DC International, In. DC International, Inc. Drilling Rig HSE Manager Drilling Rig Superintendent Drilling Rig.Toolpusher Client Name
Drilling Rig Company Man Personnel 701 Robley Dr Lafayette, LA 70503 United States Location DC International, Inc. Prepared by 8:00 AM 11/7/12 Conducted on Inspection report
DC International Rig Inspection Form DCInt000018DLR
Document No.
Drilling Land Inspection Form
conducted for
In order to maintain the integrity and credibility of the inspection assessment processes and to protect the parties involved, it is understood that the assessors will not divulge to unauthorized persons any information obtained during this risk assessment unless legally obligated to do so.
Confidentiality Statement
The assessors believe the information contained within this inspection report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.
Information on the latest workers compensation and OHS / WHS laws can be found at the relevant State WorkCover / WorkSafe Authority.
DRILLING LAND INSPECTION FORM 1
Disclaimer 2
Confidentiality Statement 2
RIG INSPECTION CHECKLIST 4
DRILLING / LOCATION 4
TRAINING, PPE & GENERAL SAFETY 5
MUD PUMP AREA 8
MUD MIXING AREA 9
MUD TANKS & PITS 10
MATERIAL HANDLING EQUIPMENT 11
ELECTRICAL SPECIFIC INSPECTION 12
GENERATOR AREA 12
FIRE PROTECTION 14
FUEL & OTHER FLAMMABLE LIQUID STORAGE TANKS 15
PIPE RACK AREA 16
BLOW-OUT PREVENTERS 17
All additional questions (1-51) in Section 9 will be used at the discretion of the DCI customer and their individual needs.
18
DERRICK & SUBSTRUCTURE 22
DRILL FLOOR AREA 23
Top Drive 26
Iron Roughneck 27
HOISTING TOOLS, HOOKS, BAILS, ELEVATORS… 27
HOTWORK AND CONFINED SPACES 28
ENVIRONMENTAL 29
STAIRS, LADDERS, HANDRAILS & GUARDRAILS 29
ADDITIONAL FINDINGS 30
Question Response Details
DRILLING / LOCATION
Authorized Personnel Sign posted at entrance to site identifying requirements for hard hat, safety glasses, safety toe
footwear.
non-compliant
No signs at entrance.
No Smoking Area?s Designated & Posted.
non-compliant Need signs for designated areas.
No Parking within 100 ft of the rig.
compliant No one parked within 100 feet with the
exception of the BOP testing equipment. Are H2S controls in place where applicable
including; warning signs, H2S monitors, SCBA(s) or escape air, wind socks and H2S certification training?
N/A
Escape & Guy wires flagged with visible material.
non-compliant
No flagging and no tie wire on shackle. Min 3 clamps with 3 inch spacing
Appendix 1 Appendix 2 Appendix 3
Capacity of guywire anchors verified ? Base Beam Anchor ? Screw-type Anchor ? Permanent (Cement) Anchor ? Other____________ Verification
Method:____________________________
No
No verification or certification tag found.
Outhouse/restroom facility provided. compliant
Hard hats & Safety glasses available for visitors at Tool Pusher/Drilling Foreman's office?
Yes
All temporary housing/offices must be
Housekeeping, Is the area clean and free of
debris and tripping hazards? Yes Distance from overhead power lines GT 10
ft. N/A
Muster area designated and posted?
non-compliant Required signs are not available for area.
Sign posted directing visitors to report to the Drilling Foreman / Toolpusher upon entry, visitors signed in and out?
non-compliant
No signs posted for sign in & out.
TRAINING, PPE & GENERAL SAFETY
Score (32/38) 84.2%First Aid Training provided, minimum of 2
certified per location. compliant H2S Training provided, if applicable compliant
Face shield provided for removing tong
dies with proper tool Yes Any prior incidents, near miss,
observations, etc. if any, are discussed during safety meeting
Yes
No smoking rules observed compliant
Emergency Phone numbers posted
non-compliant
Not in Dog House. Need to place in dog house area. Place inside board area on picture.
Appendix 4
Do Employees know were designated
smoking areas are located? Yes Do employees know were SPCC plan is
located? Yes
Are full body harness and lanyard
inspections being conducted monthly and documented?
non-compliant
Monthly inspection must be done on lanyard and harness. Systems are in good visual shape, no paperwork for monthly inspections kept.
SRL's being inspected monthly and copies
being obtained at location? Yes Rig inspections being performed
Yes HSE inspection being done by HSE
department and kept at office. Pre-spud, periodic, HSE, etc.? Yes
All employees familiar with LOTO
procedures and policies? Yes Safe work permits being used and proper
employees understand how to complete this form?
No
Needs to be performed. No forms being done.
Atmospheric tester available? Yes
Near Miss program being utilized on this
location? Yes Does rig crew know where to dispose of
hazardous waste and are all containers
labeled? (used oil, diapers, etc) Yes
DOT drums are not marked and one drum needs to be emptied and properly disposed of by rig company. Personnel are disposing of product properly in drums.
Appendix 5 Appendix 6
Does the rig crew know how to perform a
BOP Drill? No
Need to have record on location. Need to have (at the minimum) an online copy that can be pulled during inspections.
Are the rig crew training records on site and
current? Yes Are fuel transfer sheets being performed? Yes
Is the escape buggy getting inspected
monthly? No
When rigged up. Documented needs to be done monthly. Currently rigged up with improper clamping.
Is the Confined Space Entry equipment in
good working order? N/A Is the Gas Detector in working order
(charged) and calibrated? Yes How is the general safety culture on this
location? Yes Safety meetings conducted and properly
documented: pre-tour, pre-job/JSAs, weekly?
Yes
Accidents, if any, are discussed during
safety meetings. Yes Proper clothing worn by crew; no loose
clothing or jewelry, hard hat, glasses, safety shoes, gloves, fall protection other PPE as necessary?
Yes
Are designated "Smoking Areas"
established? Are smoking rules observed? No
Needs to be established "Smoking Area" with signs and insure all are following designated area.
Injuries reported and documented
immediately. Yes First Aid Kit/Bloodborne Pathogen Kit
available on site. Yes
At pusher house. Tool pusher knows the incidents when first aid kept in his office. One on rig floor also.
Are all containers properly labeled per
HAZCOM? compliant Are MSDS available and accessible at all
times? compliant
MSDS sheet need to be in shaker area if doors are available. No doors on shaker system. Compliant results good.
Does contractor have a Hazard Recognition
BOP training provided for Pushers and Drillers? Is BOP training documented at the rig?
Yes
Written Contractor Safety Program in
place? Yes
Hearing protection required and provided. compliant
Does the Operator / Drilling Contractor have a New Hire Training Program in place? Explain-Type?
Yes
Yellow for new employee. Green, grey, black, and white for other employee. See Justiss SOP.
Are all injuries and illnesses reported immediately to a supervisor? Are written reports prepared as soon as practical and is every incident involving an injury being investigated and are steps being taken to prevent recurrence?
Yes
Is there an Emergency Response Plan available? Has personnel been trained on the plan?
Yes
MUD PUMP AREA
Score (6/7) 85.7%Is all rotating equipment properly guarded; drive belts, shafts, pony rods, etc.?
non-compliant
Need to use guards on hole open area. Reposition meters if possible.
Appendix 7
Head and valve covers fully bolted. compliant
Shear pin pop-off valve present and
covered. compliant Ends of relief lines secured with adequate
Ends of mud vibrator hose snubbed with
adequate safety cable. compliant Housekeeping - Is area clean and free of
debris and tripping hazards? Yes Adequate lighting provided. compliant
MUD MIXING AREA
Score (10/10) 100.0%Bagged material properly stacked and
protected from the weather? compliant Gloves, Aprons, Boots, or other PPE, as
appropriate, available and in good condition?
compliant
Employees using all required PPE? N/A
Appendix 8
All chemicals are properly labeled including ?PPE Required? warning signs (Grouped or individual signs).
compliant
Personal protective equipment properly maintained and in a clean & sanitary condition.
compliant
Eye wash station and emergency shower; unobstructed and in close proximity, properly designed in good working order and plumed with a clean water supply?
compliant
Adequate ventilation in mud mixing area? compliant
Elevated loading door opening protected? compliant
Housekeeping - Is area clean and free of
debris and tripping hazards? compliant Is the personnel required to mix or handle
mud chemicals being properly trained regarding safe handling and use. Are they aware of the potential hazards and PPE measures required. Are MSDS's available to personnel prior to and during chemical mixing.
Yes
MUD TANKS & PITS
Score (16/18) 88.9%Adequate stairs with handrails properly
secured? compliant Adequate walkways and guardrails. compliant
Guardrails installed on all raised platforms,
walkways, etc above 48?? compliant Walkways free from obstruction and/or
damage? compliant Guardrails provided on crossovers? compliant
?PPE Required? warning signs erected (grouped or individual signs).
non-compliant
Need to be signs on PPE
Appendix 9
Chemical hazard warning signs erected?
non-compliant Needs signs on chemical hazards
Shale shakers, agitator shafts, and all other
rotating equipment properly guarded? compliant Explosion proof equipment, fixtures and
wiring used. Class 1 Div 1/2. Data plates on equipment legible?
Adequate lighting provided? compliant
Employees using all required PPE? N/A
Jetting hoses properly secured if applicable compliant
Personal protective equipment properly
stored? compliant Housekeeping - Is the area clean and free
of debris and tripping hazards? compliant All unused floor holes covered? compliant
Electric wiring in good condition? compliant
Drive belts and shafts guarded? compliant
Permitted and non permitted signage is in
appropriate area's Yes
MATERIAL HANDLING EQUIPMENT
Score (12/14) 85.7%Material Handling Equipment (fork lift)
operators trained and certified? compliant Personnel basket securely attached to
forks? (If applicable). N/A Personnel wearing proper fall protection
while in basket? compliant Backup alarm operational?
non-compliant
No backup alarm on forklift not working. Need fixed.
Appendix 10
Fork Lift equipped with seat belts? compliant
Fork Lift inspected prior to use? (daily).
compliant Every tower, insure all paperwork available
for inspections.
ELECTRICAL SPECIFIC INSPECTION
Are the breakers in the electrical panel
property labeled? Yes Are the electrical panels accessible? (No
boxes, etc. stacked in front of them?) Yes Are the electrical lines in good condition?
(No splices, cuts, black tape: look for things OSHA would look for)
Yes
Are the electrical lines in good condition? (wire no pulled away from the connector, strain relief in place, etc.)
Yes
All power strips in the work area (Doghouse, SCR house, etc.) GFIC
protected? No
Vendor power strips need to be reviewed.Two separate power strips pointed out to Customer. Surge protector strips only, not GFIC strips.
Do all lights have covers and are secure? Yes
Is the equipment on location properly grounded /bonded? (Have RM show you how grounding and bonding is tied into all mobile equipment.
Yes
GENERATOR AREA
Score (18/21) 85.7%Moving parts guarded? compliant
Generators properly grounded? non-compliant
Ground clamp incorrect, hose clamp shown below
Cover panels on electrical control boxes
installed and closed? compliant All electrical controls marked as to their
function and legible? compliant ?HIGH VOLTAGE? warning signs erected? compliant
Insulating mats available at electrical panels?
non-compliant
Not installed Condition of electrical wiring, no splices or
visible damage? compliant Rig wiring properly installed to prevent
abrasion, vehicular and foot traffic, burns, cuts and damage from other sources?
compliant
Unused electrical outlets covered? compliant One in electrical room not covered
Appendix 12
Air compressors properly guarded? compliant
Air storage tanks equipped with pop-off
valve? compliant Lockout/Tagout program utilized?
Adequate Lockout/Tagout devices available?
compliant
?Hearing Protection Required? warning
signs erected? compliant Hearing protection available?
non-compliant
Needs to have box of plugs available. No plugs available in high noise area.
Housekeeping - Is area clean and free of
debris and tripping hazards? compliant Wires are note running along the ground compliant
All light fixtures properly guarded from
damage? compliant Receptacles and plugs in good condition? compliant
Water hose used for washing area kept away from generator skid/SCR/VFD House?
compliant
Generator skid door props properly
pinned? compliant
FIRE PROTECTION
Score (5/6) 83.3%A minimum of 4 No. 20 fire extinguishers with a Class BC rating available at the drill site. This a minimum requirement and operations may dictate use of more or larger sized equipment.
compliant
Fire extinguishers fully charged, current inspection, proper gauges, properly located at their assigned locations?
non-compliant
Tags missing inspection tags. Accumulator system for BOP system. One located in incorrect area as opposed to sign pointing to fire Extinguisher.
Appendix 13
Are crew members familiarized with the location of fire control equipment and trained in the use of such equipment?
Yes
Portable containers for storing flammable liquids should be UL or FM approved or equivalent.
Any area that has flammable containers stored should be posted with a sign, "NO SMOKING OR OPEN FLAME", or
equivalent.
compliant
Spark arrestors or equivalent equipment shall be provided on all internal combustion engine exhausts located within 100' of the wellbore.
N/A
Not within 100 ft of well area
FUEL & OTHER FLAMMABLE LIQUID STORAGE TANKS
Score (16/16) 100.0%Fuel storage tanks properly located compliant
All storage valve connections identified as
to their function compliant Discharge nozzles, hoses, valves in good
condition compliant Piping and fuel lines in good condition compliant
Stationary ladders on storage tanks in good
condition compliant Adequate lighting provided compliant
"Flammable" warning signs erected on all
sides compliant "No Smoking" signs erected on all sides compliant
B/C Class fire extinguisher available and
identified compliant Fuel tanks properly labeled, "NFPA
Haz-Com", "Off Road Usage", "Flammable", "No Smoking"
compliant
Flammable warning signs erected on all
sides compliant "No Smoking" signs erected on all sides compliant
Vapor release vents elevated & away from
ignition sources compliant B/C Class fire extinguisher available and
identified compliant Housekeeping - Is area clean and free of
debris and tripping hazards compliant All open valves/piping capped, bull
plugged, etc. compliant
PIPE RACK AREA
Score (9/9) 100.0%Ends of pipe racks and separate layers of
pipe properly chocked? N/A
Pipe in use at this time Spacers used to separate layers of pipe N/A
Pipe racks are level and stable N/A
Pipe rack catwalk in good condition and at
the same height? N/A V-door slide in good condition including
stops on V-door or catwalk? N/A Derrick stand and ladder in good condition N/A
Adequate lighting provided N/A
Housekeeping - Is area clean and free of
debris and tripping hazards N/A Drilling line from spool elevated off ground
compliant Need to put guard on skid system. Was
previously installed but removed.
Safety Warnings in place for Hydraulic Pipe
Rack and verification of HPR inspection? N/A
Standard system with warnings available
BLOW-OUT PREVENTERS
Score (66/67) 98.5%BOP properly installed, 3rd party tested,
and properly documented? compliant All lines, valves, check valves and flow
fittings should have a working pressure at least equal to the rated pressure of the ram BOP's in use. This equipment will be tested during the initial test of the BOP rams.
compliant
Wheels and stems in place, if automatic
device is not available? compliant BOP stack properly stabilized? compliant
All hydraulic lines connected ? compliant
All unused hydraulic lines capped and
secured? N/A Accumulator bottles labeled with contents,
and other appropriate warning signs? compliant Accumulator valves in appropriate position,
open or closed (never neutral), properly identified both purpose and position?
compliant
Gauges suitable for operating pressure and drilling fluid service should be installed so that drill pipe and annulus pressures may be accurately monitored and readily observed at the station where well control operations are to be conducted.
compliant
Choke manifold and line secured and
accessible? compliant Blooey line with pilot installed if applicable? compliant
Warning signs erected (Flammable, Hard Hat, H2S, Eye Protection, Confined Space, Authorized Personnel)
non-compliant
Signs needs to be displayed . Fire
extinguisher not with proper tag. Black tape on electrical cord and plug need to be replaced.
Appendix 15 Appendix 16
Proper drainage provided and general
housekeeping of koomey and cellar area? compliant
Hydraulic lines protected? compliant Armor core on lines. BOP spare parts (for the service intended)
are carefully stored, maintained and readily available. Including a complete set of ram rubbers, complete set of bonnet or door seals, plastic packing for BOP secondary seals. Ring gaskets to fit end connections. A spare annular BOP packing element and a complete set of seals. A flexible choke or kill line if in use. "Ask Toolpusher"
compliant
Metal clad lines secured with adequate
safety cables? compliant
All additional questions (1-51) in Section 9 will be used at the discretion of the DCI
customer and their individual needs.
Floor mounted and remote accumulator
controls available? Yes Remote unit used to actuate pipe rams
once a week? Yes Off floor controls are effective if floor unit is
destroyed. Yes Alternate power source exists for
accumulator : Type_________________ Yes
Electric, air, and nitrogen bottle accumulator exists
Light on rig floor in plain view of driller? Yes
Operating ranges of accumulator pumps
regulated from 2700 PSI to 3000 PSI? Yes Accumulator pump charging time less than
15 minutes: Ensure 1000 PSI to 3000 PSI rise?
Yes
Accumulator fluid and strainers in good
condition: Inspected_________________ Yes
Tank in front of system that is in good condition. Attached to skid.
Accumulator bottle isolation valve open? Yes
Accumulator pre-charge pressure _______
Last inspected_________ Yes
1500 psi per charge
Accumulator _________ Annular ________
Manifold ________ (Pressures) Yes Accumulator air pressure at least 75 PSI Yes
Drawings available showing BOP stack,
lines, valves and manifold used? Yes Assembly rating greater than or equal to
casing burst pressure or formation breakdown pressure (whichever is less).
Yes
Weco 1502 hammer unions used on
surface casing valves? Yes Necessary manipulations of BOP stack can
be made without going under rig floor? Yes Well can be closed in quickly while
observing and controlling casing pressure? Yes Hydraulic or Manual locks on preventers: If
manual, are hand wheels and shafts attached?
N/A
Clearance for tool joints between pipe rams
Is it possible to pump into well with blind
rams closed? Yes Blind rams equipped with cover but no
lock? Yes
Choke flow line equipped with master
valves on each choke manifold wing? Yes Is the fill up line separate from the kill line? Yes
Choke line straight, free of bends? Yes
Hydraulic choke equipped with emergency
back- up. Type: ____________________ Yes Choke manifold pressure rating __________
Is it correct for this application? Yes
10000 psi front end, 5000 psi on back side Upper Kelly valve or Top Drive Unit with
manual & hydraulic valves? Yes Is drill pipe float used? Yes
Are crossover subs available for IBOP &
TIW? Yes
Canrig Top Drive, subs ready to go.
Pit volume totalizer & recorder mounted in
plain view of driller? Yes Flow indicator available, if flow line can't be
seen from rig floor? Yes Pump stroke counter and/or trip tank for
use in critical hole filling checks? Yes Sufficient way to monitor casing wear? Yes
Maximum allowable surface pressures
upon closing in well specified and posted? Yes Surface casing held in tension until cement
"on bottom" drills held at intervals, timed, &
recorded on IADC? Yes "while tripping" drills held at intervals, timed
& recorded on IADC? Yes "drill collar" drills held at intervals, timed &
recorded on IADC? Yes "out of hole" drills held at intervals, timed &
recorded on IADC? Yes Slow pump rates recorded hourly & after
mud density changes? Yes Pipe slugged with sufficient time allowed
for fluid level to balance before TOOH? Yes Flow checks made prior to TOOH, at the
casing shoe & at collars? Yes During trips are ram-type BOP's operated
and choke and kill valves flushed? Yes Is hole filled continuously from trip tank
(preferred) is there a specified number of stands: __________________
Yes
Rig equipped with trip tank? Yes
Written trip records kept by crew? Yes
Crew instructed in procedures during trip if
swabbing or lost circulation occurs? Yes Are approved kill sheets used & updated
daily? Yes
Leakoff pressure recalculated & posted
after every mud density change? Yes Maximum allowable mud density posted? Yes
DC, DP, hole & mud pump capacity figures
DERRICK & SUBSTRUCTURE
Score (27/27) 100.0%Derrick/A-Frame assembly and
substructure pins with keepers in place? compliant Derrick guyed, if applicable. N/A
Condition of guy lines. N/A
Clamps properly installed. N/A
Does the derrick or mast have a name plate permanently attached to the derrick, that includes the manufacturer, model number and serial number, hookload capacity and whether guying is applicable and if so the recommended guying pattern.
compliant
Damage and/or corrosion visible in derrick
and/or substructure? (waste metal). N/A Condition of derrick ladder? Yes
Climb assist device available, in good
condition, adequate number of clamps? Yes Boatswains chair available for hoisting
personnel and utilized when necessary? Yes Full body harness with lanyard available
and in good condition? Yes Fall protection devices in use: Derrick
Board, Crown Section, Backside of derrick (stabber), Substructure?
compliant
"Fall Protection Required" warning signs
erected? compliant Verify that contractor has a Cat. 1,2,3,4
process in place to identify structural issues. The remaining questions are designed to identify any noticeable items from the floor or ground.
Derrick/Tubing boards in good condition? compliant
Guardrails installed on derrick board? compliant
Pipe fingers in good condition, safety
cables attached? compliant Crown guardrails installed? compliant
Crown sheave guards in place? compliant
Safety retainers in use on hinge pins? compliant
Derrick hydraulic system free of leaks? (if
applicable). N/A Dead line properly anchored? compliant
Booms and boom lines in good condition? compliant
Adequate lighting provided? compliant
Drreick free of loose and unnecessary
objects. compliant Derrick emergency escape line properly
installed, Geronimo on line, anchored with a clear path?
compliant
Tubulars, Drill Pipe, etc racked or hung in derrick are secured to prevent them from falling?
compliant
Mud standpipe secured, mudhose snubbed
at both ends? compliant Rotary beams and all braces are in good
condition? compliant
DRILL FLOOR AREA
Score (35/39) 89.7%OSHA poster posted in Dog House? No Need fire, ambulance, closes hospital Emergency phone numbers posted in Dog
Safety (stabbing) valve and handle with cross over sub if necessary properly located on floor?
Yes
Remote BOP hydraulic controls
accessible? compliant Rotary floor in good condition? compliant
Rotary chain drive guarded? compliant
All unused floor holes covered with a
secure cover? compliant "Driller at or near controls unless the
drawworks brake has been tied down or securing it with a catch lock, unless the drawworks is equipped with an automatic driller".
Yes
Drillers controls properly labeled/identified? compliant
Pipe slips & Dies in good condition? compliant
Racking floor area in good condition? compliant
V-door gate or net provided and in place?
non-compliant Gate or Net needed
Air hoist lines properly guarded in good condition, line properly laid with functional line guide and brake?
compliant
Cathead friction surface in good condition? N/A
Cathead line divider/grip in good condition? N/A
Catline not worn or kinked? N/A
Kelly cock wrench and safety valve
accessible? N/A Drilling Line in good condition? compliant
Tail rope being used, rigged up correctly
Drawworks properly guarded? compliant
Drill line slip/cut recorded on ton mile
book? compliant Proper lay of drill line and sufficient wraps
left on drum with blocks in down position? (minimum 10 wraps).
compliant
When were the Hydraulic or Hydromatic brakes last serviced and what is the contractor's maintenance schedule?
Safe
Dog knot secure? compliant
Adequate lighting provided? compliant
General housekeeping. compliant
Minimum 2 exits from drill floor doghouse? Yes
Drill floor doghouse doors installed
properly? Yes Drinking water available? compliant
MSDS Station readily available?
non-compliant Need it in the dog house
Life basket/Fire Blanket available compliant Not Factory ends of snub line? compliant
First aid kit available in doghouse? Yes
Non skid material used around rotary? compliant
Guardrails installed along open edges of
drill floor? compliant Tong body and jaws, keepers, counter
weights, snub lines and jerk lines all in good condition?
compliant
Crown-o-Matic device operational, logged on IADC? non-compliant Needs to be on system Appendix 17 Appendix 18
Safety signage posted? Yes
All overhead lights have safety cables? compliant
Top Drive
Score (21/21) 100.0%TD: Guard Bolts. compliant
TD: Blower Motor Mounts. compliant
TD: Oil Cooler Bolts. compliant
TD: Housing To Frame Bolts. compliant
TD: Lube Pump Assembly Mounts. compliant
TD: Guard Deflector. compliant
TD: Link Tilt Cylinder Retainer. compliant
TD: Link Tilt Mount. compliant
TD: Bail Clamp Cylinder Pins. compliant
TD: Lower Link Support Pins. compliant
TD: Spark Arrestor Screen. compliant
TD: Elevator Alarm Targets. compliant
TD: BUW Mounts. compliant
TD: BUW Positioning Cylinder. compliant
TD: BUW Gripper Cylinder. compliant
TD: BUW Slides. compliant
TD: BUW Stabbing Guide. compliant
TD: Tool Joint Clamp(s) & Bolts. compliant
TD: Actuator Valve / Covers. compliant
TD: LWCV Pinion Retainer Bolts. compliant
Iron Roughneck
Score (10/10) 100.0%Iron Roughneck (IR): HPU Showing
2200-2500 psi. N/A IR: Line Control Port 1900-1950 psi. N/A
IR: Hydraulic Lines Not Leaking . N/A
IR: Unit Properly Stored If Not In Use. N/A
IR: Unit Turned Off When Not In Use. N/A
IR: Employees Properly Trained . N/A
IR: Employee Clear Of Unit If Moving. N/A
IR: Unit Has Clear Path For Operating. N/A
IR: Operator Controls Located Properly. N/A
IR: Preventive Maintenance (Daily) . N/A
HOISTING TOOLS, HOOKS, BAILS, ELEVATORS…
Score (8/9) 88.9%Traveling blocks in good condition? compliant
Traveling blocks properly guarded? compliant
Sheave guards in good condition? compliant
Bales and/or links in good condition? compliant
Hoisting hook equipped with safety latch or
equivalent? compliant Crown block assembly secured? compliant
Suspension cables and lifting chains are
grade 8 and tagged?
non-compliant
No tags on cable for Spinner. Cotter pin needs to change on overhead shackle system. See picture on replacement part.
Appendix 19 Appendix 20
Hoisting line inspected daily? Yes
HOTWORK AND CONFINED SPACES
Score (10/10) 100.0%Hot work permitted utilizing customers Hot Work Process which meets minimum industry standards?
N/A
Drilling Foreman trained on customers Hot Work and Confined Space permitting standards?
N/A
Certified welders utilized? N/A
Appropriate protective attire worn for
welding and cutting ops. N/A Helmets with face shields used during
operations? N/A Fire extinguishing equipment available and
fire watch utilized? N/A Confined spaces properly labeled? N/A
Confined Space Entry Permit issued by Drilling Foreman or rig contractor for CS entry?
Permits are completed properly and filed at
the job site? N/A Gas detection devices are available and
calibrated per manufactures specifications? N/A
ENVIRONMENTAL
Score (11/11) 100.0%Sediment migrating off location? N/A
Gullies or ditches forming along location
slopes? N/A
Re-vegetation less than 70%? N/A
BMPs not present on location? N/A
BMPs need maintenance or removal? N/A
Reserve pit free of oil and trash? N/A
Reserve pit liner, good integrity, anchored
properly? N/A Reserve pit has sufficient free board? N/A
Reserve pit fall controls in place? N/A
Secondary containment (berms/ditches)
adequate and maintained? compliant Pipe dope is lead free? compliant
STAIRS, LADDERS, HANDRAILS & GUARDRAILS
Score (7/7) 100.0%Adequate stairs provided off rig, min. of 2
for drill floor? compliant Stairs level, secure with no obstructions? compliant
Adequate handrails provided on stairs with
4 or more risers? compliant Stair treads of uniform size made with
Stair treads free of damaged?
compliant Bottom stair rung on shaker side of catwalk
stairs needs to be repaired. Stairs properly installed and pinned if
required? compliant Guardrails, Midrails, & Toeboards installed
along all open side edges of floors, platforms, etc, 4ft above ground level.
compliant
ADDITIONAL FINDINGS
Score (10/10) 100.0%Other remarks #1 N/A
Other remarks #2 N/A
Other remarks #3 N/A
Other remarks #4 N/A
Other remarks #5 N/A
Other Remarks #6 N/A
Other remarks #7 N/A
Other remarks #8 N/A
Other remarks #9 N/A
Appendix 1 Appendix 2