• No results found

The PROMETRA Program: A Reliable Material Database for Highly Irradiated Zircaloy-4, ZIRLO(TM) and M5(TM) Fuel Claddings

N/A
N/A
Protected

Academic year: 2020

Share "The PROMETRA Program: A Reliable Material Database for Highly Irradiated Zircaloy-4, ZIRLO(TM) and M5(TM) Fuel Claddings"

Copied!
11
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1. PROMETRA main mechanical testing. Geometry
Fig.2. PROMETRA hoop tests on irradiated cladding alloys.
Table 3.  Yield Stress best fit parameters.
Figure 8 exhibits low magnification visual examinations of the 6 cycles M5TMtest temperatures, which show a specific nature of the ring damage near 800°C, with a very weak necking in the broken leg, giving a brittle-like appearance of the failure (figure 9
+4

References

Related documents

This understanding about diversity dynamics can then be used by lecturers and management, to form a different understanding of conscious and unconscious factors

The basic rationale for the CFTC’s proposed rule is based on the recommendations of cooperatives seeking this exemption who claim that they have a unique “member ownership nature

Tujuan kajian ini adalah untuk mengenalpasti kriteria-kriteria perancangan semasa yang digunakan oleh Pihak Berkuasa Tempatan dalam memantau pelaksanaan perumahan GACOS

We have therefore examined to what extent the 1 025 ERDF and ESF instruments used their capital endowment to provide different forms of financial support to final recipients

UNHCR VENDOR REGISTRATION FORM – (Rev. Apr 09) Section 1: Company Details and General Information1. Contact Name

(c) in any advertisement of any kind relating to the carrying on of the business of dealing in motor vehicles or carrying on repair work on motor vehicles or carrying on

Top panel: samples from a MC simulation (gray lines), mean computed over these samples (solid blue line) and zero-order PCE coefficient from the SG (dashed red line) and ST

Since reviewing our experience with blunt renal trauma management from 2002 to 2006, we have abandoned routine early re-imaging for blunt renal injuries of grades I-III and grade