PAPER COPY UNCONTROLLED Doc. No. SPA PT – 001, Rev.7, Issue Date: 01/04/2015
SAQR PORT AUTHORITY
PORT TARIFF
SAQR PORT AUTHORITY
P.O. Box 5130 Ras Al Khaimah United Arab Emirates
Telephone: +971 (0) 7 205 6000/266 8444 Fax: +971 (0) 7 266 8533 E-mail: info@saqrport.ae Website: www.saqrport.ae PORT CONTROL Telephone: +971 (0) 72056161/2/3 Fax: +971 (0) 72668051 E-mail: controltower@saqrport.ae
SENIOR MANAGEMENT TEAM
General Manager (Harbour Master):
Port Operations Manager: Philip Madin Business Development Manager: Alan Pollard Deputy Port Operations & Security Manager: Justin Wardle HSEQ Manager: Peter Wortley
Operations Manager (Projects): John David Kendall
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
STATUTORY BASIS FOR CHARGES
THE AUTHORITY TO RAISE CHARGES
The authority to charge “ship, passenger, cargo and other dues” as considered “fit” is vested in the board of Saqr Port by the Ras Al Khaimah (RAK) Ports Act No. 9 of 2008.
THE POWER TO COLLECT CHARGES RAISED
By virtue of the RAK Ports Act No. (9) of 2008 the Saqr Port may recover rates payable to them in respect of a ship by distraint and sale of the ship and its tackle and in respect of any goods by distraint and sale either of those goods or any other goods held on harbour premises belonging to the persons liable for payment of the dues.
PAYMENT TERMS
Payment due within 45 days of the date of demand/invoice unless otherwise indicated. Thereafter interest will be charged at 2% per month PRO-RATA. The Port Authority reserves the right to demand full payment prior to departure.
CHANGES TO TARIFF
Saqr Port reserves the right to alter/modify the above tariff giving a notice period of 7 days only.
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
CONTENTS
Page
List of Wharves: 1
Rates on Commercial Vessels:
Assessed to Gross Tonnage
2 - 4
General and Bulk Cargo Services and Charges:
a) Rates on Articles and Goods Landed or Shipped within the Port
b) Goods in Transit/Storage c) Sundry Charges
Marine Services and Charges:
a) Pilotage
b) Berthing/Unberthing c) Towage
d) Mooring
e) Sundry Charges
Rates on Recreational Vessels and Fishing/Commercial Vessels: Not assessed to Gross Tonnage
Marine Documents and NOC Fees Environmental Violation Tariff Traffic Violation Tariff
Safety System Service Charges
Security Services and Charges
5 – 7 8 9–13 14-15 15 16 16 17-18 19 20 21 22-23 24-25 26
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
LIST OF WHARVES
Wharf Name: Location within the Port:
Port Authority Wharves
No. 5 Berth Saqr Port No. 6 Berth Saqr Port No. 7 Berth Saqr Port No. 8 Berth No. 9 Berth No. 10 Berth No. 11 Berth No. 12 Berth Raymond Jetty
RAK Maritime City Free Zone
Saqr Port Saqr Port Saqr Port Saqr Port Saqr Port
Stevin Rock Harbour
RAK Maritime City Free Zone Private Wharves No. 1 Berth No. 2 Berth No. 3 Berth No. 4 Berth Saqr Port Saqr Port Saqr Port Saqr Port
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
RATES ON COMMERCIAL VESSELS – ASSESSED TO GROSS TONNAGE (See Note (1) Page 7)
(a) On entry to the port, on shifting between berths within the port and on remaining within the port for more than five days
Rates are charged per TON/GROSS TONNAGE and apply to all commercial vessels. Rates increase when vessels remain within the Port for more than five days and port users should refer to the three separate tables below.
TABLE 1
RATES CHARGED ON ENTRY AND UP TO 5 DAYS
BERTHING AT
Port Authority Wharf Private Wharf AED AED Saqr Port / Stevin Rock Harbour/
RAKMCFZ Vessels at anchorage STS Operations 0.17 per GRT 0.17 per GRT TABLE 2 RATES CHARGED ON
SHIFTING BETWEEN BERTHS
On Port’s Convenience No charge On Agent’s Account/Vessel’s
Convenience As per Marine Services & Charges
TABLE 3
RATES CHARGED ON REMAINING WITHIN THE
PORT/ANCHORAGE FOR MORE THAN FIVE DAYS
Port Authority Wharf Private Wharf AED 0.07 per GRT
per day
AED 0.07 per GRT per day
See List of Wharves on Page 1 For Port Authority and Private Wharves
Anchorage Fees (Lay-up/Repairs): AED 0.14 per GT per day Anchorage Fees (waiting): AED 0.12 per GT per day Supply Launches AED 300.00 per trip
[Vessel destined to other ports : As per GM’s instruction dated 18.07.2012]
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
RATES ON COMMERCIAL VESSELS – ASSESSED TO GROSS TONNAGE
b) Vessels requesting a Port Authority berth for purposes other than working cargo (Lay-by Charges).
Subject to availability, a vessel lying alongside a Port Authority wharf, but not loading or discharging cargo, will be liable to pay a daily rate of AED 30.00 per metre of vessel length per day from the day of first entering the Port, in addition to the tonnage rate detailed in Table 1 and 3 on Page 2. Small Tug less than 999 GRT AED 1800.00 per day (subject to duration of stay).
Note: No lay-by/repair charges will be levied on vessels during cargo operations. These charges will only be applied prior to or post cargo operations, however a grace period of 11/
2 hours will be given post cargo operations for completion of
repairs and all other formalities.
c) Port Waste Reception Facilities
In respect of commercial vessels laying alongside at Port Authority wharves, a mandatory charge on entry of AED 250.00 per vessel per day will be levied for providing and administering port waste reception facilities plus a disposal charge of AED 300.00 per waste container. Supply vessels AED 1200.00 per month. Sludge / waste oil disposal at berth / anchorage – on request.
d) Service Rebates
At the discretion of the General Manager and on application by the service representative, rebates on vessel dues may be awarded. Application must be made at each quarterly end by the production of a report detailing:
Name of service and its provider.
Name of vessels.
Dates of arrival.
Port/s of loading.
Total manifested cargo discharged at Saqr Port/Stevin Rock Harbour/ KGL/ RAKMCFZ.
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
RATES ON COMMERCIAL VESSELS – ASSESSED TO GROSS TONNAGE
Notes
1. A “commercial” vessel, for the purposes of applying the above rates and charges is defined as a vessel assessed as to Gross Tonnage (i.e. a vessel having an International Tonnage Certificate).
2. Payment terms: 45 days from date of demand. Thereafter interest will be charged at 2% per month PRO-RATA. The Port Authority however reserves the right to demand full payment prior to departure.
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
GENERAL AND BULK CARGO SERVICES AND CHARGES
a) RATES ON ARTICLES AND GOODS LANDED OR SHIPPED WITHIN THE PORT
PORT HANDLING CHARGES 1. DIRECT DELIVERY
Cargo received for a vessel delivered by transport direct to vessel no port equipment used. If any port equipment, MHC, Forklifts etc. at Tariff charges.
PRINCIPAL COMMODITY DESCRIPTION Rate AED Per
Freight Ton Cement
Bulk 3.00
Pallets / Jumbo Bags 3.00
Other Cargo
Bagged (Loose) 15.00
Pallets and Jumbo Bags 10.00
Steel / Pipes 10.00
General Cargo 12.00
General Cargo / Steel Over 20 tons 20.00
Bulk Rocks On request Pet Coke Soda Ash 4.00 6.00
Bulk Cargo Import 4.00
Bulk Cargo Export 2.00
Bulk Animal Feed/Y Corn/Soya Bean/ Lentils Clinker Export
Red Shale/Iron Ore/Laterite/Sand (Export):
5.00 2.00 4.00 Bulk Oil and Fuels
Import 5.00
Export 2.00
Live Cargo
Sheep & Goat 2.00 per head
2. INDIRECT DELIVERY
Cargo received in to the Port using ports Forklifts only. MHC and other Port Equipment as per Tariff Charges.
PRINCIPAL COMMODITY DESCRIPTION
Rate AED Per Freight Ton
Cement 15.00
Other Cargo
Bagged (Loose) 25.00
Pallets and Jumbo Bags 15.00
Steel / Pipes 18.00
General Cargo 20.00
General Cargo / Steel Over 20 tons 25.00
Bulk
Aggregate 1.00
Rocks On request
Soda Ash 6.00
Bulk Cargo Import 4.00
Bulk Cargo Export 4.00
Bulk Animal Feed/Y.Corn/Soya Bean 5.00
PRINCIPAL COMMODITY DESCRIPTION
Rate AED Per Freight Ton 3. VEHICLES PER UNIT Up to 2 ton Above 2- 5 ton 100.00 200.00 Above 5 -10 ton 300.00 Above 10 -15 ton 350.00
4. CONTAINERS PER UNIT
(i) PORT HANDLING
20 ft. full 20 ft. Empty 40 ft. full 40 ft. Empty (ii) STEVEDORING MHC 20 ft. full 20 ft. Empty 40 ft. full 40 ft. Empty 200.00 50.00 300.00 75.00 350.00 150.00 500.00 200.00
PRINCIPAL COMMODITY DESCRIPTION
Rate AED Per Freight Ton
(iii) STRIPPING/STUFFING
PRINCIPAL COMMODITY DESCRIPTION
(iii) STRIPPING/STUFFING
20 ft. (PALLETISED F/Lift work only)
40 ft. (PALLETISED F/Lift work only)
20 ft. (UNPALLETISED F/Lift only)
40 ft. (UNPALLETISED F/Lift only)
For container work with other equipment Tariff Charges apply (hourly rate)
Rate AED Per Freight Ton
250.00 400.00 350.00 600.00
5. FISH / SHELL FISH 1 % of catch
6. HAZARDOUS CARGO 50 % extra on above
charges
Notes
1) The General Manager will exercise discretion in determining whether articles and goods not specified in this list fall into the “general” category at 3. Unlisted cargoes not falling into category 3 will have rates determined at the discretion of and on application to the General Manager.
2) In charging the rates on goods, the gross weight or measurement of goods shall be taken. Fractional parts of any weight, measure, number or value shall be charged according to the nearest greater whole number.
3) A Cargo Declaration Form must be completed by the ship’s agent or the consignee of the cargo or agent thereof and submitted to the Port Authority no later than 24 hours after completion of discharge and/or loading.
4) Declarations of catch values for fish, shellfish and other sea-caught
foodstuffs should be accompanied by a landing certificate clearly detailing the market value.
5) Terms of payment: 45days from date of demand. Thereafter interest will be charged at 2% per month PRO-RATA.
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
GENERAL AND BULK CARGO SERVICES AND CHARGES b) GOODS IN TRANSIT/STORAGE
When space is available goods may be stored for a period on Saqr Port’s wharves and within its transit sheds. Storage is at the discretion of the General Manager and dependent on traffic requirements.
Saqr Port does not accept any responsibility for any loss or damage, however caused to any goods placed on its wharves or within its transit sheds.
Saqr Port Wharves
Import/Export (not including Aggregate/Limestone) Discharging/Loading from/to vessel
Chargeable Days (All Cargoes)
First 5 Days : Free of charge
a) 06 to 10 days : AED 0.50 per ton per day (ptpd) b) 11 to 20 days : AED 0.75 ptpd
c) 21 to 30 days : AED 1.00 ptpd d) 31 to 45 days : AED 2.00 ptpd e) 46 to 60 days : AED 3.00 ptpd
Ordinarily goods will not be allowed to remain in port for more than 60 days and the charges levied beyond this point in time will be determined at the discretion of and on application to the General Manager.
Transit Sheds
Rent on the use of transit sheds is charged according to current market rates and availability and will be quoted on application.
In order to avoid any dispute with regard to the calculation of storage charges for shipments within Saqr Port’s storage yards/transit sheds, a daily report is to be forwarded to Saqr Port by 0800 hrs every day identifying the previous 24 hours figures.
The report should include the volume of shipments transported from vessel to yard/yard to factories and vice versa.
Aggregate/Limestone
Storage of Aggregate and Limestone will be on a square metre basis determined at the discretion of and on application to the General Manager.
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
GENERAL AND BULK CARGO SERVICES AND CHARGES c) SUNDRY CHARGES
Overtime:
Vessels working outside normal working hours will be charged overtime. a) Bulk Cargo – AED 200.00 per ship hour b) General Cargo – AED 100.00 per gang per hour c) Bagged Cement – AED 100.00 per gang per hour
Normal Working Hours – Saturday to Thursday 0700 – 2200 hrs Friday and Official Holidays – Full Overtime Rates apply
Berth Cleaning: – AED 0.35 per ton (min AED 1000.00)
Hatch Cleaning: – AED 1600.00 per hatch
Crane/Cargo Delay: For whatever reason and at the discretion of the General Manager the following charges may be applied for crane delays and for delays in the removal of cargo from the quay after vessel completion.
a) Crane Delay – AED 1600.00 per hour (during cargo operations)
b) Cargo Removal Delay – Up to 4 hours foc thence AED 700.00 per hour until quay is clear of cargo.
Port Equipment Hire:
Forklifts: 3 ton – AED 150.00 per hour or part thereof 7 ton – AED 200.00 per hour or part thereof 12-16 ton – AED 250.00 per hour or part thereof 30-45 ton – AED 350.00 per hour or part thereof Cranes : 20 ton – AED 250.00 per hour or part thereof 50 ton – AED 380.00 per hour or part thereof 90 ton – AED 700.00 per hour or part thereof
Shovel: – AED 170.00 per hour or part thereof Bobcat: – AED 150.00 per hour or part thereof Tennant (Sweeper): – AED 110.00 per hour or part thereof Trailer: – AED 230.00 per hour or part thereof Deflector: – AED 160.00 per day or part thereof
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
GENERAL AND BULK CARGO SERVICES AND CHARGES
Small Hopper: – AED 2750.00 per day or part thereof Large Hopper: – AED 3500.00 per day or part thereof Dock Mobile Loader: – AED 12000.00 per day or part thereof Man Lift: – AED 200.00 per hour
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
GENERAL AND BULK CARGO SERVICES AND CHARGES
General Cargo Stevedoring Ship Gear: AED 11.00 per freight ton
Mobile Harbour Crane:
General Cargo/Heavy Lifts: AED 2000.00 per hour or part thereof Aggregate/Limestone/Gabro: AED 5.00 per ton
Aggregate/Limestone/Gabro (0.05 mm): AED 7.00 per ton Aggregate/Limestone/Gabro (30mm +): AED 9.00 per ton Barites (up to 30 mm): AED 7.00 per ton Bauxite: AED 6.00 per ton Bentonite: AED 6.00 per ton Clinker: AED 5.00 per ton Coal: AED 6.00 per ton Calcium Carbonate: AED 6.00 per ton Garnet: AED 6.00 per ton Gypsum/Marble Chips: AED 5.00 per ton
Gypsum/M. Chips Less than 5,000 T: AED 8.50 per ton (Lump sum) Gypsum/M. Chips over 25 mm: AED 10.50 per ton (Lump sum) Copper Slag/Iron Ore/Red Shale/Laterite: AED 8.00 per ton
Pet Coke: AED 9.00 per ton
Iron Ore Less than 5000 T: AED 9.00 per ton Lump Sum Silica Sand: AED 7.00 per ton
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
GENERAL AND BULK CARGO SERVICES AND CHARGES
Soda Ash: AED 10.00 per ton Animal Feed / Yellow Corn / Lentils: AED 20.00 per ton Soya Bean Meal: AED 20.00 per ton
Other Bulk: Ball Clay, Kaolin,
Feldspar, Furnace Slag, etc: AED 6.00 per ton
Any sticky cargo for the above commodities surcharge of AED 3.00 per ton. ALL BULK CARGOES LESS THAN 1500 ton ADDITIONAL AED 3.00 per ton. Above rates are applicable to specialised bulk carriers only – General Cargo vessels with decks are subject to an additional charge of AED 3.00 per freight ton.
Abnormal bulk commodities which require special handling arrangements (large stones, pet coke, scrap etc) are subject to additional charges at the discretion of and on application to the General Manager.
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
GENERAL AND BULK CARGO SERVICES AND CHARGES
Special rates apply for the use of the Mobile Cranes outside the port area and are subject to additional charges at the discretion of and on application to the General Manager.
Draft Surveys:
Import/Export: AED 2000.00 per survey (Vessels/Barges over 4000 tons)
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
MARINE SERVICES AND CHARGES
a) PILOTAGE
The Saqr Port as the Competent Harbour Authority (CHA) for pilotage in Saqr Port hereby makes the following list of pilotage charges and conditions of use of the pilotage service to take effect from the date above and replacing those previously applied.
AII charges are based on Gross Tonnage assessed in accordance with an International Tonnage Certificate.
Pilotage in the Port is compulsory.
The following pilotage charges are applicable only to acts of pilotage carried out between 0700hrs – 1900hrs Sunday to Thursday. Vessel movements carried out outside these normal hours will be subject to an additional charge of AED 1100.00 for vessels up to 5999 GT and AED 2200.00 for vessels over 6000 GT.
Pilotage payable on entry, on departure and on shifting: Up to – 9999 GT 10000 – 14999 GT 15000 – 24999 GT 25000 – 39999 GT 40000 GT + AED 650.00 AED 900.00 AED 1000.00 AED 1200.00 AED 1250.00 An additional charge will be levied for each of the following extra services: Internal movement at vessels convenience:
Up to 5999 GT 6000 GT +
Movements of vessels without main engine/steering: AED 2000.00
AED 3500.00 Double charges apply for all services rendered
Use of Pilot Boat per operation: AED 220.00 Detention Charges:
Up to 5999 GT per hour or part thereof 6000 GT + per hour or part thereof
AED 2000.00 AED 4000.00
SAQR PORT AUTHORITY
For the guidance of all vessels requiring the service of a Pilot the following procedure should be adopted:
BOARDING POINT: Pilots board incoming ships up to two miles off the Harbour Entrance.
ETAs AND AMENDMENTS: ETAs should be sent 24 hours before arrival through the Saqr Port Authority Control Tower or local agents with amendments at two hours' notice through Saqr Port Pilots on Channel 14 (VHF). ETAs should include the vessel's maximum draft.
ETAs may be sent to Saqr Port Pilots at the Saqr Port Control Tower. by fax: +971 (0) 72668051
or telephone: +971 (0) 72056161/2/3 or e-mail: controltower@saqrport.ae
CONTACT PROCEDURE: The Saqr Port Authority Control Tower maintains a listening watch on Channel 9/14/16 & RAKMCFZ Channel 69 throughout 24 hours.
WORKING FREQUENCIES: Having made initial contact on Channel 16, ships should communicate on the working frequencies - Channels 9 and 14 & 16 and for RAKMCFZ channels 69 & 16.
The Saqr Port reserves the right to plan the sequence of pilotage moves as directed by the Harbour Master, taking into account the size of ships, tidal circumstances and the availability of Pilots.
Payment for pilotage shall be made not later than 45 days from the date of demand. The Port Authority reserves the right to demand full payment prior to departure.
b) BERTHING/ UNBERTHING (Per Operation) Up to – 9999 GT AED 450.00 10000 – 14999 GT AED 600.00 15000 – 24999 GT AED 700.00 25000 – 39999 GT AED 925.00 40000 GT + AED 1050.00
SAQR PORT AUTHORITY
c) TOWAGE
Towage Charges:
Harbour Tugs are available for hire at the following hourly rates. Their use is compulsory and the number to be deployed is at the discretion of the General Manager/Harbour Master.
Note: Hire of the Port Authority tugs is at all times subject to availability of the tugs and crews and to the UK Standard Conditions for Towage and Other Services (1983).
Ghalilah (750HP): AED 1000.00 per hour or part thereof Hulaylah (1400HP): AED 1200.00 per hour or part thereof Masafi (1400HP): AED 1200.00 per hour or part thereof Durrah (2720HP): AED 1750.00 per hour or part thereof Shaam (4000HP): AED 2850.00 per hour or part thereof Falcon (4076 HP): AED 3250.00 per hour or part thereof Kestrel (5600 HP): AED 3750.00 per hour or part thereof
Use of the tugs for assisting disabled vessels and for charter is subject to availability of tug and crew and at the discretion of the General Manager (Minimum 2 X above).
d) MOORING
Mooring Charges:
Use of mooring boat: AED 180.00 per operation Use of mooring boat:
Special services: AED 180.00 per hour of part thereof Mooring Gang: Up to – 9999 GT: AED 350.00 10000 – 14999 GT: AED 400.00 15000 – 24999 GT: AED 500.00 25000 – 39999 GT: AED 600.00 40000 GT + AED 750.00 Mooring Gang:
Special Services: AED 75.00 per man per hour
SAQR PORT AUTHORITY
e) SUNDRY CHARGES
Watering Vessels:
Fresh Water Supply: AED 37.00 per ton
Sweet/Potable Water Supply: AED 10.00 per ton
Sweet/Potable Water Supply Approval fee: AED 150.00 per approval
Port Clearance Charges:
Port Clearance: AED 250.00
Vessels clearing from anchorage: AED 250.00
Immigration Attestation: AED 200.00 per attestation
NOC Certificate: AED 200.00/ NTA 1000
Special NOC Certificate: AED 2500.00
Bunkering Tariff:
Bunkering Charge: AED 12.00 per ton Safety Services: AED 300.00 per Truck (Double Charges apply on Fridays and Public Holidays)
Tanker Discharge: AED 1000.00 incl. cabin per day Bunkering/Pollution Penalties: (Not including clean-up costs (Claims)
Bunkering without permission: AED 10000.00 Pollution of sea water whilst sweeping
Or discharging ballast: AED 10000.00 Pollution of seawater whilst bunkering/de-bunkering
Or loading /discharging paint /dangerous goods: AED 10000.00 to unlimited
**The penalty also applies for the supply tanker if the truck was direct cause of the pollution.
Not reporting pollution: Up to AED 50000.00 Cleaning pollution without permission: Up to AED 50000.00 Use of equipment/manpower/resources/administration will be charged at General Manager’s discretion.
Miscellaneous:
HM Inspection for pollution checking: AED 3000.00 Marine weather bulletin/tide table [Annual fees]: AED 2000.00 HM Inspection visit prior to laying up: AED 1000.00
Diving Team Charges: AED 600.00 per diver per hour Weekly list of offshore vessel movement: AED 200.00 per week
Gangway Charge: AED 200.00 per day Berth Delay: (11/
2 hours will be allowed on arrival and after completion of cargo
operations for carrying out formalities)
Barge: AED 1000.00 per hour Vessel: AED 2000.00 per hour Saqr Port Authority – Tariff 2015 Page 17
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
MARINE SERVICES AND CHARGES
Dangerous Goods Port Entry Approval: AED 200.00 Safe Work/Hot Work Approval Fee: AED 200.00
Use of equipment/manpower/resources/administration will be charged at General Manager’s discretion
Stowaway Management/Admin: AED 30000.00
Stowaway Security: AED 1500.00 per day Arms & Ammunition inspection fee: AED 6000.00 per visit Registration Annual fees (Companies):
1- Potable Drinking Water: AED 25000.00 2- Bunker suppliers: AED 25000.00 3- Ship Chandlers: AED 25000.00 Deposit:
1- Bunker suppliers: AED 150000.00
Note
(Security deposit - not deductible towards normal operational invoices. Not to be withdrawn unless operations are cancelled).
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
RATES IN RESPECT OF VESSELS USED AS RECREATIONAL VESSELS AND FISHING / COMMERCIAL VESSELS NOT ASSESSED TO GT
Recreational and fishing vessels not assessed to GT on visits to Harbour:
Vessels visiting the Harbour: AED 100.00 per day Vessels remaining overnight:
Less than 12 metres: AED 200.00 per day 12 metres or greater: AED 300.00 per day Dhows: AED 1000.00 per day Boat Seeking Shelters: AED 1000.00 per day
MARINE DOCUMENTS AND NOCs - TARIFF- 2015 SL. No. Details Amount [AED] Remarks 1
NOC CHARGES FOR CREW CHANGE @ OPL: a. NOC TO CARRY-OUT CREW CHANGE AT OPL. b. MASTER'S UNDERTAKEN STATEMENT
APPROVAL FEE.
c. CREW CHANGE PER HEAD [Sign On/Off].
500.00 500.00 200.00 per head
2 WASTE DISPOSAL CHARGE [PER UNIT] 300.00
3 GARBAGE SKIP DAILY [PER GARBAGE] 250.00
4 GARBAGE SKIP FOR S/BOAT [PER MONTH] 1200.00
5 SAFE WORK APPROVAL FEE 200.00
6 HOT-WORK APPROVAL FEE 200.00
7
MASTER UNDERTAKEN STATEMENT IN ORDER TO CARRY OUT REPAIRS WHILE ALONG SIDE BERTH DURING CARGO OPERATION
200.00
8 DANGEROUS GOODS PORT ENTRY APPROVAL FEE 200.00
9 DIVING OPERATION [PER DIVER X PER HR] 600.00
10 NORMAL NOC To IMMIGRATION 200.00
11 SPECIAL NOC To IMMIGRATION 2500.00
12 NOC To NTA 1000.00
13 SPECIAL NOC To Coast Guard 2500.00
14 BUNKER SURCHARGES CHARGE [PER TON] 12.00
15 SAFETY SERVICE FEE [PER TRUCK ] 300.00
Double Charges apply on Fridays and Holidays
16 FRESH WATER SUPPLIED[PER TON] 37.00 17 SWEET/POTABLE WATER SUPPLIED [PER TON] 10.00 18 SWEET/POTABLE WATER SUPPLIED APPROVAL
FEE 150.00
19 PORTA CABIN FEE [PER DAY] 200.00 [ONLY Tanker Discharge] 20 SAFETY SERVICE FEE FOR OIL TANKER VSLS 800.00 [ONLY Tanker Discharge] 21 ARMS & AMMUNITION INSPECTION FEE [PER VISIT] 6000.00
22 STOWAWAY SECURITY [PER DAY] 1500.00
23 STOWAWAY MANAGEMENT & ADMIN 30000.00
24 PORT CLEARANCE CHARGES 250.00
25 IMMIGRATION ATTESTATION CHARGE 200.00
26 MOORING GANG OVERTIME [PER HR] 75.00
27 DISPOSED WASTE OIL [S/ BOAT ONLY] [PER DRUM] 1250.00
28 FORK-LIFT CHARGE [PER HR] 150.00
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
ENVIRONMENTAL VIOLATION TARIFF
Each person and or company violating such provisions below shall be subject to fine(s) imposed by the Port Authority. The amount shall vary between a minimum and maximum charge as noted below, dependent on the severity of the violation.
S. No. Violation Min [AED] Max [AED]
1. Noncompliance of drivers towards Port environmental rules & regulations.
250.00 1,000.00 2. Noncompliance of companies towards Port environmental
rules & regulations.
1,000.00 5,000.00 3. Failure to report any spillage to Port Management. Up to 50,000.00 4. Cleaning of spillage without permission of Port
Management.
Up to 50,000.00 5. Vehicle maneuvering whilst in an unstable position. 1,000.00 2,000.00 6. Causing minor aggregate spillage within Port property. 500.00 1000.00 7. Causing major aggregate spillage within Port property. 1,000.00 5,000.00 8. Fuelling without due care and provision of correct
prevention measures.
1,000.00 5,000.00 9. Causing minor oil / fuel / hazardous substance spillage
within Port property.
1,000.00 2,000.00 10. Causing major oil / fuel / hazardous substance spillage
within Port property.
10,000.00 to unlimited 11. Provision of spill response prevention measures by Port
Management.
As per NB below
NB: All environmental fine(s) will run alongside existing Port tariffs, and where
manpower, equipment, resources and administration are utilised, a charge at the General Managers discretion
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
TRAFFIC VIOLATION TARIFF
Each person and or company violating such provisions below shall be subject to fine(s) imposed by the Port Authority. The amount shall be a fixed charge as noted below, dependent on the severity of the violation.
In all cases where the first offence exceeds a verbal warning, a AED 500.00 charge will be applied, increasing in AED 250.00 increments for subsequent offences.
In cases of risky driving being recorded, a AED 1,000.00 charge will be applied, increasing in AED 500.00 increments for subsequent offences.
In the case of dangerous driving being recorded, a AED 2,000.00 charge will be applied, increasing by a AED 3,000.00 increment for the subsequent offence.
Offences Permanent Pass Holders Temporary Pass Holders
Parking in prohibited areas (Parking within 50 metres of the quayside, or in an unallocated parking area).
1st Offence - verbal warning.
2nd Offence - Fine imposed to
driver, Port access withdrawn until the driver’s company confirms to Port Management what disciplinary action has been taken.
3rd Offence - Fine imposed to
company and driver, Port pass withdrawn until the driver’s
company confirms what disciplinary action has been taken.
4th Offence - Port access
withdrawn, driver’s ban incurred for 6 months.
1st Offence - verbal warning.
2nd Offence - Fine imposed to
company and driver, Port access withdrawn until the driver’s company confirms to Port Management what disciplinary action has been taken.
3rd Offence - Port access withdrawn,
driver’s ban incurred for 6 months.
5kph to 10kph
Over the speed limit
1st Offence - verbal warning.
2nd Offence - Fine imposed to
driver, Port access withdrawn until the driver’s company confirms to Port Management what disciplinary action has been taken.
3rd Offence - Fine imposed to
company and driver, Port access withdrawn until the driver’s company confirms to Port Management what disciplinary action has been taken.
4th Offence - Port access
withdrawn, driver’s ban incurred for 6 months.
1st Offence - verbal warning.
2nd Offence - Fine imposed to
driver, Port access withdrawn until the driver’s company confirms to Port Management what disciplinary action has been taken.
3rd Offence - Fine imposed to
company and driver, Port access withdrawn until the driver’s company confirms to Port Management what disciplinary action has been taken.
4th Offence - Port access withdrawn,
driver’s ban incurred for 6 months. Saqr Port Authority – Tariff 2015 Page 22
11kph to
19kph Over the speed limit
1st Offence - Fine imposed to
driver, Port access withdrawn until the driver’s company confirms to Port Management what disciplinary action has been taken.
2nd Offence - Fine imposed to
company and driver, Port access withdrawn until the driver’s company confirms to Port Management what disciplinary action has been taken.
3rd Offence - Port access
withdrawn, driver’s ban incurred for 6 months.
1st Offence - Fine imposed to driver,
Port access withdrawn until the driver’s company confirms to Port Management what disciplinary action has been taken.
2nd Offence - Port access
withdrawn, driver’s ban incurred for 6 months.
20kph + Port access withdrawn, driver’s ban incurred for 6 months.
Port access withdrawn, driver’s ban incurred for 6 months.
Risky Driving (i.e. vehicle transiting whilst trailer is elevated or using mobile phone while driving etc).
1st Offence - Fine imposed to
driver, Port access withdrawn until the driver’s company confirms to Port Management what disciplinary action has been taken.
2nd Offence - Fine imposed to
company and driver, Port pass withdrawn until the drivers
company confirms what disciplinary action has been taken
3rd Offence - Port access
withdrawn, driver’s ban incurred for 6 months.
1st Offence - Fine imposed to
company and driver, Port access withdrawn until the driver’s company confirms to Port Management what disciplinary action has been taken.
2nd Offence - Port access
withdrawn, driver’s ban incurred for 6 months. Dangerous Driving (Driving without attention near vehicles carrying dangerous goods).
1st Offence - Fine imposed to
company and driver, Port access withdrawn until the driver’s company confirms to Port Management what disciplinary action has been taken.
2nd Offence - Fine imposed to
company and driver, Port access withdrawn, permanent ban incurred for driver.
1st Offence - Fine imposed to
company and driver, Port access withdrawn, permanent ban incurred for driver.
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
SAFETY SYSTEM SERVICE CHARGES Service Charges
The provision of Port Safety equipment or professional services shall be charged at a standing rate as detailed below:
Fire extinguisher Per day AED 50.00 Safety Harness Per day AED 50.00 Bunker Safety Approval Per truck AED 150.00 Site Inspection Per Visit AED 100.00 Health & Safety advice Per Issue AED 250.00
Permit Charges
Work requested to be conducted within the Port from a stakeholder or
contractor identified as requiring a formal assessment from the Safety Department shall be charged in accordance with the Marine tariff:
Work Permits Per Permit AED 200.00 (Hot/Cold work, Excavation, Electrical etc.)
Diving permit Per diver per hour AED 600.00 Gas Free Certificate Per Certificate AED 700.00 Confined Space Permit Per Permit AED 200.00
Third Party Training (Tenants, Contractors / Subcontractors)
Safety Induction Per Person AED 100.00 Permit to Work System Per Person AED 100.00 Tool box talk (TBT) for third party Per TBT AED 150.00
Offences / Violation of Safety Regulations
If at any time, Stakeholders, Contractors, visitors are stopped by Port staff for being in breach of the Port’s safety regulations, the following penalties shall be charged.
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015 PPE Offences
1st Offence: Verbal Warning
2nd Offence: AED 100.00
3rd Offence: AED 500.00 + 01 month ban from Port
Unsafe Act
1st Offence: Stoppage of work, rectify and Verbal warning 2nd Offence: AED 250.00
3rd Offence: AED 500.00 + 01 month ban from Port
Poor housekeeping
1st Offence: Stoppage of work, rectify and verbal warning
2nd Offence: AED 500.00
3rd Offence: AED 1000.00
Working Without Permit/ Outside The Scope of Permit
1st offence: Stoppage of work, rectify and verbal warning
2nd Offence: AED 500.00
3rd Offence: AED 1000.00 + 01 month ban from Port
Unsafe Working Condition
1st Offence: Stoppage of work, rectify and verbal warning
2nd offence: AED 500.00
3rd Offence: AED 1000.00 + 01 month ban from Port
Unauthorised Person Operating Equipment / Vehicles
1st Offence: Stoppage of work. Verbal warning to the company
2nd Offence: AED 1000.00
3rd Offence: AED 2000.00 + 06 months ban from Port
Poor Maintenances Of Vehicles, Plants Or Equipment
1st Offence: stoppage of work, rectify and verbal warning 2nd Offence: AED 1000
3rd Offence: AED 2000.00 + 06 months ban from Port
Not Reporting Accident/ Incident
1st Offence: AED 1000.00
2nd Offence: Permanent ban from Port
Arguing with Port Staff and Disregard to Safety Procedures / Instructions
1st Offence: Immediately removed from site and one week ban from Port
2nd Offence: AED 500.00 fine + 02 month ban from Port
3rd Offence: Permanent ban from Port
SAQR PORT AUTHORITY
DETAILS OF RATES AND CHARGES AS FROM 1ST MAY 2015
SECURITY SERVICES AND CHARGES Identity Pass Charges
The following charges will apply to all visitors and contractors who require a pass or identity card for access into the Port Facility, following National Security approval and clearance.
a) Annual (up to one (1) year) AED 120.00 b) Temporary (Max three (3) Months) AED 50.00 c) Daily Visitor (Multiple Entry / One (1) Day) AED 25.00 d) Daily Visitor (Single Entry / One (1) day) AED 5.00 e) Truck Driver (*Annual - “Clearance only”) AED 20.00 f) Lost (replacement) AED 50.00
*Vehicle Pass Charges also applicable on entry.
Vehicle Pass Charges
The following charges will apply to all vehicles that access and transit all gates into and out of Saqr Port Facility.
**Single Entry (5 Hours) **Multiple Entry (24 Hours) a) Car AED 15.00 AED 40.00 b) 3.5 Ton Pick up AED 10.00 AED 20.00 c) 7 Ton Pick up AED 10.00 AED 30.00 d) 2 Axle Truck AED 10.00 AED 40.00 e) Forklift/Bobcat AED 10.00 AED 40.00 f) 3 Axle Truck AED 15.00 AED 50.00 g) Shovel (Loader) AED 15.00 AED 50.00 h) Mobile Crane AED 15.00 AED 50.00
**Overstay charges applicable at single entry rate, per 5 hours or part thereof.
Truck Access & Egress
The following charges will be applied and invoiced as for all Import / Export Cargo. a) 0.16 fils per MT (or part thereof).