• No results found

Request for Proposals: Systems Replacement & Cloud Services. April 19, 2012

N/A
N/A
Protected

Academic year: 2021

Share "Request for Proposals: Systems Replacement & Cloud Services. April 19, 2012"

Copied!
18
0
0

Loading.... (view fulltext now)

Full text

(1)

                           

Request

 

for

 

Proposals:

   

Systems

 

Replacement

 

&

 

Cloud

 

Services

 

 

April

 

19,

 

2012

 

 

 

 

 

American

 

Association

 

of

 

Family

 

&

 

Consumer

 

Sciences

 

400

 

N.

 

Columbus

 

Street

 

Suite

 

202

 

Alexandria,

 

VA

 

22314

 

Phone:

 

703.706.4600

 

   

(2)

Table

 

of

 

Contents

 

 

1  Introduction & Background Information ... 1 

1.1  Existing Support ... 2 

1.2  Existing Systems & Intended Outcomes ... 2 

2  Administrative Requirements ... 4 

2.1  Schedule ... 4 

2.2  Content and Evaluation of Responses ... 4 

2.3  Submittals ... 5 

3  Scope of Work ... 6 

3.1  Conversion‐ Phase 1 ... 6 

3.2  Ongoing support – Phases 2 and 3 ... 6 

4  Requirements ... 9 

4.1  General Requirements ... 9 

4.2  Technical Requirements ... 9 

4.2.1  Conversion & Implementation... 10 

4.2.2  Systems ... 10 

4.2.3  Network ... 10 

5  Pricing ... 11 

Appendices ... 12 

Appendix A – Summary of Existing Systems ... 12 

Appendix B – Technical Details ... 13 

Appendix C – Inventory of Machines ... 16   

(3)

 

1

Introduction

&

Background

Information

 

For more than 100 years, the American Association of Family & Consumer Sciences (AAFCS) has  provided leadership and support to professionals whose work assists individuals, families, and  communities in making informed decisions about their well being, relationships, and resources  to achieve optimal quality of life. 

 

AAFCS is the only professional association for family and consumer sciences (FCS) students and  professionals from both multiple practice settings and content areas. Our members are 

educators, administrators and managers, human service and business professionals, 

researchers, community volunteers, and consultants. They provide research‐based knowledge  about the topics of everyday life, including human development, personal and family finance,  housing and interior design, food science, nutrition and wellness, textiles and apparel, and  consumer issues. 

 

Originally founded in 1909 as the American Home Economics Association, AAFCS today has  more than 6,000 members.  The headquarters of AAFCS is located in Old Town Alexandria, VA,  and has a staff of 15.  Some of the employees work from other locations and do not come to  the office in Virginia at all. 

 

As AAFCS evaluates the future of our information technology systems and support, the  association has determined that it can better support its mission, the membership, and the  staff by replacing the existing computer equipment with up‐to‐date systems that are located  outside the AAFCS office.   

 

Today, the association has a typical set of servers and network equipment in the headquarters  office that have reached the end of life stage.  These servers need to be replaced with current  equipment and software.  Today’s technologies give us an opportunity to improve the services  while at the same time, reducing operating costs and avoiding what would otherwise be a large  capital investment.  AAFCS is already using hosting services for the main web site 

(www.aafcs.org).     

This Request for Proposals is intended to solicit bids for a new set of capabilities that are  “cloud‐based,” which by our definition means that we do not want to have the critical servers  at AAFCS offices.  We understand that the system could be located in a public data center, a  data center privately operated by our selected partner, or completely provided by Software‐as‐ a‐Service (SaaS) functions managed by a single provider.  It is up to you as the bidder to 

propose a responsive solution to our needs.  We are open to a variety of alternatives and  welcome your recommendations. 

(4)

 Avoid single points of failure in our systems; 

 Reduce operating expense and avoid capital investments where practical, as compared  to simply replacing the current arrangement of in‐house systems with new versions of  the same thing; 

 Receive excellent support to both local and remote users;  

 Maintain excellent uptime performance and responsiveness in the systems; and   Improve our ability to absorb a disaster or significant system failure. 

 

1.1

Existing

Support

 

Today, AAFCS is supported by a local IT support services contractor that provides systems  management and on‐site support services.  The existing contractor performs well and there are  no issues with adequacy or responsiveness.   

 

The issue for our organization is simply that the existing systems are old and in need of  replacement, and it makes no sense given today’s technologies to replace the existing servers  with the same in‐house setup.   

 

While we appreciate their service, there is no bias toward the existing contractor, and we are  entering this procurement in search of the best solution for the most reasonable cost.    

1.2

Existing

Systems

&

Intended

Outcomes

 

The current systems are typical for a small association, and more details are listed in the catalog  of systems in Appendix A.  This section summarizes the issues and goals for each functional area  as we look to system replacement. 

 

 Onsite Support ‐ Regardless of the result, we still will need some level of on‐site support,  but we believe this can be reduced to one visit per month of 4 hours, as long as remote  support is available when needed.  The current contractor provides support every other  week for 4 hours per visit.  Much of this time is currently spent in managing the servers.   

 Email system – AAFCS currently uses Exchange 2003 and expects that we will be  upgraded to the most current version of Exchange as part of this procurement.  

Whether the mail system is run at your own data center or through cloud services does  not matter to us as long as system performance is good.  Google Gmail is not a viable  solution for us at this time.  

(5)

 File server – AAFCS currently uses network shares like any typical association.  In the  future, this might be served through a different arrangement, but at this time, we prefer  to duplicate the existing setup to minimize disruption and retraining.  Perhaps in the  future we could entertain replacing the existing file server with SharePoint or something  similar, but we do not want to do that now or in the near future.  Google docs is not a  viable solution for us at this time. 

 

 Membership system – The existing membership system is Protech’s CRM for Members.   We expect to replace this system within the year and are actively involved in the 

selection process for a new system.  As a bidder, your task will be to provide a solution  for taking over support of the existing system without disruption, and then managing  the current system during the process of new system selection.  Once a new system is  selected, you would be expected to transition to the new system, but it may or may not  be hosted by you. 

 

o Database Server – the Protech system currently runs on Microsoft SQL Server  and Microsoft CRM. 

o Sharepoint Server – the Protech system uses Sharepoint for certain member self‐ service functions. 

 

 Accounting system – The accounting system should be moved as is.  No changes are  needed or expected, but it must be accessible by the Protech system for moving  transactions between the two systems.  GreatPlains version 10.0 is the accounting  system and runs in a database on the Microsoft SQL Server. 

 

 Domain Controller – Assuming the new systems are entirely external to AAFCS, we  prefer that a local domain controller be maintained for ease of login and for user  account management. 

 

 Internet connectivity – AAFCS currently has a single connection to the Internet that  combines voice and data.  This line is not at saturation, but we expect that with 

externally hosted systems more bandwidth will be needed.  Also we prefer two circuits  for redundancy.  Therefore, we expect that provisioning an additional Internet circuit  will be included in your proposal. 

 

(6)

2

Administrative

Requirements

 

The intent of this procurement is to have new systems in place and operational in July 2012.   The association has its annual meeting in June and spends a good deal of time in May preparing  for the event.  Our goal is to complete the selection process quickly without disruption to the  organization during the next few months. 

 

2.1

Schedule

 

AAFCS expects to make a selection in early May and implement the new systems setup by July.   If you believe this schedule is not feasible, you may submit an alternative schedule for 

consideration.  Our plans for the selection are as follows:   

April 19  RFP Released  April 27  Questions Due  May 4    Proposals Submitted  May 11  First Cut for Responses  May 18‐22  Presentations by Finalists 

May 28  Selection; Begin Contract Negotiation  June 8    Contract in Place 

July 31   Systems converted and operational   

2.2

Content

and

Evaluation

of

Responses

 

Your response should be complete and provide a level of detail sufficient to allow AAFCS to  understand your offering.  Unnecessarily lengthy proposals are not desired, but proposals that  lack enough detail to provide an understanding of your offering will be rejected. 

 

AAFCS reserves the right to reject any and all responses.  AAFCS will keep the information  confidential but will not return any materials.  Any proprietary information should be so  marked. 

 

AAFCS prefers that you structure your response in the following sections:   

 Executive Summary 

 Understanding of the Need   Scope of Work 

(7)

 Financial Terms & Conditions   Corporate Information 

 References (please provide 3 references for similar work)   Supporting Materials, if any 

   

The evaluation criteria are straightforward.  No scoring system has been planned, but proposals  will be evaluated on the whole of the offering as well as the specific details for: 

 

 Experience in supporting and migrating association membership systems   Experience in systems management & support for association users   Projected 3‐year costs 

 Strength of references   

2.3

Submittals

 

Please respond by April 20 if you intend to submit a proposal.  All correspondence should be  submitted to: 

 

Mr. John Lord 

Director of Operations & Membership 

American Association of Family and Consumer Sciences  400 N. Columbus Street 

Suite 202 

Alexandria, VA 22314  Phone: 703.706.4600  Email:  [email protected]    

We prefer that you submit your proposal and all supporting materials via email.  We reserve  the right to reject submittals that are not received on time and in accordance with the schedule  provided above. 

(8)

3

Scope

of

Work

 

This section explains the intended scope of work, divided among the major phases of work as  we see them now.  You may determine that other phasing better suits your offering, and there  is no restriction to stick to the divisions of work as defined here. 

 

3.1

Conversion

Phase

1

 

Phase 1 will include the work related to moving the systems to a more stable hardware  environment.  All changes needed to accomplish this work should be included.  

 

The current equipment is old and some servers are in danger of failing.  We believe it is best to  simply virtualize the systems as they are so that we mitigate the risk of hardware failure, or  rebuild some or all of the systems on different equipment.  If you prefer a different method,  feel free to propose it.  We do not want to have any servers housed at AAFCS at the end of  Phase 1 except for a domain controller. 

 

During phase 1, you would need to perform whatever prep work is necessary and make your  own assessment of the interactions between the existing systems and the users. 

 

Phase 1 should include standing up the new servers in a data center of your choosing, and  demonstrating that all systems are working correctly.  We do not believe collocating the  existing servers is a viable option.  Dependencies on other vendors throughout the process  should be clearly identified in your proposals. 

  

At the end of Phase 1, all systems should be ready for production operation in the new 

environment.  Your work plan should include a formal handoff or acceptance test for AAFCS to  sign off on to indicate the end of Conversion and beginning of the ongoing support. 

 

3.2

Ongoing

support

Phases

2

and

3

 

Throughout the remainder of the contract, “ongoing support” means management and  operation of all networks, servers, and network equipment, plus end user support for the  AAFCS staff and the workstations they use.  This includes bearing responsibility for coordination  with other vendors and service providers, such as Protech and AppRiver.  Essentially, your firm  will be our single point of contact for IT issues of any type. 

(9)

The telephone system and support of it is not explicitly included, but the telephone shares the  switching fabric currently and therefore you will be expected to provide support to the extent  necessary to coordinate issue resolution with the telephone vendor. 

 

Phase 2 will be the period during which ongoing support is provided up until the time that the  Protech system is replaced.  For purposes of your proposal, you should assume that the  replacement system will be live on January 1, 2013. 

 

For this period of time when AAFCS continues to run the Protech membership system, you will  be expected to provide all support except for direct product support on the Protech system.   AAFCS will maintain a support agreement with Protech during this period and will remain the  point of contact for issues related to Protech systems. 

 

Your proposal should clearly state how you plan to provide:   Remote support 

 Remote management and monitoring   On‐site support 

 Help desk support 

 General systems management   

Note that in summer 2012, AAFCS plans to replace all user workstations with new Dell  equipment and this effort will be executed on a work order under the base contract.   

Phase 3 is defined as ongoing support after the new membership system is operational.  Since  we do not know which membership system will be selected, for purposes of your proposal,  please assume the following: 

 The new membership system will be a cloud‐based service;   A dedicated SQL Server will not be needed; 

 A Sharepoint server will no longer be needed; 

 The Exchange server and all mailboxes will be migrated to a cloud service;   GreatPlains will be replaced with Quickbooks as the accounting system;   An on‐site domain controller will still be needed; and 

 A file server will be needed and may either be a cloud‐based service or a hosted file  server. 

Thereafter, Phase 3 becomes the steady‐state operating environment.  Note that while  Quickbooks will be the new accounting system, it will be necessary to continue running  GreatPlains for some time to provide access to historical data. 

(10)

from the end of Phase 1 through the end of 2012.  Phase 3 will become a one‐year contract  with annual renewals.  You may propose a different timing, in which case you should explain  your rationale. 

(11)

 

4

Requirements

 

4.1

General

Requirements

 

Like any association, AAFCS expects good service with responsive and reliable systems.  We  expect to need some on‐site support, but as time goes on, we expect that more support can be  provided remotely compared to the current arrangement.  Still, some on‐site support will be  needed, and we estimate 4 hours per month of on‐site time is required to attend to user issues  and association‐wide issues that can best be handled in person. 

 

Remote Support should cover the systems 24 x 7, and we expect coverage to be proactive.   Patches to systems should be handled in an automated fashion that does not disrupt normal  operations.  Coverage for remote users should specifically be addressed in your proposal.   

Help desk support should be available for normal working hours that coincide with East Coast  and Midwest users.  During AAFCS’s annual meeting, we would expect your help desk to be  particularly attentive. 

 

Systems must be maintained and available to avoid disruption.  You should state your up‐time  performance guarantees. 

 

Performance reporting is our way of staying abreast of the systems you manage for us.  We  expect a monthly report of operations that details significant events and system performance  using indicators you and we agree are important to measure.  Since the majority of work will be  performed out of sight, we will rely on the monthly report to provide truthful and complete  information, as well as projections to help us anticipate future needs. 

 

4.2

Technical

Requirements

 

Using the information provided in the Appendices, and any other information you feel is  needed to make a determination for your proposal, our goal is to have a set of stable systems  that are cost‐effective and functional.  We understand that the systems in use today will be  quite different from those in use a year from now, and our goal is to have the same or better  level of performance and less cost compared to current performance and costs of operations. 

(12)

4.2.1 Conversion&Implementation  

Conversion of the existing systems can be done during business hours to the extent systems are  not interrupted.  You should pay particular attention to the demands of the membership 

system and find a quiet time when the system can be taken down for maintenance.   

If you believe there is a risk of system failure during the data migration and/or virtualization  process, you should include a plan for risk management in your proposal. 

4.2.2 Systems

 

The Protech membership system has four elements that are tightly integrated (web site, CRM,  Sharepoint, and accounting).  Together with email and file/print services, these are the servers  that make up the majority of the scope of work. 

 

The main web site is hosted at Carpathia Hosting and is managed by NewTarget.  There are no  plans for changing this arrangement at all.  All other systems are currently located at AAFCS  offices in Alexandria, VA.   

 

The main web site connects to two other sites, one for donations, and one for member  functions.  The member functions are handled by the Protech system at AAFCS offices.  While  the main web site will not be changed at all, the URLs for the connected membership functions  must be tested to ensure that they are moved correctly.  The other components of the Protech  system use the SQL Server, the Exchange server, and the GreatPlains accounting system.     

4.2.3 Network

 

The firewall, switch, and Internet circuits will be managed by the winning bidder.  We prefer  that you replace the firewall but leave the switch as is.  The Internet circuits should be 

evaluated and you should provide a recommendation for changes that might be necessary.  We  believe the existing bandwidth is inadequate for a cloud‐based operation. 

 

(13)

 

5

Pricing

 

All expected costs should be clearly identified by the following categories:   

 One‐time costs including all Phase 1 costs 

 Ongoing monthly costs – separate Phase 2 from Phase 3   Annual costs (renewals, etc.) 

 

Any assumptions used in deriving your costs should be clearly explained.  While the evaluation  of costs will be based on a three‐year horizon, we expect to execute a one‐year contract with  two option years, plus Phases 1 through 3.  Please take this into account in your pricing.   

(14)

Appendices

 

 

Appendix

A

Summary

of

Existing

Systems

   

Website (www.aafcs.org)      Hosted by Carpathia Hosting   

Ecommerce Store (for donations)    Hosted by Potomac Digilink   

Internet circuit        XO Communications   

In‐house Systems 

  Email server        Exchange 2003 

  File Server        MS Windows Server 2003    Database Server      MS SQL Server 2003    Web Server        MS IIS 

  Sharepoint Server      MS Sharepoint Services 2003    Domain Controller      MS Windows Server 2003   

Network Equipment 

  Firewall        Cisco ASA 5505    Switches        Cisco Catalyst 2950    Wireless Access Point      

  Router         Cisco 1851   

Telephone System        Pingtone hosted VoIP (no changes planned) 

(15)

 

Appendix

B

Technical

Details

   

ISP: XO Communications    Interface IP: 66.3.238.94   

Firewall:        Cisco ASA 5505   

Main Switch        Cisco Catalyst 2950 Switch 

      48 ports 

      2 VLANs (VLAN 1‐data and VLAN 2‐voice)   

Cisco 1851 Router:      Outside: T‐1 connection for PRI 

      Inside: Fast Ethernet for internal network 

   

Battery Backups:      SmartUPS 2200XL   

DNS HOST:         Registrar: Network Solutions    Ns1.newtarget.net 

  Ns2.newtarget.net   

Spam Filter:        AppRiver 

(16)

Servers: NAME (type) and specifications   

 

AAFCSEXCH:  (Exchange 2003)    HP Proliant ML350    S/N: USM50903YY    P/N: 331891‐001 

  Mail store size:  Private = 61.6GB, Public = 61MB 

  No limits on mailbox size, old emails are archived to PSTs currently from time to time    Largest mailbox = 11.5GB 

  Assume 22 active mailboxes 

  Public folders:  1 master calendar and 4 other public folders 

AppRiver is used for incoming spam control, outbound messages are sent directly to  recipient 

 

EXCHANGE:  (old server – not to be converted)   

AAFCSFSPS: (File Server, DC)    HP Proliant ML350    S/N: USM50903ZV    P/N: 331891‐001   

AAFCSWEB: (WebServer, Sharepoint)    HP Proliant ML350 

  S/N: USM70202JM   

AAFCSSQL: (CRM, Accounting, etc.)    HP Proliant ML370 

  S/N: U5E641N14C    P/N: 379913‐001 

  18 databases , most of which are related to the Protech system    Total active DB space = 33GB currently 

 

AAFCSTERM01: (ESXi Host for terminal server) 

  Runs Terminal Server Guest, used by remote users    Dell PowerEdge R410 

  S/N: B932MN1   

VMAD120: (Phone Voicemail Server)    Dell Optiplex 880 (Phone VLAN)    S/N: BQ4YS11 

(17)

Back‐Up Tape Drive:    ULTRIUM LL1002    S/N: JK00HAY   

(18)

 

Note:  this list does not include machines that are located in remote locations because those  machines are not joined to the Active Directory domain. 

 

Computer Name  DNS Entry  Operating System  Notes 

EXCHANGE  exchange.aafcs.org  Windows 2000 Server  old, not used 

VMAD120  vmad120.aafcs.org  Windows 2000 Server  voice mail server 

AAFCSFSPS  aafcsfsps.aafcs.org  Windows Server 2003  file server 

AAFCSEXCH  aafcsexch.aafcs.org  Windows Server 2003  mail server 

AAFCSTERM  aafcsterm.aafcs.org  Windows Server 2003  terminal server ‐ 

old 

AAFCSSPARE     Windows XP Professional    

AAFCSSQL  aafcssql.aafcs.org  Windows Server 2003  DB server 

AAFCSWEB  aafcsweb.aafcs.org  Windows Server 2003  portal server 

DELLWS01     Windows XP Professional    

ACCOUNTING  accounting.aafcs.org  Windows XP Professional    

DATABASEMANAGER     Windows XP Professional    

DWIGHT  dwight.aafcs.org  Windows XP Professional    

DELLWS‐SD     Windows XP Professional    

ACCCOORDINATOR  acccoordinator.aafcs.org  Windows XP Professional    

MEMCOORD1  memcoord1.aafcs.org  Windows XP Professional    

LENOVO‐4215F3A8  lenovo‐

4215f3a8.aafcs.org 

Windows XP Professional    

CJACKSON‐LAPTOP  cjackson‐laptop.aafcs.org  Windows XP Professional    

1LENOVOG550     Windows XP Professional    

DELLWSCONF     Windows XP Professional    

2DELLE5400  2delle5400.aafcs.org  Windows XP Professional    

AAFCSTERM01  aafcsterm01.aafcs.org  Windows Server 2008 Standard  terminal server   

References

Related documents

In subjects treated with chronic belimumab, we found a significantly greater loss of VH4-34 among mutated IgM sequences compared with unmutated sequences from the same sub-

One area of more profound eastern influence on the practice of Greek religion at the time can only be touched upon: the construction of large altars for

(A) Using a transwell system, primary human brain microvascular endothelial cells (BMECs) were infected with different strains of ZIKV: Honduras (ZIKV-H), Puerto Rico (ZIKV-PR),

R EQUEST F OR P ROPOSALS : P AYROLL S ERVICES

Current banking services include but are not limited to depository services during business banking hours, electronic banking services such as ACH debits and

In addition to personal feedback, they felt that Jing® could also be used to provide generic recordings on language issues before or after assessments, or as part of the

P lease describe how you will attract owner-occupants to these ‘transitional’ neighborhoods, how you will promote the financial incentives that may be available to them, how

The Rochester Joint Schools Construction Board “the RJSCB” solicits proposals from experienced individuals or law firms in response to this Request for Proposals “the RFP” to