Electricity Cost Recovery

y

y

Proposed Amendments to the

National Energy Board Cost Recovery Regulations Cost Recovery Regulations

(2)

Session Agenda

Welcome and Introduction

Proposed Cost Recovery Concept as Approved by the

B d

Board

New Cost Recovery Process

Next Steps Regulatory Process

Next Steps - Regulatory Process

Adjourn at 3:30 p.m.

(3)

NEB Cost Recovery – Concept

Background

The Board regulates in the Canadian public interest within the mandate set by Parliament

F t f th B d’ ll l t

Focus on cost recovery for the Board’s overall regulatory responsibility

Industry’s input was valuable when developing the

Industry s input was valuable when developing the proposed concept

(4)

Background

Commodity charging approach consistent with oil and gas sector of activities

Si l t d l d d i i t

Simple to develop and administer

Equitable approach

(5)

NEB Cost Recovery – Concept

Levy on newly regulated international power line companies

l f 0 2% f j t it l t

levy of 0.2% of project capital costs

Levy on the international power line companies regulated by the NEBy

actual energy transmitted in MW.h (international exports and

imports)

(6)

NEB Cost Recovery – Concept

Company classification and definition:

Small, large and border accommodation categories

U i i ti d fi iti ith i t h

Using existing definition with appropriate changes

Year End Change

NEB cost recovery year will align with the NEB fiscal yeary y g y

(7)

NEB Cost Recovery - Concept

y

p

Proposed Cost Recovery Process Based on the NEB Concept

(8)

Levy on Newly Regulated IPLs

Parallels greenfield fee concept in oil & gas

Payable by IPL companies

not previously regulated by NEB

will apply to new power lines approved by the Board

(9)

Levy on Newly Regulated IPLs

-continued

Set at 0.2% of capital cost as estimated by the Board in issuing the certificate or permit

A li l f tifi t

Applies upon approval of certificate or permit

invoiced after certificate or permit issuedp

payment due 90 days after invoice date

(10)

Cost Recovery from IPLs

The electricity commodity recoverable cost pool will continue to be determined as in the past

P l ill b h d b IPL i t d f l t i it

Pool will now be shared by IPLs instead of electricity exporters

Measurement parameter for sharing costs among IPLs

Measurement parameter for sharing costs among IPLs MW.h transmitted by each regulated IPL (international exports + imports)

(11)

Cost Recovery from IPLs - continued

Recoverable cost pool to be shared by large companies in the proportion that each company’s activity (MW.h

transmitted i e international exports + imports) is to the transmitted – i.e. international exports + imports) is to the aggregate of activity by all large companies

(12)

Cost Recovery from IPLs - continued

The actual pool to be shared by large companies will be determined as follows:

C l l t dit bl t l i t

Calculate commodity recoverable cost pool using present

methodology

Deduct: Fees levied in the year on newly regulated IPLs

Deduct: Annual fixed fees charged to small companies (@ $500

per company)

Deduct: Border accommodations fees (if any)

Equals: Pool of costs to be shared by large IPLs

(13)

Cost Recovery from IPLs - continued

Will now require IPLs to report activity – MW.h transmitted

F t ill i t l d t

For cost recovery, will require aggregate annual data:

forecasts of activity for current and upcoming year

actual activity for previous yeary p y

no averaging

transition into new process to be determined

(14)

Cost Recovery from IPLs - continued

Will continue process of invoicing on an estimated basis for the year

Aft th h d lt ill b dit d

After the year has passed, results will be audited

Adjustments, if any, are factored into next billing cycle

(15)

Company classification

Retain concept of company classification according to size

Implement industry recommendation to use only

2 i l t d t i

2 size-related categories

Intermediate eliminated – leaving small and large categories

categories

Small companies continue to pay fixed fee - $500

Large companies will share in cost pool

(16)

Company classification - continued

Small company will be defined as person transmitting less

than 50,000 MW.h of power in the year

All i i l t d IPL ill b l ifi d l

All remaining regulated IPLs will be classified as large

Border accommodation companies will remain, but

definition will be amended to remove reference to exports definition will be amended to remove reference to exports

(17)

Year End Change Transition Plan

This change will significantly reduce NEB workload

Eliminates an entire year end closing cycle from our h d l

schedule

Will transition by using a 3 month stub period

Appropriate modifications to work calendar will be made

Appropriate modifications to work calendar will be made e.g.:

timing of calls for actual & forecast activity information

timing of billing cycle

timing of audit

(18)

Year End Change Transition Plan

March 31 March 31 2006/07 2007/08 2006 2005 2008 calendar fiscal 2007 2006 2005 2008 calendar 2007

Run a 3 month stub period prorating appropriate factors e.g. fixed fee

Note: The dates used in this graphic are illustrative only. Actual dates will depend on when approval is given for changes to be implemented

December 31 December 31

g

amounts. The next period then coincides with the NEB fiscal year.

Canada

(19)

NEB Cost Recovery – Comment Period

Written comments should be mailed or faxed to the Board by 20 February 2006

C t h ll b dd d t th S t f th

Comments shall be addressed to the Secretary of the Board

(20)

NEB Cost Recovery – Comment Period

The Board will consider and respond to stakeholders written comments

R l ti d fti h ld b i ft th

Regulation drafting process should begin after the comment period is completed

Stakeholders will have other opportunities to comment

Stakeholders will have other opportunities to comment before the promulgation of the regulations

(21)

Examination Pre- Submission I

Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6

Conception and Development Examination by DOJ and PCO Drafting Regulations M P L E M Canada Gazette, Part II Publication Canada Gazette, Part I Final to DOJ, PCO and TB Consultation Interactive process Legal drafting Ministerial and TB approvals M E N T A Comment Period

Phases for Stakeholders Consultations

T I O N

SJC

DOJ: Department of Justice PCO: Privy Council Office TB: Treasury Board

SJC St di J i t C itt SJC: Standing Joint Committee

(22)

Thank you!

y

References

Related documents

To easily collect data from different IS it is necessary to have an exchange standard that fulfills the information needs of the stakeholders of development projects.. The

“Because the Avid editing systems are built on a consistent architecture with the same interface, our students who have mastered Avid Xpress Pro software will easily be able to

If you selected an Oracle database as your Magic xpi internal database, when you click Next in the Database support screen, the Running Scripts screen opens.. In this screen you

if (value equals arr[from]) return true else return false. int mid = ⎣(to + from)/2⎦ // round down if (value

The on-line video distance learning platform used a Learning Management System (LMS) to provide reporting data on which supervisors started, finished and on what dates, as

To set up a Windows ® UEFI operating system under RAID mode, ensure to load the UEFI driver for your optical

In the first version of HeroesX, three trends characterized student pathways through the course: staying on-track, progressing off track, and “shopping.” In Figure 2,

This approximation is the Normal approximation to the Binomial distribution, and it underpins a range of statistical tests and methods, including the calculation of accurate