Process Engineer
Process Engineer
TTododay's enterpay's enterprises rises must comust continuallyntinually
incr
increasease te their prodheir productiviuctivity in oty in order trder too
comp
compete effectivelyete effectively. . This This requires requires sshorthorterer
delivery times, reduced operating costs,
delivery times, reduced operating costs,
optimal utilization of capacities and
optimal utilization of capacities and
opt
optimizimized med materiaaterial and information flow.l and information flow.
At
At the sathe same timme time, total automation, definede, total automation, defined
previously as
previously as the ultthe ultimate imate gogoal, is al, is beingbeing
s
superseuperseded ded by hybridby hybrid, partially au, partially automtomatedated
and therefore flexible production systems.
and therefore flexible production systems.
Ag
Againainsst tt the backhe background oground of compf competition andetition and
workplace s
workplace safetyafety, more , more attention attention must bemust be
paid to t
paid to the people at the workphe people at the workplaclace - ae - a
company's
company's most impomost important cartant capital. pital. In In manymany
cases, cost pressures and overburdened
cases, cost pressures and overburdened
work planning department
work planning departments s lealead td to poo poorlyorly
designed w
designed workporkplaceslaces. . ThisThis, in turn, res, in turn, results inults in
poo
poor wor work performrk performancance and low e and low job job ssatisatisfacfac-
-tion.
tion. MMore than ore than ever ever before, indusbefore, industrialtrial
enterprise
enterprises need planning ts need planning tools with ools with whichwhich
manual and partially automated workplaces
manual and partially automated workplaces
can be d
can be desesigned igned quickly, cosquickly, cost-effectt-effectivelyively,,
reliably and ergo
reliably and ergonomnomicallicallyy..
DEL
DELMMIA ProcesIA Process s Engineer proEngineer provides, throughvides, through
methodically
methodically
s
structured tructured planninplanning,g,
earl
early recognition oy recognition off
pro
process riscess risks, re-useks, re-use
of p
of proven proven processrocesses,es,
traceable changes
traceable changes
and decisions, and
and decisions, and
access to scattered access to scattered process knowledge. process knowledge. Process Engineer is Process Engineer is utiliz
utilized from ed from thethe
conce
conceptptual productual product
design p
design phashase,e,
through the
through the
pre-planni
planning ng and detand detailail
planning
planning sstages uptages up
to t
to the produche productiontion
phase as alternative
phase as alternative
design and
design and
manu-facturing
facturing sscenarioscenarios
mature. The
mature. The
comprehensive
comprehensive
trea
treatment otment of thef the
relationships
relationships
between product,
between product,
pro
procescess as and nd manu-
manu-facturing resource data, including the plant
facturing resource data, including the plant
layout, helps to
layout, helps to avoid pavoid planning mistakes lanning mistakes andand
ob
obtain a precise overview, tain a precise overview, early in theearly in the
pro
procescess, s, of tof the required he required invesinvestmtment costs,ent costs,
prod
Benefits Achieved
Benefits Achieved
Us
Using
ing
Pr
Pro
o
ces
cess
s Engin
Engin
eer
eer
OptOptimizimization ation ofof
Material Flow
Material Flow
•
• RReduction ofeduction of
S
Standard Timtandard Timeses
•
• MModulaodular Prr Productoduct
Concept
Concept
•
• DesDesign forign for
Manufacturing Manufacturing • • FaFasst Productt Product Development Development • • SShort Mhort Maiainn Line Concept Line Concept •
• EfficiEfficient Logisticsent Logistics
•
• High PHigh Productiroductionon
Flexibility
Flexibility
•
• Quality IQuality Impmprovementrovement
• • SSimultaneousimultaneous Engineering Engineering
Results:
Results:
S
Sav
aving
ing
s
s /
/
Benefit
Benefit
s
s
•
• RReduction of Workstationseduction of Workstations
•
• DecreasDecreased Woed Work-In-Prk-In-Progrogresress Is Inventornventoryy
•
• SShortening of hortening of LeLead Timead Time
•
• RReduction of eduction of FlFloor oor SSpacepace
•
• RReduction of Capital aneduction of Capital and Od Operating Costsperating Costs
The PP
The PPR R HUB maps the entHUB maps the entire planning coire planning contentntent
of
of DELDELMMIA ProcesIA Process Es Engineer ngineer and all logand all logical relaical rela-
-tionships between the process, product and
tionships between the process, product and
res
resource dource data.ata.
The PP
The PPR R HUB integHUB integrates the drates the data usata used bed by they the
pro
procescess plannerss planners, manufacturing , manufacturing engineers,engineers,
facility p
facility plannerslanners, industrial eng, industrial engineers andineers and
prod
production plauction plannersnners. . Any iAny item of informationtem of information
that is of significance within the context of
that is of significance within the context of
integrated
integrated prodproduct and puct and procesrocess engines engineering canering can
be fo
be found in tund in the PPhe PPR R HUB data modHUB data model.el.
The PP
The PPR R HUB can be tailored HUB can be tailored to to fitfit
comp
company-sany-specific requirempecific requirements anents andd
documents the planning his
documents the planning history otory of thef the
pro
project. ject. The The 3-tier arch3-tier architectitecture of the ure of the PPPPRR
HUB ena
HUB enables ibles it tt to bo be se scacaled to led to meet tmeet thehe
requirements of enterp
requirements of enterprisrise-widee-wide
deplo
deployment. yment. It It ssuppoupports rts multiplemultiple
concurrent users a
concurrent users and user managemnd user management.ent.
The PPR
The PPR HUB gHUB gives the ives the users insusers instanttant
acc
access ess to to the latest, correct the latest, correct data,data,
elimina
eliminating tting the rishe risk of redundant wk of redundant work orork or
the use of ob
the use of obssolete dolete data.ata.
For more information on
For more information on the PPthe PPRRHub, seHub, see e
page 12.
DELMIA Process Engineer
DELMIA Process Engineer
M
M
eet
eet
s
s Y
Y
our Requirement
our Requirement
s
s fo
fo
r
r
Process
Process
Plannin
Plannin
g
g
•
• PrProvides ovides a sa structured mtructured methodoethodology thatlogy that
sy
systematically leastematically leads to ds to an optan optimalimal
solution b
solution by consiy considering dering all processall process-
-related
related costs acosts and nd analanalyziyzing ng alternativesalternatives
early in the planning stage.
early in the planning stage.
•
• PresPresents a clents a clear view of tear view of the overallhe overall
sy
system pstem performerformance versance versus target us target valuesvalues
during
during all planning pall planning phashaseses..
•
• RReduces riseduces risks by the re-use of proks by the re-use of provenven
processes.
processes.
•
• SSuppupportorts s multmultiple usersiple users, s, shorthorteningening
plannin
planning timg time.e.
•
• OrgOrganianizezes eas each project bch project basased oed on then the
unique s
unique structure of the ptructure of the product,roduct,
processes, resources and plant involved
processes, resources and plant involved
with easily configurable project structure.
with easily configurable project structure.
•
• Customizes Customizes the user interface andthe user interface and
reporting fo
reporting formats rmats to mto meet youreet your
individual requirements.
individual requirements.
•
• PromotPromotes es an ian identdentical ical planningplanning
envi
environment ronment for for all projectsall projects..
•
• PrProvides ovides built-in documentation of tbuilt-in documentation of thehe
planning
planning hishistotoryry..
•
• RReflects aeflects any data chany data change imnge immedmediately foriately for
all users.
all users.
•
• Allows nativAllows native integration we integration with CATIith CATIA A andand
E
ENONOVIVIA A and interfacand interfaces with other CAes with other CADD
and PDM
and PDM ssysystemtemss..
PPR Navigator
PPR Navigator
DELMIA Solution Portfolio for
DELMIA Solution Portfolio for
Processes
Processes
Process Engineer and the PPR HUB can be
Process Engineer and the PPR HUB can be
easily configured and interfaced with a
easily configured and interfaced with a
company's existing IT environment and
company's existing IT environment and
legacy manufacturing supp
legacy manufacturing support ort ssysystemtemss..
Project Structure
Project Structure
The prod
The product, puct, process rocess and resource data canand resource data can
be struct
be structured in tured in the PPhe PPR R NAVIGATORNAVIGATOR
according to company-specific
according to company-specific
require-ment
mentss. . This This guarantees guarantees a a high deghigh degree ofree of
transparency a
transparency and nd consisconsistency and qtency and quick datauick data
acc
access ess during during the entire pthe entire planning cyclanning cycle. le. TheThe
rela
relationshtionships among ips among the the prodproduct, processuct, process
and resource ent
and resource entities are established usingities are established using
the drag and drop techniq
the drag and drop technique. ue. PremisPremises es ofof
the project, for example the Sh
the project, for example the Shift Mift Modelsodels
and the R
and the Ramp Up amp Up of tof the prodhe production, auction, arere
defined
defined in the in the PPPPR NAVIGAR NAVIGATOR and are re-TOR and are
re-use
used d in calculain calculatiotions for capacity, occns for capacity, occupatupationion
and costs.
The manufac
The manufacturing concept turing concept contains rcontains requirements for pequirements for productionroduction
and as
and asssemblyembly, repres, representing an initial modenting an initial model ofel of the future pthe future productionroduction..
The com
The comprehensive, cusprehensive, custotomer-specificmer-specific
configuration capability of DELMIA Process
configuration capability of DELMIA Process
Engineer makes
Engineer makes it pit possossible tible to customize theo customize the
project prop
project propertieserties..
•
• AdAdaptation of aptation of UsUser Interfaer Interface ace andnd
Terminology
Terminology
•
• DerivaDerivation otion of Individuaf Individual Obl Object Tject Typesypes
•
• EaEasy sy CusCustotomization of the Amization of the Appppearancearance ofe of
the Dialogs
the Dialogs
•
• MModificodification ation ofof
attributes, Groups and
attributes, Groups and
Pa
Pages in the Propertges in the Propertyy
Window
Window
The P
The PlantTlantTypeSet is ypeSet is the tthe tempemplate for tlate for thehe
structure and
structure and hierarchies hierarchies in tin the PPhe PPRR
NA
NAVIVIAGATOAGATOR R tree. tree. This This makes makes it poit posssisible toble to
cus
customtomizize the pe the project toroject to
particula
particular r requirementsrequirements
and
and needs. needs. WitWith h the helpthe help
of new
of new attributattributeses, any da, any datata
fields
fields may be added tmay be added to ao a
plantype and can then be
plantype and can then be
filled in with information by
filled in with information by
the users during the
the users during the
planning
planning proprocescesss..
DELMIA Process Engineer
DELMIA Process Engineer
allows the use of s
allows the use of scriptcripts tos to
add add
add additional funcitional functionalitytionality
requested by the customer.
requested by the customer.
These scripts can be
These scripts can be
writt
written by the cusen by the customtomersers
themsel
themselves ves or por provided brovided byy
DEL
DELMMIA. The scriptIA. The scripts cas cann
be
be easeasily writtily written in Ven in Visisualual
Bas
Basic, Jaic, Java or C+va or C+++..
DELMIA PPR NAVIGATOR
DELMIA PPR NAVIGATOR
Accessing Planning Information
Accessing Planning Information
•
• Navigation Through the PPNavigation Through the PPR R HUB to AHUB to Allll
Product, Process and Resource Data
Product, Process and Resource Data
•
• Viewing of Viewing of Product HProduct Hierarchyierarchy, Pr, Processocess
Grap
Graphs and hs and Process TProcess Trees, Resrees, Resourceourcess
(T
(Tooools, Mls, Machines, Sachines, Stattationions, Liness, Lines, Plants), Plants)
•
• RReporting Outpeporting Outputs uts to to MS OfficMS Office, HTe, HTMMLL
or
or
Reporting Templates
Reporting Templates
•
• Libraries for Re-UsLibraries for Re-Use of e of BesBest t PraPracticectice
Solutions
Solutions
•
• PrProject Strucoject Structuringturing
•
• VVersioningersioning
•
• HisHistorytory
•
Process Engineer Begins with
Process Engineer Begins with
the EB
the EBO
O
M
M
and E
and Ends
nds wit
wit
h
h
Achieving Your Production
Achieving Your Production
Targets
Targets
DEL
DELMMIA ProcesIA Process Es Engineer ngineer buildbuilds upons upon
existing CAD data and PDM systems
existing CAD data and PDM systems
through p
through powerful, flexible aowerful, flexible and configurablend configurable
interfaces.
interfaces. The The integintegrations rations to PDMto PDM
s
sysystemtems as are establisre established bhed by the y the high-
high-performance DELMIA PPR LOADER (Part
performance DELMIA PPR LOADER (Part
of
of DS PPDS PPR GATER GATEWAY) sWAY) so bo bills of mills of materaterialsials
and prod
and product strucuct structures atures are impore imported rted andand
sy
synchronchronized directnized directly. ly. It aIt allowllows s specialspecial
s
structtructures aures and atnd attribtributes of various Putes of various PDMDM
s
sysystems to tems to be intbe interpreted erpreted and makes themand makes them
ava
available tilable to to the PPhe PPR HUB in the R HUB in the desireddesired
form.
form. Any 3Any 3D CAD model reD CAD model required isquired is
impo
imported from the CAD srted from the CAD sysystem. tem. DELDELMMIAIA
Proces
Process Es Engineer ngineer can examine tcan examine thehe
planni
planning context from ng context from the point othe point of view off view of
any object type, i.e., product, process or
any object type, i.e., product, process or
res
resource. ource. All asAll associasociated ted data can bedata can be
acc
accesessed. sed. For For example, prodexample, productionuction
pro
procescesses ses and equipand equipment ment usused,ed,
costs, dimensions, volumes and
costs, dimensions, volumes and
marginal planning conditions may
marginal planning conditions may
be directly queried from the
be directly queried from the
pro
product structure. duct structure. SSpecial pecial orgorganizaniza-
a-tio
tional views nal views set up for set up for the dthe desiesiredred
type o
type of plan at the enterprise orf plan at the enterprise or
pro
project level are alsject level are also availao available, foble, forr
example, the "
example, the "Brake Brake SSysystemtems" views" view
in the prod
in the product suct structure.tructure.
Product Evaluation
Product Evaluation
DELMIA PRODUCT EVALUATION
DELMIA PRODUCT EVALUATION
allows y
allows you tou to see prodo see product variantsuct variants..
It suppo
It supports usrts use of variant code of variant codes aes andnd
mathem
mathematically latically logogical expresical expressisionsons
to b
to be ae able to deal with complexble to deal with complex
prod
product uct sstructurestructures..
The result is the possibility to filter the
The result is the possibility to filter the
process, product and resource view on the
process, product and resource view on the
different va
different varianriants of a ts of a prodproduct. uct. AlternativeAlternative
com
compoponents, snents, such as uch as diesel or gdiesel or gasasolineoline
engine
engine versversions, can be ions, can be asassisigned gned jusjust t likelike
variants that are composed of predefined
variants that are composed of predefined
module combinations, e.g., an accumulator
module combinations, e.g., an accumulator
pack restricted for use with the 220-volt
pack restricted for use with the 220-volt
vers
version. ion. The The filtering cofiltering codes des can can either beeither be
loaded
loaded ususing ting the DELMIA PPR he DELMIA PPR LOADLOADER ER oror
entered
entered manuallymanually..
The codes can also be put together as
The codes can also be put together as
"
"cacalcullculation modation modelsels" " that descthat describe a productribe a product
va
varianriant ot or a prodr a product mouct model tdel that precishat preciselyely
fulfills
fulfills the listhe list of st of special pecial features. features. The The momodeldel
als
also serves ao serves as a filter fos a filter for tr the the three standardhree standard
views:
views: proproductduct, proces, process s and resand resource.ource.
DELMIA
DELMIA PRPRODODUCT EVUCT EVALUATIALUATION ON allows theallows the
us
user to view 3D CAD moer to view 3D CAD models dels of the prodof the product.uct.
The 3D CAD
The 3D CAD modmodels els cacan be n be enteredentered
manua
Process & Resource Planning
Process & Resource Planning
Proces
Process Grap
s Grap
h
h
In the Process Graph, shown as a precedence
In the Process Graph, shown as a precedence
grap
graph, the moh, the modules and asdules and asssembembly sly stepteps s ofof
the pro
the product are duct are outoutlined. lined. This This first afirst and snd stilltill
very coarse model of future manufacturing is
very coarse model of future manufacturing is
neutral with regard to the solutions available
neutral with regard to the solutions available
and t
and typically takes ypically takes into into accaccount ount only value-only
value-adding
adding proprocescessses es thothose se that are defthat are defined asined as
indispensable for the product specifications.
indispensable for the product specifications.
The pro
The procescessses aes are intre interlinked erlinked in a simple andin a simple and
intuitive manner as predecessors, successors
intuitive manner as predecessors, successors
and p
and parallarallels aels and nd resresult ult in a proin a procescesss
s
sequence. equence. The processThe processes es can either becan either be
structured hierarchically or combined in
structured hierarchically or combined in
groups. This enables a top-down planning,
groups. This enables a top-down planning,
where a rough overview is
where a rough overview is creacreated, tted, to bo bee
det
detailed laailed later. ter. The The displaying of displaying of thethe
processes as a graphic view makes the
processes as a graphic view makes the
pro
procescess flow eass flow easy to y to understand andunderstand and
communicate.
communicate.
The Process Graph can comprise
The Process Graph can comprise
process-related information in classifying attributes
related information in classifying attributes
that are c
that are compompletely cletely configurable. onfigurable. EsEstimatedtimated
pro
procescess s timtimes es can be entered can be entered and laterand later
upd
updated tated to po precisrecise anae analyslyses es and FMand FMEA-
EA-comp
compatible ratible risisk analyk analysisis cs can be appan be applied.lied.
Ass
Assemblies aemblies and pnd parts from tarts from the prodhe productuct
structure can be as
structure can be asssigned igned to to the pthe processrocesseses
by dra
by dragggging aing and droppnd dropping. ing. PProvenroven
pro
procedures ccedures can be san be stotored in a processred in a process
library for retrieval in planning.
library for retrieval in planning.
Manufacturing Concept
Manufacturing Concept
The Process Graph
The Process Graph is re-used as ais re-used as a
backbone [template?] to create the next
backbone [template?] to create the next
step in
step in the prothe procescess s planning: planning: thethe
M
Manuanufacfacturing Concept. turing Concept. The The objective ofobjective of
the M
the Manufaanufacturing Concept is to get cturing Concept is to get aa
graphical overview of the manufacturing
graphical overview of the manufacturing
sy
sysstem tem that that includes processincludes processes, prodes, productuct
and resources.
and resources.
The M
The Manufacanufacturing turing Concept Concept is is a sa schematicchematic
lay
layout tout that reshat results from mappults from mapping theing the
res
resources to the pources to the process rocess activities. activities. ItIt
includes activities that do not add value
includes activities that do not add value
-the
the tototal of tal of all processall processes aes and resourcesnd resources
that ar
that are ree required for production. quired for production. InIn
addition to machines and workplaces,
addition to machines and workplaces,
too
test positions can be described in detail.
test positions can be described in detail.
The links between the objects are inherited
The links between the objects are inherited
from
from the pthe process rocess grapgraph and new links ch and new links canan
be added.
be added. The The manufamanufacturing conccturing conceptept
includes human res
includes human resource pource planning.lanning.
In t
In the Dhe DELELMMIA PROCESIA PROCESS & RESS & RESOOURCEURCE
PL
PLANANNINNING the pG the planning premlanning premisises es ssuch asuch as
s
shift mhift models, waodels, wage gge groups anroups and dd data forata for
Production Over Time are used in the
Production Over Time are used in the
M
Manuanufacfacturing Concept turing Concept to to evaevalualuate tte thehe
res
resources. ources. In this waIn this wayy, a rough estimate o, a rough estimate off
the cost and efficiency of the Manufacturing
the cost and efficiency of the Manufacturing
Concept
Concepts s can can be dobe done. ne. DELDELMMIA PIA PRROCESOCESSS
& RE
& RESSOOURURCE PCE PLANNLANNING suppoING supports multrts multipleiple
Manufacturing Concepts so the user can do
Manufacturing Concepts so the user can do
s
several alternative concepteveral alternative concepts as and nd ususe te thehe
built-in functiona
built-in functionality to comlity to compare thepare the
concepts to find
concepts to find the mthe most efficiost efficient and cost-ent and
cost-saving alternatives.
saving alternatives.
By working wit
By working with the capacih the capacity pty planlanning inning in
DELMIA PROCESS & RESOURCE
DELMIA PROCESS & RESOURCE
PLANNING, the user gets a graphical view of
PLANNING, the user gets a graphical view of
the processes and resources, either as an
the processes and resources, either as an
overview o
overview or as r as a deta detailed view, aailed view, allowingllowing
efficient and accurate planning.
efficient and accurate planning.
Layout Planning
Layout Planning
The mod
The module DELule DELMMIA LAYIA LAYOUT PLOUT PLANANNINGNING
supports simultaneous engineering of
supports simultaneous engineering of
pro
productduction facilion facilities. ities. The The scschematic layhematic layoutout
from t
from the Mhe Manufaanufacturing Concept is turnedcturing Concept is turned
into a 3D layout and assists in
into a 3D layout and assists in
basic and detail planning of
basic and detail planning of
manual and semi-automated
manual and semi-automated
workplaces
workplaces and entire wand entire workork
systems (resource planning).
systems (resource planning).
Creating the layout in 3D
Creating the layout in 3D
pro
provides more accuracy vides more accuracy thanthan
layouts
layouts created in 2D. created in 2D. As well, As well, 3D3D
layouts are eas
layouts are easier tier to undo understanderstand
and
and can alscan also serve o serve as a as a basis ofbasis of
di
discusscussion. sion. It is It is popossssibible tole to
conduct bo
conduct both gth generaeneral andl and
detailed p
detailed planlanning during ning during eaceachh
s
stagtage of te of the planning phe planning phashase. Bille. Bill
of Resources of layout
of Resources of layout
compo
components is nents is creacreated ted automati-
automati-cally
cally as as compcomponentonents s are aare adddded ted too
the layout and
the layout and inveinvesstmtment roll-upsent roll-ups
are calcula
are calculatedted..
T
To allow o allow the user to the user to quickly createquickly create
cost-effective designs and
cost-effective designs and
opti-mization of layouts, both for stations, lines
mization of layouts, both for stations, lines
and complete work systems, DELMIA
and complete work systems, DELMIA
LAYOUT PLANNING comes with a library of
LAYOUT PLANNING comes with a library of
commo
commonly usnly used med manuanufacfacturing eqturing equipment.uipment.
Y
You can also easily create yoou can also easily create your our own systemwn system
element
elements or use CAD s or use CAD data such as data such as cgr-filescgr-files,,
jt
jt-f-fileiles and s and vrmvrml1l1-f-fililes in es in tthe he layolayoutut. . TheThe
sy
system elemstem elements are sents are stotored in a librred in a libraryary
allowing
allowing their re-use in multiptheir re-use in multiple layle layoutouts s andand
projects.
als
also store do store detaileetailed d writtwritten information abouten information about
the sys
the system tem elementelements in the ds in the databasatabase, se, such asuch as
name, manufacturer and p
name, manufacturer and purchasurchase price.e price.
The areas of u
The areas of use arese are
•
• LaLayout oyout of Production Facf Production Facilitiesilities
•
• DesDesign of tign of the Material Fhe Material Flowlow
•
• LaLayout of yout of WorkplaceWorkplacess
•
• SSelecelection, Dimtion, Dimensensioning and Aioning and Arrangementrrangement
of Operating Materials
of Operating Materials
•
• EvEvaluation of taluation of the Workplace Lahe Workplace Layoutyout
According to
According to ErErgonogonomic Criteriamic Criteria
•
• ArchivArchiving and Documentation of theing and Documentation of the
Planning Results
Planning Results
The most important planning results are
The most important planning results are
•
• Bills Bills of Resof Resources with Aources with Allll
R
Required equired Work SysWork System tem ElementsElements
•
• 2D and 3D Wo2D and 3D Workplace Views rkplace Views andand
Drawings
Drawings
•
• Workplace DimensWorkplace Dimensionsions
•
• FaFacility Lacility Layoutsyouts
The DEL
The DELMMIA LAYIA LAYOUT PLANNOUT PLANNING ING ssuppoupportsrts
the quick, cost-effective design and
the quick, cost-effective design and
optimiza-tio
tion of ergn of ergonomonomically ically ssafe manual aafe manual andnd
partially automated work systems.
partially automated work systems.
Ergonomic Analysis
Ergonomic Analysis
Anthrop
Anthropometometricarical elements hell elements help tp the plannerhe planner
to
to quickly and accurately laquickly and accurately layout yout and evaluaand evaluatete
a
a worworkskstatiotation. n. DELDELMMIA LIA LAYOUT AYOUT PLPLANANNNINGING
has human models of different nationalities,
has human models of different nationalities,
gender a
gender and and anthroponthropomorpmorphic hic data. data. WorkWork
po
possitioitions cns can be created an be created and saand saved.ved.
Ergonom
Ergonomic analyic analyssis ais allows the llows the ususer ter too
•
• Determine tDetermine that Obhat Objects jects cacan be n be RReaceachedhed
•
• Provide VisProvide Vision Field Aion Field Analysnalysisis
•
• CalculaCalculate Mte Maximum Forces aximum Forces and Tand Torqorquesues
•
• PPerform erform NIOSH LiNIOSH Lifting fting AnalyAnalyssisis
•
• ObObtain a Comprehenstain a Comprehensive Workplaive Workplacece
Design Checklist
Design Checklist
Time
Time M
M
eas
eas
urement
urement
Design and
Design and EvEvaluation oaluation of Lean andf Lean and
Flexible Work Sy
Flexible Work Sysstemtems s witwith DELh DELMMIA TIMEIA TIME
MEASUREMENT
MEASUREMENT
S
Sound ound time time measmeasurement burement basased ed on inter-on
inter-nationa
nationally reclly recognized metognized methods (MTMhods (MTM, WF), WF)
contributes significantly to the efficiency of
contributes significantly to the efficiency of
a
a compcompanyany. . The The ususe e of detof detailed methodailed methodss
and design know-how in t
and design know-how in the planninhe planningg
proces
process promos promotes effectes effective and economtive and economicic
planning and execution of manual and
planning and execution of manual and
partially a
M
M
aj
ajor A
or A
dvantages
dvantages of D
of D
E
EL
LM
M
IA
IA
TI
TIM
M
E M
E M
E
EA
A
SUR
S
URE
EM
M
E
EN
N
T
T
•
• Quick aQuick and efficind efficient generation of timeent generation of time
analyses using all common analytical
analyses using all common analytical
procedures
procedures ((MMTM TM and WF)and WF)
•
• RRegisegistration and management oftration and management of
estimated
estimated
and recorded t
and recorded time valueime valuess
•
• CreaCreation otion of usef user-r-defined ddefined data caata cardsrds
•
• CreaCreation otion of usef user-r-defined fodefined formulas rmulas forfor
determ
determining procesining process timess times
•
• DesDesign of useign of user-definer-defined pd print formrint formss
•
• Checking of rules for correctChecking of rules for correctness ness andand
completeness (MTM-1, UAS, MEK, MTM
completeness (MTM-1, UAS, MEK, MTM
s
standard tandard data, WF)data, WF)
•
• High applicaHigh application speed through creationtion speed through creation
of t
of time mime macros acros (library elements) (library elements) andand
us
use oe of analysf analysis tempis templateslates
•
• Data compData compresresssion capability over anyion capability over any
number o
number of data levelf data levelss
•
• SStructured data filing in worktructured data filing in work
processes/workstations
processes/workstations
•
• Flexible seaFlexible search mechanisms usrch mechanisms using ing keykey
word
words s and seaand search pattrch patternserns
•
• Time analysTime analysis directly asis directly associasociated ted witwithh
workstation layout
workstation layout
•
• Automatic updatinAutomatic updating og of time valuf time valueses
•
• EExtensxtensive usive user configuration oer configuration optptionsions
Available Standard Time
Available Standard Time
Methods
Methods
• M • MTTMM o MTM-1 o MTM-1 o MTM-2 o MTM-2 oo SStandard tandard datadata
o UAS o UAS o MEK o MEK o SAM o SAM o o OOffice ffice TTasasksks o
o VisVisual ual InsInspepectioctionn
•
• SStandard timtandard time mete method hod extensextensions aions arere
als
also suppo supportorted in ted in the individhe individual anual analysalysisis
systems.
systems.
•
• Work FWork Facactortor
o
o BlBlock ock MMethodethod
o
o Quick Quick MethodMethod
•
• General Time EGeneral Time Element lement or Time Aor Time Analysnalysisis
M
Modules of any odules of any quality obtained from quality obtained from anyany
source (
source (esestimtimated ated timtimes, proceses, process times,s times,
planning t
planning time elemime elements) ents) are aare acquired cquired andand
managed in this category.
managed in this category.
Work Plans
Work Plans
The creation of work plans is supported in
The creation of work plans is supported in
DELMIA TIM
DELMIA TIME MEASURE MEASUREMENT bEMENT by ay a
"
"ssummary" ummary" feature within a feature within a sstandard timetandard time
met
methodhod. . SSuch such summummaries aries are are usused toed to
represent individual, integrally complete
represent individual, integrally complete
analy
analytical elementtical elements in an overall ss in an overall sequence oequence orr
work p
work planlan..
In addit
In addition, tion, this ahis apppproach sroach serves aerves as a blocks a block
equaliz
equalizer (time-determining ter (time-determining time element)ime element)
and ca
and can generate the won generate the work and textrk and text
instruction sheet - work instructions for the
instruction sheet - work instructions for the
worker - d
worker - direcirectly at the wotly at the worksrkstation.tation.
Moreover, DELMIA TIME MEASUREMENT
Moreover, DELMIA TIME MEASUREMENT
allows the us
allows the user to er to create cuscreate custotom dm data caata cardsrds
for
for quick and easquick and easy integration oy integration of comf company-
pany-specific data.
specific data.
A
A
naly
nalys
sis
is wit
wit
h D
h D
ata Cards
ata Cards
Graphical dat
Graphical data caa cards facilitate qrds facilitate quick anduick and
efficient creation of work sequence
efficient creation of work sequence
descrip-tions for manual and partially automated
tions for manual and partially automated
wo
workstations. rkstations. The desThe desired activity is ired activity is selselectedected
by clicki
by clicking in tng in the data carhe data card wd with tith the mouse,he mouse,
then D
then DELELMMIA TIME MIA TIME MEASEASURUREMENTEMENT
prom
promptpts for the ass for the asssociaociated ted time elementtime element
parameters, such as length of movement.
parameters, such as length of movement.
From the data card element chosen, a
Nesting and control structures enable the
Nesting and control structures enable the
use
user to create highly dynamic r to create highly dynamic formformulasulas. . ItIt
is poss
is possible tible to calculate and po calculate and plan a greatlan a great
numb
number of er of variavariants usnts using oing only a fewnly a few
form
formulasulas. . This This sisimpmplifies lifies data maintenancedata maintenance
and increas
and increases es the qthe quality of tuality of the timhe time data.e data.
Benefits
Benefits
•
• Quick and EfQuick and Efficieficient Generation of Timent Generation of Time
Analyses
Analyses
•
• CreaCreation tion of Userof User-Defined Data Cards-Defined Data Cards
•
• CreaCreation tion of of UsUser-er-Defined Formulas forDefined Formulas for
Det
Determining ermining ProcesProcess s TimesTimes
•
• DesDesign of ign of UsUser-er-Defined Print FormsDefined Print Forms
•
• Checking oChecking of Rf Rules for Accuracy aules for Accuracy andnd
T
Tototality (ality (MMTMTM1, UAS, 1, UAS, MMEKEK, M, MTMTM
S
Standard tandard Data, WF)Data, WF)
complet
complete line with code line with code, se, standardtandard
description, quantity, frequency and time is
description, quantity, frequency and time is
generat
generated. ed. NNaturallyaturally, , useruser-defined time-defined time
element
elements s can be inscan be inserted erted in the sequence ofin the sequence of
operations desc
operations described ribed wherevewherever neededr needed..
A
A
nalys
nalysis
is Bas
Bas
ed
ed
on
on
a 3D Layout
a 3D Layout
When existing 3D workstation layouts are
When existing 3D workstation layouts are
used, instead of working exclusively with data
used, instead of working exclusively with data
cards
cards, DELMIA , DELMIA TIME MTIME MEASEASURUREMENT EMENT cancan
perf
perform qorm quick uick and reliaand reliable analyble analyseses. s. AsAs
virtual workstations, these 3D workstation
virtual workstations, these 3D workstation
graphics c
graphics compompletely represletely represent ent thethe
subsequent real workstation situation in
subsequent real workstation situation in
pro
productduction wition with all esh all esssential features.ential features.
This
This provides unaprovides unambmbiguous documentation iguous documentation ofof
workstation conditions un
workstation conditions underlying the tderlying the timeime
ana
analyslysisis, eliminating t, eliminating the need the need to estimate.o estimate.
The process of analysis based on 3D
The process of analysis based on 3D
wor
workskstattation layouts is ion layouts is ssimpimplele
•
• SSelecelect tt the time element code from the time element code from thehe
data
data
card.
card.
•
• Define the sDefine the starting and end points of thetarting and end points of the
action b
action by mouse clicky mouse clicks s on ton the 3D rephe 3D reprere
sentation.
sentation.
•
• Confirm the sequencConfirm the sequence.e.
A
A
naly
nalys
sis
is wit
wit
h Form
h Form
ulas
ulas
Complex formula constructs can be created
Complex formula constructs can be created
and struc
and structured tured in DELin DELMMIA TIMEIA TIME
M
MEASEASURUREMENT. EMENT. This This is is impimplementlemented byed by
means of structuring
means of structuring elementelements ss such asuch as
•
• Formula Within a Formula Within a FormulaFormula
•
• SSubroutinesubroutines
•
• ""if ... if ... then ... then ... elselse …" e …" Control SControl Structurestructures
•
P P R R O O C C E E S S S S P P L L A A N N N N I I N N G G
D
D
E
E
L
L
M
M
IA P
IA P
R
R
O
O
C
C
E
E
S
S
S
S
E
E
N
N
GIN
GIN
E
E
E
E
R
R
United SUnited Statestates DELDELMIA CorpMIA Corp..
T
Te le l::+ 1 2 4+ 1 2 48 2 68 2 67 9 67 9 69 69 6 5 5 05 5 00 N e w 0 N e w K iK in g Sn g St rt re e te e t
F a
F ax : + 1 2 4x : + 1 2 48 2 6 7 88 2 6 7 85 8 55 8 5 TTr o yr o y, M I 4, M I 48 0 98 0 988
I
Italytaly DELMIA Division ofDELMIA Division of
Dassault Systèm
Dassault Systèmes S.res S.r.l..l.
T
Tel:el:+ 39 011 904+ 39 011 90407 7007 70 SStrtr. T. Torinorino, 43o, 43
Fa
Fax:+ 39 011 9x:+ 39 011 90407 60407 622 100410043 Orbas3 Orbassasanono
United Ki
United Kingdomngdom DELMIA Ltd.DELMIA Ltd.
T
Tel:el:+ 44 15 65 75 11 21+ 44 15 65 75 11 21 VicVictoria Court, Btoria Court, Bexton Rexton Roadoad
Fax
Fax:+ 44 15 :+ 44 15 65 75 11 2365 75 11 23 KnutsKnutsford, Chesford, Cheshirehire
WA16 0PF
WA16 0PF
S
Swedenweden DELMIA ABDELMIA AB
T Te le l::+ 4 6 3 1 + 4 6 3 1 7 27 20 5 8 0 5 8 0 00 0 O l o f A sO l o f A sk lk lu n d su n d sg a t a g a t a 1 41 4 F Fa xa x: + 4: + 46 36 31 81 89 99 96 26 255 B oB ox 9x 91 81 800 40094 Gothenburg 40094 Gothenburg Ja
Japapann DELMIA Japan Ltd.DELMIA Japan Ltd.
T
Te le l::+ 8 1 4 5 4 7+ 8 1 4 5 4 70 8 2 80 8 2 822 D A ID A IN I -N I -U EU EN O B LN O B LD G 9 FD G 9 F,,
Fa
Fax:+ 81 45 x:+ 81 45 470 8470 8283283 3-7-3-7-18 S18 Shin-hin-YYokohaokohama,ma,
Kouhoku-ku,
Kouhoku-ku, YYokohama-shi,okohama-shi,
Kanagawa-ken 222-0033
Kanagawa-ken 222-0033
F
Francrancee DELMIA FranceDELMIA France
T
Tel:el:+ 33 1 55 57 55 + 33 1 55 57 55 61 61 133, B133, Bureaux ureaux de la Collde la Collineine
Fax:+ 33
Fax:+ 33 1 55 1 55 57 55 57 55 60 60 92213 S92213 Saint Cloud Cedexaint Cloud Cedex
Germany
Germany DELDELMIA GmbMIA GmbHH
T
Tel:el:+ + 49 49 711 711 27300 27300 0 0 RaRaiffeisenplatz iffeisenplatz 44
Fax:+ 49
Fax:+ 49 711 27300 599 711 27300 599 70736 Fellbach70736 Fellbach
T
Te le l::+ 4 9 6+ 4 9 61 3 5 1 3 5 9 1 09 1 05 05 0 A m KA m Kü m m eü m m er lr li ni ng 2 4 -g 2 4 -2 6 D2 6 D
Fa
Fax:+ 49 61x:+ 49 6135 91035 9105 995 99 552955294 Boden4 Bodenheimheim
P
PP
P
R
R
Hub
Hub
at a Gla
at a Glance
nce
PP
PPR HubR Hub::
Maps the entire planning content ofMaps the entire planning content of
DELMIA Process Engineer and all
DELMIA Process Engineer and all
logical relationships
logical relationships
•
• Manages prodManages product structuresuct structures,,
product variants and documents
product variants and documents
•
• Guarantees the creaGuarantees the creation otion of af a
companywide distributed database
companywide distributed database
solution with
solution with the PPthe PPR Hub at itsR Hub at its
center
center
•
• SSuppupports adaptation of dorts adaptation of databaseatabase
content to company-specific
content to company-specific
requirements.
requirements.
•
• SSuppupports comports companywide accesanywide access to alls to all
plannin
planning g datadata
•
• Can be integrated in the planningCan be integrated in the planning
and project workflow of the
and project workflow of the
company
company
•
• SSuppupports linking oorts linking of any softwarf any softwaree
solution via programmable
solution via programmable
interfaces
interfaces
•
• SSuppupports links to legacy manufac-orts links to legacy
manufac-turing files and d
turing files and databasesatabases
Advantages for You as the Us
Advantages for You as the User:er:
•
• All users of the PPR Hub work withAll users of the PPR Hub work with
the same up-to-date data
the same up-to-date data
•
• You always see the data view that isYou always see the data view that is
related to your t
related to your tasaskk
•
• Any data change is Any data change is immedimmediatelyiately
reflected fo
reflected for all usersr all users
•
• Costing is always Costing is always based on based on thethe
current data status
current data status
Interested?
Interested?
We will be glad
We will be glad to answer your questions to answer your questions in ain a personal meeting. Please give us a call or personal meeting. Please give us a call or send us an e-mail at [email protected]. send us an e-mail at [email protected].
The PP
The PPR Hub is the dR Hub is the dataata
backbone of the
backbone of the DELDELMIAMIA
solution portfolio for digital
solution portfolio for digital
planning and control of
planning and control of
production