• No results found

Calculating the cost of work-related stress and psychosocial risks

N/A
N/A
Protected

Academic year: 2021

Share "Calculating the cost of work-related stress and psychosocial risks"

Copied!
42
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1: Number of claims by sector for health problems associated with work-related stress in Australia for  2003–2005 (median pay-out per case AU$13 100)
Table 3: Health care costs for CVD in the EU countries (in € thousands)

References

Related documents

The content analysis has allowed the identification of the types of reports issued by the insurance companies in the sample (annual reports, social

When (conditional or realised) volatility is calculated from historical time series data, it is estimated for trading days only where there are price observations. There are

So just So just relax into the one that is happening right now and you’ll experience relax into the one that is happening right now and you’ll experience the rest of your life is

According to the Permetest results (Figure 3), bamboo fabric had the highest relative water vapour permeability values due to highest air permeability, lowest fibre fineness

One of the recommendations for working with the file system was to create a series of templates that could easily be copied and pasted to quickly setup a new testing effort.

Once detection is performed, the host machine has sufficient resources to defend against these small volume attacks, provided that it can separate packets that are legitimate from

In chapter 3 , we prove our existence theorem of boosted ground states and traveling solitary waves for focusing ( fNLS ), as well as the existence of symmetric boosted ground

4, upon performing a pairwise comparison of the thumbnail images in the corpus of thumbnail images that have not been marked as being found in the thumbnail image index to determine