LG Electronics
March, 2011
Technical Support Group, RHQ-MEA
Contents
Ⅰ. IT Trend Overview
Ⅱ. Network MNT idea
Ⅲ. Network MNT Solution
Ⅳ. Case Studies / Best Practices
Green and Innovative Solution
①
The Challenge We‟re hearing in Public Sector
Ⅰ
. IT Trend overview
Trend in Public sector is moving forward to Government Transformation through cost
effectiveness improvement and Carbon emission reduction.
Implications
Considering the Greening IT Infrastructurethat can be allowed to reduce the carbon impact of IT operations.
Considering the way of providing Digital Media content to improve User experiencewhile optimizing cost efficiency.
Considering the IT Architecture that enable to optimize IT Operation costsuch as Clouding computing and shared Service.
The Challenge We‟re hearing in Public Sector
Hype Cycle for Government Transformation *
*Source: „Hype Cycle for Government Transformation‟ Gartner 09
Public Service
Differentiation
Pressure
on IT Budget
Demanding of
e-Government
Reduction of
Carbon emission
1 / 20②
Key Consideration in Public Sectors is Green IT
Ⅰ
. IT Trend overview
Many governmental agencies have continued to implement standards and regulations that
encourage green computing.
Power Consumption in IT areas
“
Finally we sealed the deal. And it is a real deal. Bringing world leaders to the table paid off... We have the foundation for the first truly global agreement that will limit and reduce greenhouse gas emissions, support adaptation for the most vulnerable and launch a new era of green growth," . – Mr, Ban Ki-moon at conference, Copenhagen* Source : Oracle Research of Green IT Report
Printer 6% Lan 7% Fixed Line Telco 15% Mobile Telco 9% Servers 23% PC& Monitor 40%
Considerations of Green IT
Need to be measured the environmental impact of PCs power consumption and energy-efficient models -Organization with 5,000 PCs is producing PCs carbon
emissions by 1.7 million poundsevery year.
Need to change Personal IT Infra, instead of purchasing New PCs
-1.8 tons of raw materialsare used to manufacture the average desktop PC.
PC energy usage accounts for 40% of organizations‟ total IT device consumption
-Save PC power consumption between $20 and $60per PC annually by implementing PC Power management
Ⅱ
. Network Monitor idea
Office Environment
Library
Information desk
Conference room
3 / 20
Network MNT full Line-up would satisfy various IT usage requirement and Project
for worldwide sites
①
Solution Concept
Desktops are Now Mainframes 2-3 GHz multi-core
systems for <$700
Average:
1-5% utilization
PCs are overkill for many apps Software lags hardware Wasted capacity, wasted energy 4 / 20
System on Chip
The LG Monitors do not require on-board PC-based processors and chipsets.
All of the primary circuitry is integrated into a single chip that has an optimal set of resources for working with the terminal services software and extension protocols. This System-on-Chip (SoC) contains various patented
technologies for delivering unmatched performance from a low power device.
The LG System-on-Chip (SoC) is at the heart of each access terminal
①
Solution Concept
②
Product Line-up Overview
Network MNT full Line-up would satisfy various IT usage requirement and Project
for worldwide sites
D-Series (Direct Connect)
E-Series (Ethernet Connect)
Education (K-12)
Libraries
SMB / Education
Government
5 / 20
②
Product Line-up (D-Series)
LGE Network Monitor (D-series) enables 1 PC to drive up to 11 users.
D-Series (Direct Connect)
•
Share 1 PC with up to 11 users
•
High multimedia performance
•
All-in-one integrated design
•
Ideal for education and libraries
6 / 20
②
Product Line-up (D-Series)
LGE Network Monitor (D-series) has three components
7 / 20
②
Product Line-up (D-Series)
8 / 20
②
Product Line-up (E-Series)
LGE Network Monitor (E-series) enables 1 PC to drive up to 31 users.
E-Series (Ethernet Connect)
•
Share 1 PC with up to 31 users
•
Very good multimedia performance
•
All-in-one integrated design with
Ethernet-based connectivity (no distance limits)
•
Ideal for commercial, government, education
10 / 20
②
Product Line-up (E-Series)
11 / 20
• Share 1 PC with up to 15 users( Max31users )
• Very good multimedia performance
• All-in-one integrated design with
Ethernet- connection (No distance limits)
• Ideal for Commercial, Government, Edu
• Available September 2010
• Share 1 PC with up to 6 users (Max11 users)
• High multimedia performance
• All-in-one integrated design
• Ideal for Education and Libraries
• Available since September 2009
D-Series (Direct Connect)
through PCI card
E-Series (Ethernet Connect)
through Network
②
Product Line-up (D& E-Series summary)
Coming soon..
- Enterprise solution
VM-ware
Teradicci
LG
P series
Launch: Early 2012
②
Product Line-up ( P Series)
Hardware infra
Server Network Storage
Resource Management Authorization (Policy) Authentication (Security) Load Balancer Server SW module Zero client Virtual desktop (1:1)
…
SoC (Partnership) LGELGE Biz area
APP OS APP OS APP OS 1 Virtualization OS APP OS APP OS APP
Zero Client for Server clouding
P-Series (PC over IP)
•
LED Backlight
•
Ultra Secure
•
Flexible Zero Client Device
•
Eco-friendly green Computing
•
Ideal for Government, Healthcare, Enterprise
②
Product Line-up ( P Series: Enterprise Solution)
Cost Reduction
Improved Performance
Data safety &
Security
Centralized management
Instant on
Zero Clients offer „quick booting to reduce wait time‟
Reduced Noise
No Fan or hard drive means less noise
No „Maverick‟ software
Software is loaded and managed in the Datacenter.
Energy Savings
Zero Clients use an
average of 80% less energy
(avg. 15 watts vs. 170 watts)
Easy IT Management
Typically management & support accounts for more than 70% of ownership costs
Zero Clients last
longer
No moving parts (fan, hard drive) mean less maintenance issues – MTBF greater than 8 years
Zero Clients are less Expensive
Reduction in acquisition costs for computing devices
②
Product Line-up ( P Series: Enterprise Solution)
Description
Verticals
Enterprise
Desktop
Education
Call Center
Replace existing PC‟s with virtual desktops
supported from the datacenter. Minimize user
downtime and problems associated with data loss on local storage and ensure higher security.
Provide fully capable computing to students while limiting the support burden in managing many users potentially sharing common hardware. Limit downtime of OS and HW related failures.
Provide a low cost solution that leverages existing applications. All the benefits of terminal based solutions with all the flexibility of a traditional PC.
VMware View 4 w/ PCoIP Helps Grow the Market
Address customers who demand a better desktop experience than thin client computing
Servers delivers PCoIP enabled virtual desktops to many users - higher consolidation
Enable GPU accelerated 1:1 workstations/desktops to be part of a View Deployment
Outperforms other remote protocols
Large Market: VDI is growing beyond 3M seats a year; VMware is the market leader
②
Product Line-up ( P Series: Target Verticals)
LG Network MNT offers key benefits…
Efficiency and Cost Effectiveness
1
It‟s Economic
2
It‟s Green
3
It‟s Easy
•
Saving
- Initial acquisition Cost
- Maintenance Cost
•
Saving Energy
•Generating
- No Noise
- No Heat
•
To install and manage
Reduce H/W costs by 50%
(Or More)
Cut electricity use by 80%
Raise IT productivity
Expand computing access
Reduce work area clutter
Green computing,
Less Noise / Heat
Key benefits for IT
Key benefits for End-users
+
③
Solution Benefit (2)
Normal PC
LG Network Monitor Solution1. Cost savings : Operation
2. Power saving effect
Desktop PC
19”Wide
LCD
Monitor
19”Wide
LCD
Monitor
LG Network MNTA beneficial characteristic of Network MNT is optimizing operation Cost. In terms of TCO,
most of customers is achieving approximately
60 % reduction
of power consumption.
** Assumption: running 11 of PCS
③
Solution Benefit (2)
16 / 20
LG Network Monitor
Competitiveness
Type Network MNT
(Zero Client) Thin Client
Desktops (Thick Client)
Low purchase cost Only need to use Monitor
Electricity savings/Green LED panel support
Only needs to use Monitor
Ease of Install Only need to connect
to Server thru. Network
All-in-one solution Key board/ Mouse / Audio in &out
USB port etc
Simplified management & Security
No Hard disk, No CPU Managed by host server
Brand
High Medium Low
④
Competitive Dynamics
LGE Network Monitor has strong competitiveness over competitor in virtual computing market
17 / 20
Ⅳ
. Case Studies / Best Practices
Kyohak
Korea Army Training &
Doctrine Command
Hyundai Capital
Reading Rooms
19 / 20
Ⅳ
. Case Studies / Best Practices
Incheon Juag-ang High school
Chunju Secondary school
Busan ICT Secondary school
Iksan Secondary school
Seoul ICT Secondary school
Kunsan Secondary school
20 / 20
Netherland Primary School
Beijing tech school
Beijing Secondary school
Kangjou Secondary school
Shang Hai international school
Waltham Forest College
Barry Island Primary school
Before After
Alcantara school renewed old desktops in a professor room
Considering the next step for old PC‟s & CRT monitors in libraries and computer classrooms
Goal
Replace Old desktop PC with CRT monitors
Solution
Virtualized desktops with LG Network Monitors in a professor room
Alcantara school is one of the best private schools in Chile (K5 to K15)
There are 7 schools nationwide with the same classroom configuration including 1 computer class room, 1 professors‟ office and 1 library.
Results
Replace old IT solutions Green PC environment
reducing electricity and space Enhanced performance for faculty application
Centro Educativo los Andes
Centro Educativo los Andes improves an IT room with LG Network Monitors
Centro Educativo Los Andes is focused on basic and elementary education in Bogota City.
Goal
Expand old desktop PC and
CRT monitors with LG
Network Monitors
Solution
Virtualized desktops with LG
Network Monitors in an IT
room
Centro Educativo los Andes is one of the best private schools in Colombia (18 Network Monitors)
•The users think that the solution is magnificently fast, safe and easy to use.
•The end-user immediately noted power savings.
•The school is going to buy another 40 units.
Results
•
Replace old IT solutions
•
Enhanced performance for
student application
•
Trust in Network Monitor solution
•
Green PC environment
reducing electricity and space
Fundación Manos Providentes
Fundación Manos Providentes expand an IT room with LG Network Monitors
Foundation offers integral educational solution in order to solve violence, poor and marginalization. It‟s located in Cali City.
Goal
Solution
Virtualized desktops with LG
Network Monitors in a IT room
FUNDACIÓN MANOS PROVIDENTES rent IT room to SENA INSTITUTION (29 Network Monitors)
SENA is most important government entity dedicated to technical training in multiple careers. (4 million students in Colombia) SENA is the main user of this IT room.
SENA is going to buy another 8 units.
Results
Replace old IT solution
Trust in Network Monitor
Green PC environment
reducing electricity and space
Expand old desktop PC and
CRT monitors with LG Network
Monitors
Presidencia de la República
Presidencia de la República replaces an old solution with LG Network Monitors
Presidencia was the first government end-user.
Goal
Solution
Virtualized desktops with LG
Network Monitors in a IT room
Presidencia de la República de Colombia is one of the mail clients. (20 Network Monitors)
Presidencia reduced network infrastructure costs Saving in desktop computer acquisition costs
Results
Replace old IT solutions
Enhanced performance for
faculty application
Green PC environment
reducing electricity and
space
Replace old desktop PC and
CRT monitors with Network
Monitor solution
Harlandale
Texas School District Greatly Expands Computer Access with Network Monitors from LG
Harlandale is an urban school district with 14,000 students located in San Antonio, Texas. The district operates 22 facilities including schools, a center for handicapped students, and two alternative education centers.
Goal
Expand computing access while minimizing installation and support costs
Solution
Virtualized desktops with LG Network Monitors in classrooms, computer labs and libraries
Results
Expanded computer access 30 percent fewer support calls Lower electricity usage
Easy to install in older buildings Less clutter and wiring
Lower air conditioning usage
“Most of our students don’t have a computer at home, so providing
them access while in school is a high Priority. LG Network Monitors are the perfect way to expand computer access on a tight budget ” says Charles Hayden, Network Engineer for Harlandale.
Harlandale deployed LG Network Monitors in classrooms, computer labs and
libraries and is impressed with the results. With LG Network Monitors, Harlandale has:
• provided many computer stations per classroom with just one PC • increased computing access in libraries and computer labs
• reduced support calls by 30 percent (fewer PCs to manage) • lowered wiring and networking costs (just one network drop supports up to 11 computing stations)
Coalinga-Huron
California School District Improves eLearningOutcomes with Network Monitors from LG
Coalinga-Huron is a rural school district with 4,300 students located 70 miles southwest of Fresno, California.
Goal
Improve eLearning program outcomes by expanding computer access in a tight budget environment
Solution
Virtualized desktops with LG Network Monitors in computer labs
Results
Improved eLearning outcomes 85% reduction in hardware costs 90% lower electricity usage 70% lower support costs
“As a result of increased access to e-learning programs, we are seeing learning improvement throughout the district ”
Dr. Cecelia Greenberg-English Superintendent, Coalinga-Huron
Coalinga-Huron initially deployed LG Network Monitors at the
Huron Elementary School‟s three computing labs. Installation was quick and easy -- it only took a day to upgrade the labs
(instead of a week). For the students and teachers, the benefits
were clear and compelling.
• Students now had more computing access
• The labs were more conducive to teaching and learning because
fewer PCs meant quieter and cooler work space
• The students had a clutter-free work space and more “knee” space
Judson ISD
Judson School District Simplifies Student Computingwith LG Network Monitors
Judson ISD is a 21,000 student school district located in the outskirts of San Antonio, Texas.
Goal
Increase computer access to students throughout the campus while simplifying installation and support
Solution
LG Network Monitors connected to standard desktop PCs in classrooms, computer labs and libraries
Results
50% lower cost per station 30 minute install for 4 stations Reduced cabling and clutter 70% less electricity usage
“Using LG Network Monitors is by far one of the best decisions the District has made ” John Mueller, Librarian
Judson ISD has deployed LG Network Monitors in classrooms, computer labs and libraries. Based on their internal analysis, Judson has:
• Cut computer acquisition costs by at least 50 percent
• Improved IT staff productivity – each technician now supports 1,100
students (compared to 700 – 800 at most schools)
• Cut electricity costs by 70 percent (not including reduced air-conditioning)
• Reduced network infrastructure costs (only one network drop for up to 11 computing stations)
• Certified as a Green Computing District by CoSN (Consortium of School
Networking)
Birla Public School in Qatar
Ⅳ
. Case Studies / Best Practices
MEA Cases (1)
Universal American School
Department of Tourism, Dubai Gov
Single console for all users