• No results found

projects since 2000 health care 3 planning and consulting in health care 6

N/A
N/A
Protected

Academic year: 2021

Share "projects since 2000 health care 3 planning and consulting in health care 6"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

(1)

ref

er

en

ce

li

st

(2)

proj

ec

ts

s

in

ce

2

00

0

health care 3

(3)

Conversion and extension hospital, Meyriez

GNS Gesundheitsnetz See, Murten

Collaboration with Winkelmann Architekten AG 2011 – 2015

Conversion and extension rehabilitation clinic, Bellikon

Suva, Lucerne Competition 1st prize 2010 – 2015

New ward block (BdL2), HUG university hospital Geneva

Canton Geneva

Collaboration with Brunet-Saunier, Jacques Lucan, Odile Seyler und Gerold Zimmerli 2006 – 2015

Conversion basement Klinik Permanence, Bern

Medi-Clinic Switzerland AG, Schaffhausen 2011

Feasibility study geriatrics center, Riehen

Adullam Foundation Basel 2010 – 2011

Client representative new treatment wing Lindenhofspital, Bern

Lindenhofspital Berne 2010 – 2011

Conversion hospitalbuilding Bundesstrasse 1, Basel

Crossklinik Am Merian Iselin Spital, Basel Collaboration with geiser, locher architekten 2009 – 2011

Competition replacement high-rise building cantonal hospital, Winterthur

Construction Directorate of Canton Zurich 2010

Test planning residential home for the elderly “Waldheim”, Zug

RESO Partners AG, Glattbrugg 2010

Feasibility study extension dining room Wibrandis-Haus, Basel

Bauverein Oekolompad, Basel 2009

he

al

th

c

ar

e

3

(4)

Competition new mental institution CHUV Lausanne

Centre Hospitalier Universitaire Vaudois CHUV, Lausanne 2009

Competition new emergency hospital, Nyon

GHOL Groupement Hospitalier de l‘Ouest Lémanique 2009

Competition new cantonal hospital Bruderholz

Canton Basel-Country, Liestal 2008 – 2009

Conversion and extension medical center, Bad Ragaz

Grand Resort Bad Ragaz

Collaboration with Smolenicky&Partner 2007 – 2009

Refurbishment operating room and anaesthetic recovery room clinic Perma-nence Bern

Clinic Permanence, Berne 2008

Competition new citizen hospital Solothurn

Canton Solothurn Competition 4th prize 2007 – 2008

Conversion/refurbishment residential care home for the elderly Missionsstrasse, Basel

Adullam Foundation Basel 2007 – 2008

Refurbishment operating room Clinic Permanence Bern

Clinic Permanence, Berne 2006 – 2008

New cantonal hospital Zug

Canton Zug Competition 1st prize

Collaboration with Heinle Wischer Partner 2002 – 2008

Competiton façade refurbishment clinic de La Source, Lausanne

Clinique de La Source, Lausanne 2007

Taget planning and feasibility study ward block hospital Uster

Spital Uster 2007

Feasibility study apartments for the elderly Basel

Adullam Foundation Basel 2006 – 2007

Feasibility study and prelimerary design conversion/new center for the elderly “Obere Mühle” Lenzburg

Alterszentrum Obere Mühle, Lenzburg 2005 – 2007

New residential home for the elderly “Domicil Hausmatte” Hinterkappelen

Moser Bau Immobilien AG, Münchenbuchsee 2004 – 2007

Refurbishment technical building systems production pharmacological liquids pharmacy CHUV Lausanne

Centre Hospitalier Universitaire Vaudois CHUV, Lausanne 2003 – 2007

Extension Trèfle II, pediatrics, dialysis, patient admission Yverdon-les-Bains

Etablissements hospitaliers du Nord Vaudois eHnV, Yverdon-les-Bains 2005 – 2006

New care center Baar

Canton Zug Competition 1st prize 2002 – 2006

Feasibility study refurbishment patient admission hospital center Biel

Hospital center Biel 2005

Preliminary design refurbishment operating room in the basement of Clinic Permanence Bern

Clinic Permanence, Berne 2005

Taget planning home for the elderly „Viktoria“ Bern

Institut Ingenbohl, Brunnen 2005

Conversion home for the elderly „Viktoria“ Bern

Institut Ingenbohl, Brunnen 2004 – 2005

Competition new ward block / conversion high rise building Albisgüetli city hospital Triemli Zurich

City of Zurich 2004 – 2005

Conversion and finishing cantonal psychiatric clinic Liestal

Canton Basel-Country, Liestal 2003 – 2005

Refurbishment operating rooms 1-3 clinic Beau-Site Bern

Clinic Beau-Site, Berne 2003 – 2005

Conversion office building into a residential care home for the elderly Basel

Civil hospital, Basel 2001 – 2005

New hospital Pourtalès NHP Neuchâtel

City of Neuchâtel

Collaboration with Geninasca-Delefortrie SA, GMS Architectes SA, Robert Monnier Architecte

1995 – 2005

Competition residential home for the elderly „Landpfrunhaus“, Riehen

Municipality of Riehen Competition 2nd prize 2004

New university hospital for children of both Basel UKBB

Canton Basel-Town Competition 2nd prize 2003 – 2004

Feasibility study residential care home, Reinach

Municipality of Reinach 2003 – 2004

Complete refurbishment Clinic Permanence, Berne

Privatklinikgruppe Hirslanden, Zurich 2002 – 2003

New residential care home for the elderly Missionsstrasse, Basel

(5)

Garden wing, 4th stage of redevelopment, hospital Uster

Zweckverband Spital Uster 2000 – 2003

Feasibility study conversion cafeteria hostpital center Biel

Hospital center Biel 2001

Conversion medical practices Bottingenstrasse, Berne

Dr. Meyer Verwaltungen AG, Berne 2001

Extension Trèfle I, pharmacy, medical-technical center, Yverdon-les-Bains

Etablissements hospitaliers du Nord Vaudois eHnV, Yverdon-les-Bains Collaboration with Aldo & Silvio Dolci

2000 – 2001

Feasibility study extension IPS/OPS regional hospital Visp

Regional Hospital Santa Maria, Visp 1998 – 2001

Conversion and refurbishment apartments for the elderly, Basel

Sozialverein St. Johannes, Basel 1998 – 2000

New medical group practice “Reinacherhof”, Reinach

Walter Brunner-Heid, Münchenstein 1998 – 2000

Transformation and extension Tafers Hospital

Gemeindeverband Spital des Sensebezirks, Tafers 1995 – 2000

(6)

Ente Ospedaliero Cantonale Ticino; Ospedale Regionale di Lugano

Target planning, programming, functional planning supervision since 2006

Spital Lachen AG

Target and overall planning, preliminary design/feasability emergency wing and kitchen extension, planning interim solution (extension bed supply, medical practices and dialysis), medical technology planning

2008 – 2012

Universitätsspital Zürich

Strategic spatial planning, procurement of medical equipment 2011

Merian Iselin Klinik, Basel

Feasability (2 OR and day hospital), planning and consulting in health care, medical technology planning

2011

Clinique de Longeraie, Lausanne

Basic evaluation for the operation at a new site 2010

Spital Limmattal, Schlieren

Target and overall planning, project competition overall rehabilitation, project management operation, operational concept, space allocation plan, supervision feasibility study

2002 – 2010

Kantonsspital Aarau AG

Baseline study and evaluation (basis master plan), demand/conceptual study and preliminary design health center station Aarau, feasability/investment/operating costs research institute

2009

Crossklinik AG, Praxishaus Basel

Study OR and sterilization 2009

Kantonsspital St.Gallen

building/overall feasibility study, second opinion new central sterilization 2009

he

al

th

c

ar

e p

la

nn

in

g a

nd

c

on

sul

tin

g

(7)

Spitäler Schaffhausen; Kantonsspital und Psychiatrische Dienste

Strategic spatial planning 2008 – 2009

Hôpital du Jura

Sterilization Delémont and Porrentruy 2008

Hochbauamt Kanton St. Gallen;

Spitäler Grabs, Altstätten, Wil, Wattwil, Linth, Rorschach

Basic evaluation, target space allocation and functional plan, feasibility 2006 – 2008

Spital Bülach

Second Opinion: expertise regarding asset and planning 2007

Hôpital neuchâtelois; Nouvel Hôpital de Pourtalès

Operational organization, spatial programming, medical technology planning 2005

Institut für Pathologie und Rechtsmedizin St. Gallen

Formulation of basics, supervision study new building 2005

Kantonale Psychiatrische Klinik Herisau

Target and overall planning / preliminary design 2003 / 2005

Departement Finanzen und Ressourcen, Kanton Aargau; Kantonsspital Baden

Master plan, client supervision and overall project management 2004

Universitäts-Kinderspital Zürich

Second Opinion: survey project for the new building, accompanying operational organization planning 2004

Hochbau- und Planungsamt Basel-Stadt; Kantonsspital Basel

Rehabilitation Klinikum 1 west, medical technology planning 2003

Spitalzentrum Biel AG – Centre hospitalier Bienne SA

Budgeting medical equipment / appliances 2001

Hôpital fribourgeois – Freiburger Spital; Bezirksspital Tafers

Consulting architecture, spatial conception, medical technology planning 2000

References

Related documents

Možno teda nájs ť univerzálne preferované postupy správania, ako aj tie, ktoré sú vo všeobecnosti odmietané, a pravda aj také, ktoré sú predsa len vo vä č šej miere ovplyv ň

The technical potential for variable renewable electricity generation in Czechia is more than twice as high as the estimated electricity consumption in 2030, which constitutes

This was done so as to assess how each RQ construct (trust, commitment, non-coercive power, coercive power, dependency, conflicts) contribute to performance (efficiency,

Nursing Topics Discussed During Rounds The Society of Critical Care Medicine & Sutter Health (2015) highlight the importance of members of the interprofessional team

Absorption values, pulse and orbital periods, and distances or redshifts were collected from the literature and were used to study the populations of high-energy sources, to test

Advertisers/ internal managers/ applicants with internet access will have access to the system via login protected accounts from any location. List any key policies or procedures to

El reuso del agua en la Ciudad de México ha sido importante para la diminución de agua potable en el sector industrial y el sector agrícola (JIMENEZ,2011). El reuso de