• No results found

Effects of Working Strategy and Duration Variance on Productivity and Work in Process A Simulation-Based Investigation and Oops Game: Cost-Benefits Tradeoff Analysis of Reliable Planning for Construction Activities.

N/A
N/A
Protected

Academic year: 2020

Share "Effects of Working Strategy and Duration Variance on Productivity and Work in Process A Simulation-Based Investigation and Oops Game: Cost-Benefits Tradeoff Analysis of Reliable Planning for Construction Activities."

Copied!
116
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1 – SPL Model with 3 Work Stations
Figure 2 – SPL Model with 5 Work Stations
Table 1- Summary of Results for Productivity Improvement
Figure 5 – Productivity sensitivity in Push Unbalanced systems
+7

References

Related documents

However, the policy also reduced the incentive parties have to reveal collusive activity to the antitrust authority, with two important implications: (i) collusion may be

enterprise business models. c) The case challenges students to consider the impact of business modelling is an activity designed to strategize the use of business models. d) The

Under the random selection mechanism, however, we described the additional role of the incumbent’s strength in securing cheap clients: by reducing the number of clients required

Compared with the projections published in March, GDP growth has been revised slightly upward in 2014 and 2015 since the recent performance of activity and employment has

If we assume that the ship carrying this maize of 14% moisture content and of temperature 25°C passes into a region of colder water, then the outside of the cargo will assume

Map 9 shows that Richmond area schools serving overwhelmingly high shares of black and Latino students are heavily concentrated in communities with the lowest opportunity,

The outcome: the Aisle411 Voice Product Location Assistance (PLA) service, which offers benefits similar to those of high cost mobile apps requiring smart-phones or devices