• No results found

Natural organic matter removal by ion exchange at different positions in the drinking water treatment lane

N/A
N/A
Protected

Academic year: 2020

Share "Natural organic matter removal by ion exchange at different positions in the drinking water treatment lane"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1. The expected variation of dissolved organic carbon (DOC)across the treatment train (based on Baghoth et al., 2009).
Table 3: Total fixed costsInstallation constructionCivil construction
Table 4. Regeneration and waste characteristics of three possiblepositions for the IEX plant in the treatment lane.
Figure 3. Change in NOM fraction concentrations in the diFigure 3: Change in NOM fraction concentrations in the different water and FIXfferent water types by MIEX® and FIX.
+3

References

Related documents

- Dimers with shorter spacers (consisting of 7 and 8 methylene groups) exhibit similar 2D supramolecular structures, two types of differently ordered monolayers

Massey terbukti melakukan pelanggaran hukum terhadap regulasi pertambangan, dengan mengabaikan keselamatan pekerja, menolak untuk melakukan pemasangan ventilasi, dan secara

The High Court held that the $100 minimum charge for pilotage services breached section 27 because it had the purpose and likely effect of substantially lessening

• Rebuild Level 3 practices to include CMMI extensions to process areas that overlap SW-CMM. • Self-assess against the entire

Canadian General asked for rectification of the policy so that instead of stating the effective time of coverage as July 17, 1995, at 12:01 a.m., prior to the accident, the policy

entrepreneurialism, and knowledge of self through cultural pride are hip hops guiding principles. These principles served as a positive code of ethics for youth and the blueprint

The objectives of this study were to: (i) quantify soybean yield loss in a South Dakota field based on Palmer amaranth density, which remained or emerged after POST

Dari pengkajian yang dilakukan maka dapat diambil kesimpulan bahwa proses sistem persedian barang yang berjalan pada RSUP dr.Sitanala masih dikerjakan secara