PROBLEM

1. Prepare the necessary journal entries from the following information for Anderson Company, which uses a perpetual inventory system.

a. Purchased raw material on account, $56,700.

b. Requisitioned raw material for production as follows: direct material-80 percent of purchases; indirect material-15 percent of purchases.

c. Direct labor wages of $33,100 are accrued as are indirect labor wages of $12,500. d. Overhead incurred and paid for is $66,900.

e. Overhead is applied to production based on 110 percent of direct labor cost. f. Goods costing $97,600 were completed during the period.

g. Goods costing $51,320 were sold on account for $77,600.

ANS:

a. Raw Material Inventory 56,700

Accounts Payable 56,700

b. Work in Process Inventory 45,360

Manufacturing Overhead 8,505

Raw Material Inventory 53,865

c. Work in Process Inventory 33,100

Manufacturing Overhead 12,500

Wages Payable 45,600

d. Manufacturing Overhead 66,900

Cash 66,900

e. Work in Process Inventory 36,410

Manufacturing Overhead 36,410

f. Finished Goods Inventory 97,600

Work in Process Inventory 97,600

g. Cost of Goods Sold 51,320

Finished Goods Inventory 51,320

Accounts Receivable 77,600

(2)

2. Richards Company employs a job order costing system. Only three jobs-Job #205, Job #206, and Job #207-were worked on during January and February. Job #205 was completed February 10; the other two jobs were still in production on February 28, the end of the company's operating year. Job cost sheets on the three jobs follow:

Job Cost Sheet

Job #205 Job #206 Job #207 January costs incurred:

Direct material $16,500 $ 9,300 $ —

Direct labor 13,000 7,000 —

Manufacturing overhead 20,800 11,200 —

February costs incurred:

Direct materials — 8,200 21,300

Direct labor 4,000 6,000 10,000

Manufacturing overhead ? ? ?

The following additional information is available:

a. Manufacturing overhead is assigned to jobs on the basis of direct labor cost.

b. Balances in the inventory accounts at January 31 were as follows:

Raw Material $40,000

Work in Process ?

(3)

Required:

a. Prepare T-accounts for Raw Material, Work in Process Inventory, Finished Goods Inventory, and Manufacturing Overhead Control. Enter the January 31 inventory balances given previously; in the case of Work in Process Inventory, compute the January 31 balance and enter it into the Work in Process Inventory T-account.

b. Prepare journal entries for February as follows:

1. Prepare an entry to record the issue of materials into production and post the entry to appropriate T-accounts. (In the case of direct material, it is not necessary to make a separate entry for each job.) Indirect materials used during February totaled $4,000. 2. Prepare an entry to record the incurrence of labor cost and post the entry to appropriate

T-accounts. (In the case of direct labor, it is not necessary to make a separate entry for each job.) Indirect labor cost totaled $8,000 for February.

3. Prepare an entry to record the incurrence of $19,000 in various actual manufacturing overhead costs for February (credit Accounts Payable).

(4)

c. What apparent predetermined overhead rate does the company use to assign overhead cost to jobs? Using this rate, prepare a journal entry to record the application of overhead cost to jobs for February (it is not necessary to make a separate entry for each job). Post this entry to appropriate T-accounts.

d. As stated earlier, Job #205 was completed during February. Prepare a journal entry to show the transfer of this job off of the production line and into the finished good warehouse. Post the entry to appropriate T-accounts.

e. Determine the balance at February 28 in the Work in Process inventory account. How much of this balance consists of the cost of Job #206? Job #207?

ANS: a.

Raw Materials

Inventory Work in ProcessInventory

BB 40,000 BB 77,800 29,500 60,700 31,500 20,000 32,000 98,600 Finished Goods

Inventory Overhead ControlManufacturing

BB 85,000 4,000

60,700 8,000 32,000

19,000

b. 1. Work in Process Inventory 29,500 Manufacturing Overhead

Control

(5)

Raw Materials Inventory 33,500

2. Work in Process Inventory 20,000 Manufacturing Overhead Control 8,000 Payroll 28,000 3. Manufacturing Overhead Control 19,000 Accounts Payable 19,000 c. 160%/DL COST$20,000 = $32,000

Work in Process Inventory 32,000

(6)

d. Finished Goods Inventory 60,700

Work in Process Inventory 60,700

e. WIP INV 98,600

Job 206 = $51,300 Job 207 = $47,300

JOB #205 JOB #206 JOB #207

Beg WIP $50,300 $27,500

-Direct Mat 0 8,200 $21,300 Direct Labor 4,000 6,000 10,000 Factory Overhead 6,400 9,600 16,000

$60,700 $51,300 $47,300

(7)

3. The Pittman Company manufactures special purpose machines to order. On January 1, there were two jobs in process, #705 and #706. The following costs were applied to these jobs in the prior year: Job No. 705 706 Direct material $ 5,000 $ 8,000 Direct labor 4,000 3,000 Overhead 4,400 3,300 Total $13,400 $14,300

During January, the following transactions took place:

* Raw material costing $40,000 was purchased on account.

* Jobs #707, #708, and #709 were started and the following costs were applied to them:

JOB

707 708 709

Direct materials $3,000 $10,000 $7,000

Direct labor 5,000 6,000 4,000

* Job #705 and Job #706 were completed after incurring additional direct labor costs of $2,000 and $4,000, respectively

* Wages paid to production employees during January totaled $25,000. * Depreciation for the month of January totaled $10,000.

* Utilities bills in the amount of $10,000 were paid for operations during December. * Utilities bills totaling $12,000 were received for January operations.

* Supplies costing $2,000 were used.

* Miscellaneous overhead expenses totaled $24,000 for January.

Actual overhead is applied to individual jobs at the end of each month using a rate based on actual direct labor costs.

(8)

a. Determine the January overhead rate.

b. Determine the cost of each job.

c. Prepare a statement of cost of goods manufactured.

ANS: a. MOH $4,000 + $10,000 + $12,000 + $2,000 + $24,000 = $52,000 = $2.4762/dl cost $21,000 dl cost b. JOB #705 JOB #706 JOB #707 JOB #708 JOB #709 DM - - $ 3,000 $10,000 $ 1,000 = $ 20,000 DL $ 2,000 $ 4,000 5,000 6,000 4,000 = 21,000 MOH 4,952 9,905 12,381 14,857 9,905 = 52,000 Beg WIP 13,400 14,300 - - - = 27,700 $20,352 $28,205 $20,381 $30,857 $20,905 $120,700 c. Beg WIP $27,700 + DM 20,000 + DL 21,000 + MOH 52,000 - End WIP 72,143 $48,557

(9)

4. The Western Corporation, began operations on October 1. It employs a job order costing system. Overhead is charged at a normal rate of $2.50 per direct labor hour. The actual operations for the month of October are summarized as follows:

a. Purchases of raw material, 25,000 pieces @ $1.20/piece.

b. Material and labor costs charged to production:

Job No. Units Material

Direct labor cost Direct labor hours 101 10,000 $4,000 $6,000 3,000 102 8,800 3,600 5,400 2,700 103 16,000 7,000 9,000 4,500 104 8,000 3,200 4,800 2,400 105 20,000 8,000 3,600 1,800

c. Actual overhead costs incurred:

Variable $18,500

Fixed 15,000

d. Completed jobs: 101, 102, 103, and 104

e. Sales-$105,000. All units produced on Jobs 101, 102, and 103 were sold.

Required: Compute the following balances on October 31: a. Material inventory

b. Work in process inventory

(10)

d. Cost of goods sold

e. Under- or overapplied overhead

ANS: a. $30,000 - ($4,000 + $3,600 + $7,000 + $3,200 + $8,000) = $4,200 b. Job #105 $8,000 + $3,600 + ($1,8002.50) = $16,100 c. Job #104 $3,200 + $4,800 + ($2,4002.50) = $14,000 d. Job # 101 $4,000 + $6,000 + ($3,0002.50) = $17,500 102 $3,600 + $5,400 + ($2,7002.50) = 15,750 103 $7,000 + $9,000 + ($4,5002.50) = 27,250 $60,500 e. Applied 14,400$2.50 = $36,000 Actual 33,500 Overapplied $ 2,500

DIF: Moderate OBJ: 4-4 Steel Company.

Steel Company uses a job order costing system and develops its predetermined overhead rate based on machine hours. The company has two jobs in process at the end of the cycle, Jobs #177 and #179.

Budgeted overhead $100,300

Budgeted machine hours 85,000

Raw material $ 63,000

Labor cost $ 50,000

5. Refer to Steel Company. What amount of overhead is charged to Jobs #177 and #179? Machine hours are split between Jobs #177 and #179-65 percent and 35 percent, respectively. Actual machine hours equal budgeted machine hours.

(11)

ANS:

OH Applied = MH CostPOHR

Job #177: 85,000 MH 65%= 55,250$1.18 = $65,195 Job #179: 85,000 MH35%= 29,750$1.18 = $35,105 DIF: Easy OBJ: 4-4

6. Refer to Steel Company. Fifty-four percent of raw material belongs to Job 17 and 38 percent belongs to Job 179, and the balance is considered indirect material. What amount of raw material used was allocated to overhead as indirect material?

ANS:

54% + 38% = 92%; this means that 8% is indirect or $5,040 (.08$63,000).

DIF: Easy OBJ: 4-4

7. Refer to Steel Co. Labor cost was split 25 percent and 70 percent, respectively, between Jobs #177 and #179 for direct labor. The remainder was indirect labor cost. What are the total costs of Jobs #177 and #179?

ANS: Job #177 Job #179 DM $ 34,020 $23,940 DL 12,500 35,000 MOH 65,195 35,105 $111,715 $94,045

(12)

8. Sanderson Company manufactures custom-built conveyor systems for factory and commercial operations. Erin Smith is the cost accountant for Sanderson and she is in the process of educating a new employee, Heather Fontenot about the job order costing system that Sanderson uses. (The system is based on normal costs; overhead is applied based on direct labor cost and rounded to the next whole dollar.) Lisa gathers the following job order cost records for July:

Direct Direct Total

Job No. Materials Labor Applied OH Cost

667 $ 5,901 $1,730 $ 1,990 $ 9,621

669 18,312 1,810 2,082 22,204

670 406 500 575 1,481

671 51,405 9,500 10,925 71,830

672 9,615 550 633 10,798

To explain the missing job number, Erin informed Heather that Job #668 had been completed in June. She also told her that Job #667 was the only job in process at the beginning of July. At that time, the job had been assigned $4,300 for direct material and $900 for direct labor. At the end of July, Job #671 had not been completed; all others had. Erin asked Heather several questions to determine whether she understood the job order system.

Required: Help Heather answer the following questions:

a. What is the predetermined overhead rate used by ABC Company?

b. What was the total cost of beginning Work in Process inventory?

c. What was total prime cost incurred for the month of July?

d. What was cost of goods manufactured for July?

ANS:

a. Use any job started in July:

Rate = MOH JOB $670 $575 = 115%/DL Cost

(13)

b. DM $4,300 DL 900 FOH 1,035 ($900115%) $6,235 c. Prime Cost =DM + DL DM = $85,639 - 4,300 = $81,339 DL = 14,090 - 900 = 13,190 $94,529 d. COGM = $9,621 + 22,204 + 1,481 + 10,798 = $44,104

(14)

9. Perry Company uses a job order costing system and has the following information for the first week of June:

1. Direct labor and direct materials used:

Job No. Direct Material Direct Labor Hours

498 $1,500 116 506 960 16 507 415 18 508 345 42 509 652 24 511 308 10 512 835 30 Total $5,015 256

2. The direct labor wage rate is $4 per hour.

3. The overhead rate is $5 per direct labor hour.

4. Actual overhead costs for the week, $1,480.

5. Jobs completed: Nos. 498, 506, and 509.

6. The factory had no work in process at the beginning of the week.

Required:

a. Prepare a summary that will show the total cost assigned to each job.

b. Compute the amount of overhead over- or underapplied during the week.

(15)

ANS:

a. Job No. DM DL OH Total

498 $1,500 $ 464 $ 580 $2,544 506 960 64 80 1,104 507 415 72 90 577 508 345 168 210 723 509 652 96 120 868 511 308 40 50 398 512 835 120 150 1,105 $5,015 $1,024 $1,280 $7,319 b. Actual MOH $1,480 Applied MOH 1,280 Underapplied $ 200 c. JOB 507 $ 577 508 723 511 398 512 1,105 Ending WIP $2,803

DIF: Easy OBJ: 4-4

10. You are asked to bring the following incomplete accounts of Andrepont Printing, Inc. up to date through January 31,20X5. Consider the data that appear in the T-accounts as well as additional information given in items (a) through (i).

Andrepont’s job order costing system has two direct cost categories (direct material and direct manufacturing labor) and one indirect cost pool (manufacturing overhead, which is allocated using direct manufacturing labor costs).

Materials Inventory Control Wages Payable Control

12/31/20X4 1/31/20X5

(16)

Manufacturing Department

Work in Process Inventory Control Overhead Control

January 20X5 Charges 57,000

Manufacturing Overhead Control

Finished Goods Inventory Control Cost of Goods Sold

12/31/20X4 Balance 20,000

Additional Information:

a. Manufacturing department overhead is allocated using a budgeted rate set every December. Management forecasts next year's overhead and next year's direct manufacturing labor costs. The budget for 20X5 is $400,000 of direct manufacturing labor and $600,000 of manufacturing overhead.

b. The only job unfinished on January 31, 20X5 is No. 419, on which direct manufacturing labor costs are $2,000 (125 direct manufacturing labor hours) and direct material costs are $8,000.

c. Total material placed into production during January is $90,000. d. Cost of goods completed during January is $180,000.

e. Material inventory as of January 31, 20X5 is $20,000. f. Finished goods inventory as of January 31, 20X5 is $15,000.

g. All plant workers earn the same wage rate. Direct manufacturing labor hours for January totals 2,500. Other labor and supervision totals $10,000.

h. The gross plant payroll on January paydays totals $52,000. Ignore withholdings. All personnel are paid on a weekly basis.

i. All "actual" manufacturing department overhead incurred during January has already been posted.

(17)

a. Material purchased during January b. Cost of Goods Sold during January

c. Direct Manufacturing Labor Costs incurred during January d. Manufacturing Overhead Allocated during January

e. Balance, Wages Payable Control, December 31, 20X4

f. Balance, Work in Process Inventory Control, January 31, 20X5 g. Balance, Work in Process Inventory Control, December 31, 20X4 h. Balance, Finished Goods Inventory Control, January 31, 20X5 i. Manufacturing Overhead underapplied or overapplied for January

ANS: a. $15,000 + Purchases - $20,000 = $90,000. Purchases = $95,000 b. $20,000 + $180,000 - $15,000 = $185,000 c. DL = $2,000 = $16/HR2,500 HRS = $40,000 125 d. $600,000 = 150% DL cost$40,000 = $60,000 $400,000 e. BEGIN + $50,000 - $52,000 = $3,000 BEGIN = $5,000 f. $2,000 + ($2,000150%) + $8,000 = $13,000 g. BEGIN + $90,000 + $40,000 + $60,000 - $180,000 = $13,000 BEGIN = $3,000 h. $20,000 + $180,000 - $185,000 = END = $15,000 i. APPLIED $60,000

(18)

ACTUAL 57,000

$ 3,000 overapplied

(19)

11. Beauty Company manufactures picture frames of all sizes and shapes and uses a job order costing system. There is always some spoilage in each production run. The following costs relate to the current run:

Estimated overhead (exclusive of spoilage) $160,000

Spoilage (estimated) $ 25,000

Sales value of spoiled frames $ 11,500

Labor hours 100,000

The actual cost of a spoiled picture frame is $7.00. During the year 170 frames are considered spoiled. Each spoiled frame can be sold for $4. The spoilage is considered a part of all jobs.

a. Labor hours are used to determine the predetermined overhead rate. What is the predetermined overhead rate per direct labor hour?

b. Prepare the journal entry needed to record the spoilage.

c. Prepare the journal entry if the spoilage relates only to Job #12 rather than being a part of all production runs.

ANS:

a. $160,000 + $25,000 - $11,500 = $173,500 $173,500/100,000 = $1.735 per DLH

b. Disposal Value of Spoiled Work 680

Manufacturing Overhead 510

Work in Process Inventory 1,190 c. Disposal Value of Spoiled Work 680

Work in Process Inventory-Job #12 680

References

Related documents

During the second year, students take one additional course, chosen in consultation with the Track Director and the Program Director, conduct thesis research, and participate in

Tools Instruments Seminar Publication Research Team Tools Information Knowledge IP Customers Peers Textbooks Remote Students Web Content Problems:. • LONG stove pipe • Web

Growth rate of the largest follicle at first wave was higher (P<0.05) in PGT-treated cows compared to control cows, and tended (P<0.01) to be higher in PGT28 than PGT21

Relative change in spectral data for both (C) and each separate session (D) are shown (solid = ASSR parameter time series; dotted = fitted Gauss; darker and lighter grey plot

• Una tasa de interés de 4 % es una elección realista. Además, al evitar la aproximación a los.. Por otro lado, se observa que esta elección de Π significa que la estategia

decumbens (sementes dc origem australiana), durante a estação de seca de 1975, em duas fazendas da região de Rio Verde, Goiás; o surto acometeu principalmente bezerros antes

This study reports on a successful implementation of a low cost innovative mobile phone-based health information system to improve maternal and child care in rural India.. A

prescription drug abuse, collective efficacy, community policing (on college campuses), community-oriented-policing (on college campuses), college drug(s) diversion, and