All-in-one Container

Data Center solution

(2)

HUAWEI TECHNOLOGIES CO., LTD. Page 2

All-in-one : Integrated one-stop data center solution

All-in-one configuration and subsystems introduction

Application scenarios and successful stories

(3)

With the rapid

development of

cloud computing

and mobile

Internet business,

the traditional data

center faces many

Challenges

Expansion is limited

Difficult to find a

suitable place

High OPEX

Energy

inefficiency

Difficult to meet the

mobile scene and flexible

expansion needs

Long construction period

Over one or two years commonly

High CAPEX

Large-scale data

center construction

costs of tens of million

(4)

Page 4 HUAWEI TECHNOLOGIES CO., LTD.

Container data center has been widely used

2005 2006

SUN : Black box

SGI :Ice Cube

2007

IBM:PMDC HP: 40’POD

Cisco : UCS

2008 2009 2010 2011

Google: Own use

Microsoft : Own use

Some enterprises have

already used the container

data center:

Huawei launched the IDS

container data center family of solutions

Huawei :Container data center

... …

... …

(5)

 The data center construction standards go unified

TIA-942

The Uptime Institute

Gartner Infrastructure Maturity Model

China GB  ASHRAE  HAVC Cooling power other

 Needs of data center building change:

Infrastructure design needs to be changed in order to support high density computing ;

Using a variety of automated operations, management tools ; Based on the new design to improve the efficient use of

infrastructure such as power and cooling.

Supply-demand balance

planning

of DC resources

Traditional DC-supply Modular design of DC - supply Container DC “future” supply Future DC resource requirement current“ requirement future“ requirement current“ supply

The

modular

concept become an

important trend in the current

data center construction.

The

scalability

of the data center

has also become an important

indicator of the success of data

center construction.

(6)

Page 6 HUAWEI TECHNOLOGIES CO., LTD.

Huawei All-in-one

Complete basic functions

Centralized

cooling / power

distribution

Management

Remote

maintenance

Aseismatic

Waterproof/

lightning proof

Fire fighting

(7)

Low TCO

Fast

deployment

expansion

Flexible

All-in-one

High

reliability

Wide

(8)

Page 8 HUAWEI TECHNOLOGIES CO., LTD.

Fast deployment, put into operation in advance

10-week manufacturing,1-week installation:

Solution simplification, factory prefabricated, shorten

the construction period, do not need room of building

Improve ROI

Compared with the traditional DC, can be put in operation ahead of 1 ~ 2 years.

Easy on site:

only

need place, power

and network

network

power

Data center

Fast deployment Low TCO Flexible expansion Wide adaptability High reliability

(9)

One stop solution meets backup or mobility requirement

One-stop solution:providing the whole infrastructure such as IT racks, cooling system, power supply etc, adopting integrated management system.

Environmental adaptability :adapting high & low temperature district and drought area, passed salty moisture and ocean shipping test.

 Anti-earthquake& anti-vibration: powerful anti- crash and shock absorption system, passed NEBS testing. Supporting working in the transporting way, satisfying military standard of anti-shock, passed 480km testing on 3rd class road.

Satisfying dynamic deployment and moveable scenario such as military, disaster saving, oil, reconnoitering, fieldwork.

Backup system for

(10)

Page 10 HUAWEI TECHNOLOGIES CO., LTD.

Flexible expansion

cluster and stack deployment

transport

Ready to meet

any customer

migration

requirements

Fast deployment Low TCO Flexible expansion Wide adaptability High reliability

(11)

1. Reuse or construct new traditional IDC equipment rooms 2. Deploy in modules and flexibly expand servers

3. Determine the deployment scenario

Warehouse scenario

1. Super-scale stacked cluster deployment.

2. Flexible equipment room pre-installation schemes

3. Modular design, including the UPS, D.G., and cooling equipment.

Awning scenario

1. A complete system

2.Can be deployment quickly 3. Disaster relief and Opera

Outdoor scenario

(12)

Page 12 HUAWEI TECHNOLOGIES CO., LTD.

Internally and externally stable and reliable

Internal Tire 3 design concept

Key components (power supply and cooling) are N + X backup Batteries provide 10 minutes backup

The key components powered by the UPS Three levels lightning protection design

External

High reliability container design

Windproof Can fight against hurricanes in work condition

Seismic 8 degree

Anti-theft

Side door, the compartment door to the installation of security door locks, air conditioning outdoor unit and vents has a good anti-theft design

Waterproof The locks, vents and outlets are all complete waterproof sealed Fast deployment Low TCO Flexible expansion Wide adaptability High reliability

(13)

Low TCO, reducing constructing cost and operating cost

Low OPEX:

Green energy, hot and cold aisles are separated, hot and cold air are

not mixed.

Efficient modular UPS, upgrade the UPS conversion efficiency.

NetEco management system, unified management and maintenance.

Enables remote management, reduce labor costs.

Low CAPEX:

Outdoor applications, the external civil works is simple, just need main

powers and network.

The whole systems are in one box, simple installation and low cost .

Reduce 50%

(14)

HUAWEI TECHNOLOGIES CO., LTD. Page 14

All-in-one : Integrated one-stop data center solution

All-in-one configuration and subsystems introduction

40ft container

20ft container

Management system

Application scenarios and successful stories

(15)

A container integration of all systems , such as cooling, electricity, equipment, etc.;

Cabinet number: 8 IT cabinets +1 UPS cabinet+1 PDF

Cooling method: air-cooled precision air-conditioning, 4 +1 backup;

Power systems: UPS N +1 backup; 10 minutes backup.

Power density: 7.5KW / cabinet (rated);

(16)

Page 16 HUAWEI TECHNOLOGIES CO., LTD.

All-in-one

40ft

):

Compact layout

Four functional areas: air conditioning outdoor unit area, equipment area, battery area, entrance hall.

(17)

Complete cooling and power supply system

This system supports the Africa and Latin America market requirements. Other voltage standard (such as dual FireWire 110V, 480V, etc.) can be used transformers to solve.

Support 2-way power input;

UPS N +1 backup, 40 batteries; backup time is 10 minutes.

Input 380VAC 50Hz/480VAC 60Hz Cooling capacity 12.5kW

Refrigerant R22

Cooling method Air-cooled precious cooling

Backup 4+1

Protection degree LCU:IP20;Outdoor:IP55

(18)

Page 18 HUAWEI TECHNOLOGIES CO., LTD.

All-in-one

40ft

):

Scenes design comprehensive

Scene for high temperature (T3 conditions) , high-density scene (rated power density ≥10KW / rack):

Environment

-45

-55

enclosed water

cycle, can be set in arid area

Cooling system

Air-cooled chilled water,

Double outdoor units

1+1 backup

80KW/unit

Five LCUs

4+1 backup

20KW / unit

MAX cabinets: 8 -10 racks(without UPS)

Average power

11-15KW/rack

rated

Power system

modular UPS

5+1

redundancy

battery backup is 10min

(19)

If operator does not need the ups system, 40 ft All-in-one can also provide ten-cabinets solution.

Cooling system cooled precision

air-conditioning, 4 +1 backup;

MAX cabinets: 10 racks

(20)

HUAWEI TECHNOLOGIES CO., LTD. Page 20

All-in-one : Integrated one-stop data center solution

All-in-one configuration and subsystems introduction

40ft container

20ft container

Management system

Application scenarios and successful stories

(21)

A container integration of all systems , such as

cooling, electricity, equipment, etc.;

Cabinet number: 4 IT cabinets +1 UPS cabinet

Cooling method: air-cooled precision air-conditioning,

2 +1 backup;

UPS systems: UPS 2 +1 backup; 5 minutes backup.

Power density: 7.5KW / cabinet (rated);

Applicable to the environment: -33

-55

;

adapt T3 conditions .

(22)

Page 22 HUAWEI TECHNOLOGIES CO., LTD.

All-in-one

20ft

):

Compact layout

Three functional areas: air conditioning outdoor unit area, equipment area, entrance hall.

Hot and cold aisles are separated.

FM200

AC

AC

(23)

Complete cooling and power supply system

Item parameter

Input Dual power supply

Rated input voltage Three-phase 380VAC

Input voltage range 342V~440VAC

Maximum input current 63A

Typical power consumption 20KW

Three precision air conditioning, power 12.5KW,

2 +1 backup, come with heating humidification

function;

All refrigeration components are set in one

container, easy to deploy and move.

(24)

HUAWEI TECHNOLOGIES CO., LTD. Page 24

All-in-one : Integrated one-stop data center solution

All-in-one configuration and subsystems introduction

40ft container

20ft container

Management System

Application scenarios and successful stories

(25)

NetEco can provide centralized monitoring and integrated management to power, environment and security system. Adopting flexible structure and modular design, NetEco can manage not only single IDC infrastructure, but also several IDC infrastructure

Switch

Switch

CCU CCU CCU CCU

RS485 RS485 RS485 RS485 Modular 1 Modular n NetEco Switch

PDF A/C UPS ATS Cameral Smoke Temp. Water-immersion Access

FE FE

(26)

Page 26 HUAWEI TECHNOLOGIES CO., LTD.

NetEco management function panoramagram

NetEco

Solution

(27)

Smart inform method of warning

Real time equipment monitoring

SMS Email acousto-optic Upper mgt system Display screen

Process of work order mgt

Warning database

 Warning receiving  Relativity analysis  Warning storage  Warning display Accumulate and share of operation experience Guide operation efficiently maintain Assign work order Result feedback Finish confirm

(28)

Page 28 HUAWEI TECHNOLOGIES CO., LTD.

Report management

Template

Plenty of reports template and reports style inside the system

Customized

Support user-defined reports, instrumental operation etc.

Traceable

Support user-defined periodic report by email Support checking by excel, PDF and word format.

Reports & Chart

Prolific presentation such as histogram , pie chart, curve chart

(29)

联动配置

Interact

configuration

Video system Lighting system

Access mgt system will interact with lighting and video system, turn on the light automatically , change the direction of cameral to the warning area , take photo and record when it detects normal punching card or illegal invasion.

A c c e s s mgt s y s tem

access video and lighting interaction Fire extinguish warning and video interaction

Network warning and video interaction Support modification and edition

Interact

demonstration

(30)

HUAWEI TECHNOLOGIES CO., LTD. Page 30

All-in-one : Integrated one-stop data center solution

All-in-one configuration and subsystems introduction

Application scenarios and successful stories

Contents

(31)

Scenarios

Research institute

Digital library

University

Large hospital

Group headquarter

Medium financial institute

Carton center

Data Center Features

Under 100KW ICT power consumption

200-400 server scale(on the basis of 1U server)

40ft All-in-One Container Data Center

(32)

Page 32 HUAWEI TECHNOLOGIES CO., LTD.

Scenarios

Digital library

Hospital

Petroleum

Exploration projects

Film production unit

Disaster relief

Data Center Features

Under 30KW ICT power consumption

20ft container data center

(33)

Benefits for customer

 Sales support is advanced for Xmas, sales increase 14.7%

 Phase-1 system deployment completed in 5 months, put into use before Xmas, shorten over 50% construction period .

Huawei solutions

 As local temperature is relatively low and wind power resource is abundant, Huawei offers chilled-air solution.

 Considering that Christmas is coming soon, 2 sets of system is deployed and put into operation primarily to meet the Xmas demand. Another 2 sets will be added later on, phase by phase .

Customer requirements and challenges

 No. 1 retailer in Russia, occupies 73% market share

 The ordering and logistic system is not able to burden pressure from the large scale business in coming Christmas. Megapolis decide to adopt cloud computing to build a new ordering and logistic system for the coming Xmas festival.

 Traditional data center requires huge investment and very long period to build the infrastructure.

(34)

Page 34 HUAWEI TECHNOLOGIES CO., LTD.

Benefits for customer

 Completes system construction in 6 months, 5 months less than traditional construction method.

 Builds complete backup and disaster tolerant system, promote operation competitiveness.

 Reduces 40% energy OPEX as calculated by 5 years.  Increases 80% storage resources utilization rate.

Huawei solution

 Provides professional data center services and disaster tolerant plan, including consulting and design services.

 Offers a solution of chilled-air type container , combined with highly dependable flywheel UPS power supply container.

 Provides a integrated solution of data migration, backup and remote disaster tolerant

Customer requirements and challenges

 Constructs dependable RDTS(remote disaster tolerant system) quickly, take old storage system in consideration

 Traditional DC construction required huge investment, can not meet budget in a short time

 Local power supply system is not stable

Case 2: Venezuela ANTV data center

Biggest CT in Venezuela-ANTV

(35)

Benefits for customer

 Fast deployed integrated data center, ensure the project going on smoothly.

 Flexible to shift, Sufficiently utilize the investments.

 Increase over 30% density of IT rack than traditional way.

 In response to nation environment protecting appeals , decreases

Huawei solutions

 Provides chilled-air container type integrated solution

 Provides professional consulting & customized service for data center.

 Provides customized production for internal equipment also.

Customer requirements and challenges

 Require fast deployment: complete in 2 months.

 High standard: meets international advance design standard,

green & energy-saving

 Portable: able to move after construction

(36)

Page 36 HUAWEI TECHNOLOGIES CO., LTD.

Benefits for customer

 Expand the data center easily without changing existing equipment room structure.

 Comparing traditional way of construction, save 47% cost.  Sufficiently utilize space (Deploy on existing parking zone.)

Huawei solutions

 Provides an integrated solution of IDC container.

 Provides a independent chilled-air container, lower demands for ground and environment.

 Highest NAS in industry, offers doc storage solution

Customer requirements and challenges

 investments of traditional data center construction is too high  Existing building is difficult to rebuild, not able to meet the

requirement of data center.

 Network multimedia teaching class and network lab is required.

Case 4: Mackenzie University DC-

flexible deployment

(37)

Benefits for customer

 Flexible mobility, meets special demands of field prospecting  Reduce huge infrastructure investments, capable to shift flexibly

with project.

Huawei solutions

 Provides integrated All-In-One IDC solution

 Integrated power system, cooling system and IT equipments into one container.

 Offers a customizing power system design.

Customer requirements and challenges

 Traditional IDC can not meet portable demands in field

prospecting.

 Traditional IDC constructing takes high costs and long period, not

able to meet business requirement

(38)

www.huawei.com

Copyright©2012 Huawei Technologies Co., Ltd. All Rights Reserved.

The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.

Thank you.

References

Related documents

Evolved from an old confidence trick, ‘The Spanish Prisoner’, Advance Fee Fraud is commonly perceived as phenomenon mainly of West Africa, and particularly Nigerian, origin, because

The architectures that are commonly used for Data Center network infrastructure solutions require a mix of high density, high reliability, high performance, flexible design

2 shows four best fitting curves with each chi-square (χ 2 ) value indicating the goodness of the fitting, obtained by the RITS code. This figure also indicates their texture

The Huawei CloudPower IDS1000 series of container data center solutions have been successfully deployed in the Guatemala MIC cloud IDC, the University of Lomé in Togo, a

Then we will explain the se- curity requirements for using the smart devices in enterprise and we will survey the current proposed solutions to manage the security risks; in chapter

English answers: Lesson 2 Using the past and present tense?. VIP: Past tense is something that has

“No appeal taken to the CTA from the decision of the Commissioner of Internal Revenue or the Commissioner of Customs or the Regional Trial Court, provincial, city

al op_svc_s dg Used to obtain the RDS database list and related