• No results found

Design of Integrated Monitoring and Early Warning System of Urban Rail Transit Train Running State

N/A
N/A
Protected

Academic year: 2020

Share "Design of Integrated Monitoring and Early Warning System of Urban Rail Transit Train Running State"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1. User requirements of urban rail transit operation enterprise management department
Figure 1. Overall framework of integrated monitoring and early warning.
Figure 2. Technology route of the technology standards and norms system of monitoring and early warning of urban rail train in transit

References

Related documents

The Federal Regulations regarding National Direct/Federal Perkins Student Loans are strictly adhered to so that loan advances, payment processing, delinquent account

In terms of the technology-based perspective, the managers associated knowledge management with various other systems (including data warehousing, enterprise wide systems,

The Reports > Diagnostics > Alarm Status report provides status for the SteelCentral Controller for SteelHead Mobile alarms.. The Mobile Controller tracks key hardware

Workload (High Workload) These outputs will ONLY be generated if the user has checked either of the 'Brain State' check boxes (B-Alert Classification and Workload Classification)

This model when used together with a good definition of the information needs of the user (decision maker) will accelerate his decision making process.. Keywords:

(a) The fabricated KSA slogan shape microstrip patch antenna, (b) Comparison between measured and simulated reflection coefficient.. of the KSA slogan shape

DiUlio addressed the projects, the committee con- need by forming the.Minority ducted a survey of all minority · Student Concerns Committee students regarding race.. Of the