21
0
0

Loading.... (view fulltext now)

Full text

(1)
(2)

Updated Economic Issues List

2

Issue Id

Constraint Name

Contingency

M-1 Frederick Town AECI - Frederick Town AMMO 161 kV Line Lutesville - St Francois 345kV Line S-2 North East - Charlotte 161 kV Line Iatan – Stranger 345 kV Line S-3 Logan - SW Minot 115 kV Line Blaisedell 230/115 kV Transformer S-4 North Platt - Stockville 115 kV Line Gentleman - Red Willow 230 kV Line M-5 Blue Earth - Winnebago 161kV Line Lakefield Junction - Lakefield 345kV Line M-6 Wapello 161/69 kV Transformer T1 Wapello 161/69 kV Transformer T2 S-7 Collins - Stockton 161 kV Line Neosho – La Cygne 345kV Line M-9 Prairie 345/230kV Transformer T2 Prairie 345/230kV Transformer T1 M-10 Swartz - Alto 115kV Line Baxter Wilson - Perryville 500 kV Line M-11 Reed - Dumas 115kV Line Sterlington - El Dorado 500kV Line S-12 Essex - Idalia 161 kV Line Essex - New Madrid 345 kV Line M-13 Grimes – Mt Zion 138 kV Line Grimes – Ponderosa 230 kV Line S-14 South Shreveport – Wall Lake 138 kV Line Dolet Hills 345/230 kV Transformer

(3)

Screening Process

SPP performed initial evaluation for projects

addressing SPP issues

MISO performed initial evaluation for projects

addressing MISO issues

Projects addressing multiple issues were

evaluated by the RTO which has the highest

ranked issue being addressed by the project

(4)

Screening Criteria

Screening Index (SI):

One year benefit / (estimated cost in 2024 dollars*

Annual fixed charge rate)

Screening Index of at least .5

Benefits and cost calculated for 2024

Proposed solution benefits = SPP Benefit + MISO

Benefit

IS included as a part of SPP

(5)

Updates to Issues List

5

Logan-SW Minot FLO Blaidsdell transformer

Logan-SW Minot reconductor

North Platt-Stockville FLO Gentlemen-Red

Willow

Gentlemen-Red Willow rating decrease removed

this need

Collins-Stockton FLO Neosho-Lacygne

Collins-Stockton rating increase significantly

lowered needs congestion

(6)

Updates to Issues List

6

Blue Earth - Winnebago 161 kV constraint

This constraint was binding significantly due to

incorrect modeling of a Special Protection Scheme

(SPS) in PROMOD

Congestion reduced significantly

Wapello-Ottumwa 161 kV Ckt 2 constraint

Rating increase relived congestion on this

constraint

Congestion shifted to Wapello 161/69 kV

Transformer & Jeff – Wapello 161 kV

(7)
(8)

Potential Seams Projects Passing

Screening

8

Projects

Needs Addressed

New 28 mile Dolet Hills-Messick

345kv line, new 500/345kV

transformer at Messick

S Shreve Port-Wallace Lake 138kV

FLO Dolet Hills 345/230kV

transformer

New 100 mile Elm Creek-Mark

Moore 345kV line

North East-Charlotte 161kV FLO

Iatan-Stranger 345kV

Replacing 30MVA 161/69kV

transformer at Huntley/Winnebago

with a 75MVA transformer

North East-Charlotte 161kV FLO

Iatan-Stranger 345kV

North East-Charlotte 161kV 2

nd

Ckt

North East-Charlotte 161kV FLO

(9)

Dolet Hills-Messick 345kV Line

9

Total Cost:

$52M

Screening Index:

0.63

Total APC

Benefit: $5.5M

MISO % Total

APC Benefit: 90%

SPP % Total APC

Benefit: 10%

(10)

Elm Creek-Moore 345kV Line

10

Total Cost:

$142.7M

Screening Index:

0.74

Total APC

Benefit: $17.9M

MISO % Total

APC Benefit: 15%

SPP % Total APC

Benefit: 85%

(11)

Huntley-Winnebago Transformer

11

Total Cost:

$3.8M

Screening Index:

1.57

Total APC

Benefit: $1M

MISO % Total

APC Benefit: 72%

SPP % Total APC

Benefit: 27%

(12)

North East-Charlotte 2

nd

Ckt 161kV

12

Total Cost:

$24M

Screening Index:

1.75

Total APC

Benefit: $14M

MISO % Total

APC Benefit: 52%

SPP % Total APC

Benefit: 48%

(13)

Additional Projects

These projects pass the Screening Index but

provide minimal benefits (between 1 and 5%)

to one RTO

Projects could increase when evaluated over 20

years

For a project to qualify for interregional cost

allocation each RTO must receive at least 5%

of benefits

(14)

Projects

Needs Addressed

345 kV switching station where the parallel circuit from

Gentleman seperates and construct a 345 kV line from

new switching station Axtel

Mark Moore to Elm Creek 345kV

Elm Creek to Moore 345 kV

Replace current 30 MVA 161/69 kV transformer at

Huntley/Winnebago with 75 MVA unit

Rebuild the South Shreveport to Wallace Lake 138 kV

line with 1533.3 ACSR/TW

Rebuild Stranger - Iatan 161 kV at 345 kV

161 kV line from Neast to Montreal

2nd 161 kV line from Neast to Charlot

345kV line from Wolcott to Iatan with 345/161kV

Wolcott transformer

345 kV circuit from Dolet HIlls to Messick and a new

500/345 kV transformer at the Messick Substation.

Rebuild South Shreveport-Wallace Lake 138 kV line to

246/246 MVA

Additional Projects

North Platt - Stockville

115 kV FLO Gentleman -

Redwillow 345 kV

North East-Charlotte

161kV FLO

Iatan-Stranger 345kV

S Shreve Port-Wallace

Lake 138kV FLO Dolet

Hills 345/230kV

transformer

(15)
(16)

Solution Ideas Screening – Phase I

16

MISO Annual Fixed Charge rate of 17.9%

Project in-service date was assumed to be 2024

Issue

ID

Issue Description

Solution Idea

Screening

Index

Estimated

Cost

(M$ - 2015)

M-10

Swartz - Alto 115 kV

FLO

Baxter Wilson - Perryville 500 kV

Alto Series reactor

2.46

10.4

M-13

Grimes - Mt Zion 138 kV

FLO

Grimes - Ponderosa 230 kV

New Walker Tap-Rivtrin 138 kV line

0.59

47.5

M-1

Frederick Town AECI - Frederick Town AMMO 161 kV

FLO

Lutesville - St Francis 345 kV

New St Francois - Fletcher 345 kV

line

0.53

107.9

New St Francois - Fletcher - Taum

(17)

Alto Series Reactor

Project Details

Addition of a series

reactor on the Swartz –

Alto 115kV line at the

Alto 115kV Substation

Location

- Louisiana

This project does not fully

relive the congestion on

the Swartz – Alto (M-10)

constraint

Reduces the congestion

by 90%

(18)

Walker Tap - Rivtrin 138 kV line

Project Details

Tap the existing Grimes –

Crockett 345kV line at Walker

Tap

Build 345/138kV transformer

and build 11 miles of 138kV

line from Walker Tap to

Rivtrin

Location

- Texas

This project completely relieves

the Grimes - Mt Zion 138 kV

(M-13) constraint

(19)

St Francois - Fletcher 345 kV Line

19

Project Details

Build 50 miles of 345kV line

from St. Francois to Fletcher

Location

– Missouri

This project does not fully relive

the Frederick Town AECI -

Frederick Town AMMO 161 kV

constraint

It reduces the congestion by

75 %

Increases Congestion on the

New Madrid 345/161kV

Transformer T2

(20)

St Francois - Taum Sauk - Fletcher 345 kV

Line

Project Details

55 miles of 345kV line from

Fletcher to new substation

close to Taum Sauk and then

to St. Francois

2-345/138kv transformers to

tie in 138kV lines from Taum

Sauk

Location

– Missouri

This project does not fully relive

the Frederick Town AECI -

Frederick Town AMMO 161 kV

constraint

It reduces the congestion by

71 %

Increases Congestion on the

New Madrid 345/161kV

Transformer T2

(21)

Contact Info

SPP

[email protected]

Brett Hooton: 501-688-1684

MISO

[email protected]

Jenell McKay: 504-846-7108

References

Related documents

These methods can be grouped into three categories: information exchange among students (mainly in oral or written form), using forbidden materials (cheat-sheets, books, etc.) and

As tecnologias de comunicação sem os utilizadas em grande escala nas WPANs não cum- prem uma série de regulamentações médicas nem cumprem, idealmente, requisitos ao nível do

Addressing complex co-occurring issues Ongoing Evaluation and Management Linkage to Services Screening Identification Brief treatment Addiction care Pharmacotherapy

Such software may control image data acquisition platforms, provide sophisticated data processing, analysis, and visualization functions, or may provide a library

TGFβ significantly increased the activity of the PMEPA1 promoter in the TGFβ responsive PC-3 (PCa), A549 (lung cancer) and HepG2 cells (hepatocarcinoma) (Fig 4C).. The

For all tests, the daily prices for the Jordanian indices (Bank Index, Service Index, Insurance Index, Industry Index and General Index) in Amman Stock Exchange were employed for

1999 Ariane V Scale Model Acoustic Test • Used MARTEL facility for subscale testing. – Cold and hot jets to simulate

Lone Star Transmission LS Power / Cross Texas Transmission LCRA South Texas Electric Coop Central Maine Power Company (CMP) Westar Energy Prairie Wind Transmission - Westar