Network Statement 2011 part 1, Annex 3.2, Planned major engineering works, edition

N/A
N/A
Protected

Academic year: 2021

Share "Network Statement 2011 part 1, Annex 3.2, Planned major engineering works, edition"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

from

to

Description

fr

om

to

Days of

the week

fr

om

to

Limit/speed reduction

Comments

Traffic/services interruption weekend v1136 F 20.00 - S 12.00 (40 hrs)

Relates to 1 points at Kringlan (Axmartavlan)

Work carried out with no power in overhead line Traffic interruption weekend v1139 Nm S 20.00 - 20.00 (24 hrs)

Relates to putting into service of Kringlan’s station.

During the weeks 1122-1123, speed is lowered to max 40/70 for 1600 metres. During the weeks 1123-1136, speed is lowered to max 70 for 250 metres.

During the weeks 1136-1139, speed is lowered to max 40 and 70 for 1600 metres. Minimum time at Hamrångefjärden will be 4 hrs and 20 min.

Train free times will be used during the night before S and M during Annual Timetable 2011. Note!

E 1136 1136 F-S 20:00 12:00 H Hfj Infsi 2/1 - Ax Infsi 3/2 In this PSB, the following object numbers 56748, 56702, 56697 and 56776 are included.

E 1137 1139 M-F 09:50 14:05 D Hfj Infsi 2/1 - Ax Infsi 3/2 The objects’ total requirements are 570 shifts, each lasting 6 hrs.

E 1139 1139 Nt S 20:00 20:00 H Hfj Infsi 2/1 - Ax Infsi 3/2

Construction of stations Tjärnvik and Jättendal. Minimum time in Gnarp will be approx. 5 hours.

Train free times will be used during the night before S and M during Annual Timetable 2011.

Traffic interruption weekend w1136

E 1124 1124 M-F 09:35 14:20 D Hkl infsi 4/1 -Åkg infsi 3/2 F 20.00 - Sa 16.00 (20 hrs)

PSB n

o

.

Li

ne

no.

Ob

ject n

o

.

T

racks

S in g le t rack ope ra ti on

Location

M-F

YearWeek

Time

H/ D 14:20 D 09:50 14:05

1 5 56786 (Hamrångefjärden) Preparatory and finsihing work for the

station Axmartavlan

E 1135 1136 D Hfj Infsi 2/1 - Ax Infsi 3/2

(Axmarby)

(2)

from

to

Description

fr

to

the week

fr

to

Limit/speed reduction

Comments

PSB n

Li

Ob

S ope

T

H/

E 1125 1125 M-Th 09:35 14:20 D Hkl infsi 4/1 -Åkg infsi 3/2 Relates to putting into operation the stations Jättendal and Tjärnvik

E 1126 1126 M-F 09:35 14:20 D Hkl infsi 4/1 -Åkg infsi 3/2 Work carried out with no power in overhead line

E 1134 1136 M-F 09:35 14:20 D Hkl infsi 4/1 -Åkg infsi 3/2

E 1136 1136 ntS 20:00 16:00 D Hkl infsi 4/1 -Åkg infsi 3/2 During the weeks 1122-1123, speed is lowered to max 40/70 for 1300 meter.

Points installation in Jättendal and Tjärnvik Interlocking systems in Id and Via

Replacement of interlocking installation in Id and Via Minimum time in Gnarp is approx. 5 hours.

Train free times will be used during the night before S and M during Annual Timetable 2011.

E 1121 1121 F-S 20:00 24:00:00 H Hfj Infsi 2/1 - Åkg Infsi 3/2 Traffic interruption weekend w1121

E 1122 1122 M-Tu 00:00 04:00 H Hfj Infsi 2/1 - Åkg Infsi 3/2 F 20.00 - Ti 04.00 (80 hrs)

Relates to replacement of interlocking installation in Id and Via and installation of points in Jättendal and Tjärnvik, and digging of new station Kringlan (Axmartavlan) including installation of points.

Work carried out with no power in overhead line.

3 9 54993 Krampen (Frövi) Track replacement E 1132 1142 M 08:00 16:00 D Skb Infsi 2/1 - Fv Msi 32, 62, 36 Remaining preliminary work, track change, ballast cleaning, neutralisation and subsequent grinding work with

grinding train.

E 1132 1142 Tu-F 10:00 18:00 D

E 1132 1142 S, Su 06:00 14:00 D Speed reduction max speed 70 up to 10,000 m and max speed 40 at max 2,000 m within 70 reduction may arise.

E 1143 1143 M-Tu 08:00 16:00 D Skb Infsi 2/1 - Fv Msi 32, 62, 36

E 1133 1133 S, Su 08:00 08:00 H Change of points in Krampen

E 1136 1136 S, Su 08:00 20:00 H Change of points in Spannarboda

E 1139 1139 S, Su 08:00 20:00 H Change of points in Näverkärret

E 1142 1142 S, Su 08:00 08:00 H Change of points in Sällinge

Track replacement Långsele-Anundsjö:

During 2011, the stretch of the line Långsele-Aspeå will be changed, preliminary work and track replacement will take place in weeks 1124-1131.

Working hours requirement 56 shifts at 8 hrs/shift.

Floating speed limit week 1124-1132, max speed 70 km/h for a maximum of 19 km and max speed 40 km/h for a maximum of 4 km.

Dead lines along the stretch during working hours. Diversion via Långsele-Nyland-Umeå:

During 2010, action package along the Långsele-Nyland stretch diversion with max. permitted axle load of 22.5

8 13 54704 (Helsingborgs (Åstorp) Catenary overhaul Helsingborg Gbg-- E 1116 1125 M-Su 09:00 18:00 D Åstorp-Bjuv w 1115-1116, Bjuv-Mörarp w 1117-1118, Mörarp-Påarp w 1119-1120, Påarp-Ättekulla w

1121-9 13 54264 (Åstorp) (Hässleholm) Catenary overhaul Hässleholm-Åstorp E 1126 1135 M-Su 00:00 24:00:00 H Coordinated with track replacement Klippan – Hässleholm.

10 13 47591 (Klippan) (Hässleholm) Track replacement Klippan-Hässleholm E 1126 1135 M-Su 00:00 24:00:00 H Possible division of stretches of the line. Track replacement carried out in the direction towards Hässleholm.

Complete closure.

13 3 45337 Furet Halmstad Vibration measures 51 (Ned) 1135 1135 F 00:00 24:00:00 H si 170 - 127 Total stop. Halmstad – Furet for eight days.

51 + 52 1135 1135 S/Su 00:00 24:00:00 H si 170 - 127, 140 - 157 Speed reduction w 1135-1136 max speed 70 km/h

51 + 52 1136 1136 M-S 00:00 24:00:00 H si 170 - 127, 140 - 157 Co-ordinated with PSB no. 9 and 10

51 (Ned) 1136 1136 Su 00:00 24:00:00 H si 170 - 127

14 11 43494 Trollhättan Göteborg, Marieholm Double track extension All 1124 1133 M-Su 00:00 24:00:00 H

15 11 47091 Agnesberg Göteborg, Marieholm Line reorganisation, stage Agb - Or E 1107 1107 M-Su 00:00 24:00:00 H Or 439 - Agb 21

16 23 52847 Göteborg Gubbero X Passenger train viaduct, bridge repairs 85 1126 1132 M-Su 00:00 24:00:00 H Hfr vxl 150 - si 909 Espdr Göteborg - Gubbero.

71-76 1126 1132 S/Su 15:00 15:00 H Two tracks under bridge, tracks 71-74, and shunting track 75-76, and at a time, closed during night. (3 occasions,

weekend: all tracks)

17 23 55277 Göteborg Kville Göteborg, Skandiahamnen Connection of new switchgear Alla 1116 1116 F-Su 00:00 24:00:00 D Gsh - si G 632

Alla 1117 1117 M 00:00 24:00:00 D

18 1 56505 Södertälje hamn Södertälje hamn Södertälje double track (Södertälje Hamn

(Port))

1,2 1050 1133 M-Su 00:00 24:00:00 H Söd 62(119v),92(120v), hfp vxl

12a,10a,13a-Söd 31(132h),83(131/132), hfp vxl 34b,38b,40b

Track 1 and 2 closed. Starts w 1039.

Continues to v1226.

Through tracks on tracks 6-8 via diagonal. Green stage, entire Port Line, and Kville. (Easter)

13:00 D

D D

H

09:35 14:20

56702 (Söderhamn) (Årskogen) Replacement of signal interlocking and

points installation – preparatory work

E 1118

1121 M-F

E 1121

09:35 14:20

Shv Infsi 21 - Åkg Infsi 3/2

56697 (Söderhamn) (Årskogen) Replacement of signal interlocking -

preparatory work

Shv Infsi 21 - Åkg Infsi 3/2

56776 (Hamrångefjärden) (Årskogen) Axmartavlan - points installation –

replacement of interlocking installation

1120 M-F

4 7 57039 (Långsele) Aspeå Track replacement E 1124 1131 M-Su 05:00 Lsl ublsi 42 - Ap msi 2/5, 3/5

19 1 56518 Södertälje hamn Södertälje hamn Södertälje double track (Södertälje Hamn

(Port))

3,4,5 1134 1149 M-Su 00:00 24:00:00 Söd hfp 12b,23(118h)-Söd

61(131h),63(130/131/133h),65(130/133h), hfp

(3)

from

to

Description

fr

om

to

the week

fr

om

to

Limit/speed reduction

Comments

PSB n

Li

ne

Ob

Sin ope

T

racks

H/D

Continues to w 1226.

Returning train on track 1 and 2. Through on tracks 6-8.

21 1 56520 Södertälje hamn Södertälje hamn Södertälje double track (Södertälje Hamn

(Port))

2 1134 1149 M-Su 00:00 24:00:00 H Söd 81(127v)-Söd hfp vxl 10 Continues to w 1234. Returning train on track 1 and 2. Through on tracks 6-8.

22 1 56516 Södertälje hamn Södertälje centrum Södertälje double track (Södertälje Hamn

(Port))

All 1126 1149 M-Su 00:00 24:00:00 H Söc26(106v)-Söd23(118h) Total closure. Continues to w 1234.

23 1 56517 Södertälje centrum Södertälje centrum Södertälje double track (Södertälje Hamn

(Port))

All 1126 1149 M-Su 00:00 24:00:00 H Söc26(106v)-Söc64,66,68,86 Total closure. Continues to w 1234.

24 2 56221 (Åby) Simonstorp Tunnel improvement work Graversfors Up alt Down 1105 1108 ntTu-ntF

ntM

23:55 05:30 D Åby 42 - Smt 61 alt Åby 72 - Smt 31

Up alt Down 1105 1107 ntSu 21:30 08:30 D Åby 42 - Smt 61 alt Åby 72 - Smt 31

All 1108 1122 M-Su 00:00 24:00:00 H Åby 42, 72 - Smt 61, 31

All 1123 1123 M-S 00:00 24:00:00 H Åby 42, 72 - Smt 61, 31

Up alt Down 1124 1135 ntTu-ntF

ntM

23:55 05:30 D Åby 42 - Smt 61 alt Åby 72 - Smt 31

Up alt Down 1124 1134 ntSu 21:30 08:30 D Åby 42 - Smt 61 alt Åby 72 - Smt 31

26 9 56374 Önaskogen (Skänninge) New switchgear connection All 1142 1142 F-Su 4 24:00:00 H Öna 21,51 - Skn 21

All 1143 1143 M 00:00 4 H Öna 21, 51 - Skn 21

27 9 56350 Motala Refurbishment Motala marshalling yard,

tracks 2-9

2,3,4 5-9 1050 1126 M-Su 00:00 24:00:00 H Mot 232, 262, 264 - Mot 231, 233, 235

2,3,4 5-9 1127 1127 M-F 00:00 24:00:00 H Mot 232, 262, 264 - Mot 231, 233, 235

2,3,4 5-10 1127 1127 S 00:00 06:00 D Mot 232, 262, 264 - Mot 231, 233, 235

56355 Motala Refurbishment Motala marshalling yard,

track 1

1 1132 1151 M-Su 00:00 24:00:00 H Mot 234 - Mot 261 Speed reduction w 1132-1151 M-Su, max speed 40 km/h, 1000 m.

Trains can be taken in to Motala at tracks with platform by passing stop signal after permission from train dispatcher, shunting to Motala workshop possible.

Speed reduction w 1102 M-Su, max speed 70 km/h, 2000 m.

30 9 56364 Motala (Mjölby) Motala–Mjölby, summer closure E 1127 1127 S 06:00 24:00:00 D Mot 221, 251 - My 221 No traffic in to Motala allowed during closure.

E 1127 1127 Su 00:00 24:00:00 D Mot 221, 251 - My 221 Speed reduction w 1133-1135 M-Su, max speed 70 km/h, 16,800 m.

E 1128 1132 M-Su 00:00 24:00:00 H Mot 221, 251 - My 221

32 16 56582 Spånga Kallhäll Mälarbanan Barkarby-Kallhäll DOWN, UP 1142 1142 Th-Su 20:00 24:00:00 H Spå 53,23-Khä 24,54

DOWN, UP 1143 1143 M-Tu 00:00 04:30 H Spå 53,23-Khä 24,54

34 18 47010 Kvicksund Kvicksundsbron All 1133 1133 M-Su 00:00 24:00:00 H Ksu 139 - Ksu 141 Change of sleepers and points are after the is.

35 58 56754 Västerhanninge Nynäshamn Nynäs line, double track extension E 1117 1133 M-Su 00:00 24:00:00 H Vhe 24,35-Nyh 41,43,45 Total closure.

36 22 56737 Karlberg Solna Solna Tunnels incl speed limit. U2 1121 1121 Su 22:00 24:00:00 D Ke 233-So 1264 Speed reduction w 1122-1125 to maximum speed 40 km/h. Stretch 600 m.

U2 1122 1122 M 00:00 04:30 D Ke 233-So 1264 U2 1122 1122 ntTu-ntSu 22:00 04:30 D Ke 233-So 1264 U1 1122 1122 M-Su 00:00 04:30 D Ke 263-So 1272 U2 1122 1122 Su 22:00 24:00:00 D Ke 233-So 1264 U2 1123 1123 M 00:00 04:30 D Ke 233-So 1264 U2 1123 1123 ntTu-ntSu 22:00 04:30 D Ke 233-So 1264 U1 1123 1123 M-Su 00:00 04:30 D Ke 263-So 1272 U2 1123 1123 Su 22:00 24:00:00 D Ke 233-So 1264 U2 1124 1124 M 00:00 04:30 D So 233 So 1264 U2 1124 1124 ntTu-ntSu 22:00 04:30 D Ke 233-So 1264 U1 1124 1124 M-Su 00:00 04:30 D Ke 263-So 1272 U2 1124 1124 Su 22:00 24:00:00 D Ke 233-So 1264 U1 1125 1125 M 00:00 04:30 D Ke 263-So 1272 U2 1125 1125 M 00:00 04:30 D Ke 233-So 1264

37 22 56741 Karlberg Solna Solna Tunnels U1,U2 1126 1126 M-Su 05:30 24:00:00 H Ke 263,233-So 1272,1264

U1,U2 1127 1127 M-Su 00:00 24:00:00 H Ke 263,233-So 1272,1264

U1,U2 1128 1128 M-Su 00:00 24:00:00 H Ke 263,233-So 1272,1264

U1,U2 1129 1129 M 00:00 04:30 D Ke 263,233-So 1272,1264

38 22 56638 Solna Solna Solna platform reconstruction U2 1126 1126 M-Su 05:30 24:00:00 H So 1139-So 1163

N2 1126 1126 Tu-Su 00:00 04:30 D So 1141-So 1165

24:00:00 H

H

20 1 56519 Södertälje hamn Södertälje hamn Södertälje dubbelspår (Södertälje Hamn) 1 1134 1149 M-Su 00:00 24:00:00 Söd 31(132h)-Söd hfp vxl 32b

No traffic in to Motala allowed.

28 9 56326 Motala Skänninge Launch of underpass E 1101 1101 Tu-Su 07:00 Mot 261 - Skn 21

Switchgear to be moved Barkarby. Demolition of GC bridge. New road bridge. Straightening of curve Kallhäll.

Total closure up-line tunnel for a period of three weeks.

(4)

from

to

Description

fr

to

the week

fr

to

Limit/speed reduction

Comments

PSB n

Li

Ob

S ope

T

H/

U2 1129 1129 M 00:00 04:30 D So 1139-So 1163

39 22 56655 Solna Solna Solna platform reconstruction N2,U2 1110 1110 F-Su 19:00 24:00:00 H So 1139,1141-So 1263,1265

N2,U2 1111 1111 M 00:00 04:30 D So 1139,1141-So 1263,1265

40 22 56661 Solna Solna Solna platform reconstruction N2,U2 1108 1108 ntSu 21:00 04:30 D So 1139,1141-So 1163,1185

N2,U2 1109 1109 ntSu 21:00 04:30 D So 1139,1141-So 1163,1185

41 22 56699 Solna Solna National Arena U1,U2 1126 1126 M-Su 05:30 24:00:00 H So 1101,1139-So 1271,1328

U1,U2 1127 1127 M-Su 00:00 24:00:00 H So 1101,1139-So 1271,1328

U1,U2 1128 1128 M-Su 00:00 24:00:00 H So 1101,1139-So 1271,1328

U1,U2 1129 1129 M 00:00 04:30 D So 1101,1139-So 1271,1328

42 22 56747 Solna Solna Solna Tunnels D1,D2,45,44 1129 1129 ntTu-ntSu 23:00 04:30 D So 1072,1073,1062,1164-So 1133,1146

D1,D2,45,44 1129 1129 S 23:00 24:00:00 D So 1072,1073,1062,1164-So 1133,1146 D1,D2,45,44 1130 1130 M 00:00 04:30 D So 1072,1073,1062,1164-So 1133,1146 D1,D2,45,44 1130 1130 ntTu-ntSu 23:00 04:30 D So 1072,1073,1062,1164-So 1133,1146 D1,D2,45,44 1130 1130 Su 23:00 24:00:00 D So 1072,1073,1062,1164-So 1133,1146 D1,D2,45,44 1131 1131 M 00:00 04:30 D So 1072,1073,1062,1164-So 1133,1146 D1,D2,45,44 1131 1131 ntTu-ntSu 23:00 04:30 D So 1072,1073,1062,1164-So 1133,1146

Closed track. To be coordinated with The National Arena.

Closed track. To be coordinated with Solna tunnel renovation.

Closure of tunnel during the nights.

Closed track. To be coordinated with The National Arena.

(5)

from

to

Description

fr

om

to

the week

fr

om

to

Limit/speed reduction

Comments

PSB n

Li

ne

Ob

Sin ope

T

racks

H/D

43 22 56788 Karlberg Sundbyberg City line - SWB viadukt N1 1129 1129 F-Su 22:00 00:00 H Ke 185-Ke 299

N1 1130 1130 M 00:00 04:30 D Ke 185-Ke 299

N1 1130 1130 F-Su 22:00 00:00 H Ke 185-Ke 299

nsp alternatively DOW down line 1

usp alternatively UP up line 2

U/D up and down line 3

E single track 4

cat. catenary 5

Cat. work catenary work 7

yard marshalling yard 8

nbef. night before … 9

max.speed highest permitted speed (km/h) 10

( ) 11

PMeet Planning meeting 13

H 15

D 16

BEST 18

ntTu-nmSu Night to Tuesday – night 22

23 58 73 84 88 00:00 (time) indicates start/end every day thoughout period

Ban-, El-, Signal-, Telearbeten (Track

Norway/Vänern Line with Northern Link Skåne Line

00:00 (time) indicates start/end for whole period Älvsborg Line

Stockholm Älvsjö - Ulriksdal/Sundbyberg Göteborg local interlocking area Mälar Line

Sala–Oxelösund

Blekinge Coast Line Nynäshamn-(Västerhaninge) Bohus Line

Finspång-(Kimstad)

see also object Ö56792

Western main line Southern main line

Main line through Upper Norrland

between stations i.e. the line

Northern Main Line Freight Line through Bergslagen Bergslagen Line

East Coast Line West Coast Line Coast to coast line

References

Related documents

Facet joint arthropathy - osteophyte formation and distortion of joint alignment MRI Axial T2 L3-L4 disk Psoas Paraspinal muscles Psoas Paraspinal NP AF MRI Axial T2 PACS, BIDMC

Ab initio candidates may require several years to complete flight training, delaying the collection of criterion data and raising issues pertaining to internal validity

Cybersecurity is a key area of risk management for businesses and organizations, and has been demonstrated to affect information systems early in the life cycle

ISGM subcontractors don’t even have to pay for connectivity — Toughbooks save ISGM subcontractor’s time and money as TOWs are allocated based on geographic location, skill level

Planning & Accountability Texas A&M University Pathways Grant Administration 7/30/2010 $13,000 Alamo Community College District Pathways Regional

The aims of this project is to develop a smart charging controller to enable controlled charging of electrical vehicles without overloading the grid (G2V), reduce the

Setting up your first basic store: This chapter covers creating a first basic store with Shopify and introduces the admin, where you’ll develop and run your store8. The key

As  part  of  the  mobile  monitoring  system,  strap‐down  kinematic  sensors  [36]  were  used