear tendency to

share the risks

with our clients.

AF FOLLETO SENER INFRAESTRUCTURAS_TRANSP.2015.indd 6-7

(4)

• Transportation and traffi c

• Tunnels safety and technical installations • Intelligent Transport Systems (ITS) and

communications • Toll areas and systems

• Geology, geotechnics and earthworks • Drainage and hydrology

• Environment & landscaping

• Hydrology, Flood Protection and Flood Control

• Intake Structures/Pipelines/Pumping Stations (Water Supply/Sewage/Cooling Water Systems)

• Irrigation, Canals, Ponds and Distribution Systems • Water Treatment

• Submarine Intake/Outfalls and Oil&Gas Pipelines • Dams, Locks, Spillways, Gates, Outlet Systems and

Hydropower Systems

• Port and Waterways

• Marine dynamics, numerical and physical modelling • Marine structures and equipment

• Marinas and Fishing ports • Waterways

• Oil & Gas and Bulk Terminals • Cruises and Container Terminals • Ro-ro Terminals

• Shipyards

• Logistic Zones and Inland Ports • Coastal Works

• Stations & Depots • Terminals

• Iconic Buildings • Urban Planning • Landscape • Smart Cities

• Master Planning and Operational Studies • Airfi elds (Apron, Taxiway and Runway) • Control Tower

• Terminals (Passenger and Cargo) • Heliports, Hangars and other Facilities • Terminal and Runway Systems • Boarding Bridges

• Automated Baggage handling Systems • Airport Security

• Flight operation Engineering • Air Navigation Systems • Airport Systems

Roads

Ports and Logistics

Water &

Environment

Architecture

Airports

Systems Integration

Alicante Port (Spain)

HSL Freight Mainline Metro LRT Monorail BRT

Bilbao Airport (Spain)

International HSL Figueras - Perpignan © TP Ferro Concesionaria © F. Hédélin 2012

Porto LRT (Portugal) Transmontana Highway (Portugal) Lekubaso Dam (Spain)

Highway Durango - Mazatlan (Mexico)

Costa Cruceros Cruise Terminal (Spain) Fontenova Stadium (Brazil)

Bilbao Southern Metropolitan Bypass (Spain) Los Angeles Union Station (USA)

Shivaji-Nagar Pune Railway Station (India) Bilbao Metro Sarriko Station (Spain)

Tenerife North Airport Terminal (Spain)

• Communication Systems • Signaling and Train Control • Power Supply

• Electromechanical Equipment • Ticketing and Passenger

Information Systems • Rolling Stock

• Traffi c Control Systems • Operation Control Centres • Urban Integration

• Bridges and Structures • Tunnelling

• Track • Civil Work

Rail

SENER applies this overarching disci-pline, providing trade-off analysis and integration between all components of rail and road projects, enhancing re-sults in terms of client needs, optimized design, cost, schedule, performance and interaction between all disciplines.

Diff erent Modes

AF FOLLETO SENER INFRAESTRUCTURAS_TRANSP.2015.indd 8-11

(5)

Other Projects

Panama Metro Station (Panama)

Guadalajara Metro (Mexico) Malaga International Airport Terminal (Spain)

Regional Railway Valle de Mexico - Toluca (Mexico)

Mexico Central hospital (Mexico) BBVA Headquarters (Spain)

Building

Information

Modeling (BIM)

SENER is a leader in the implementation of BIM technologies for infrastructure & transport projects.

SENER works with the newest technologies such as BIM to improve quality, cost and relationships with clients in all projects.

Through BIM, SENER foresees future in the present.

Riyadh Metro (Saudi Arabia) SENER Premises (Spain)

Sol - Gran Via Station (Spain) Follo Railway Line (Norway)

Arakil River Flood Prevention (Spain)

GATE LNG Terminal (The Netherlands) Southern Metropolitan Bypass (Spain)

AF FOLLETO SENER INFRAESTRUCTURAS_TRANSP.2015.indd 12-13

References

Related documents

tropical biodiversity monitoring programs that not only collect critical conservation ecology data, but also provide environmental education and public outreach, train local people

choice of ridge parameter, 14–16 feasible generalized, 16 generalized, 15 minimization formulation, 15 nonlinear regression, 26 reduced-rank data, 16 shrinkage estimation, 13

Total Revenue (2007) Percentage to Transportation Last Changed Gasoline: 16 Diesel: 8 $986,067,000 Gasoline: 1975 Diesel: 1994 Toll Fees Miles of State Toll Roads. Number of State

Through an ethnographic study of the regulated activities of chemicals service companies supporting the upstream petroleum industry, we assess how actors evaluate and justify

This Administrative Application, sometimes referred to as Policy Administration Point or PAP, will be used to configure, specifiy, store and test XACML policies, Under Web Server

Migrating eScience Applications to the Cloud: Methodology and Evaluation 25 data store or service, and refactoring support during the actual migration of the data. Users of the tool

To evaluate the proposed control strategies in terms that are mean- ingful for cable-stayed bridges, appropriate evaluation criteria and control design constraints are specified