A) Contract ID No. : 15HC0131
Contract Name : Cluster 1 - Local Infrastructure Program
Repair/Rehabilitation of Multi-Purpose Buildings at: A) Sagbayan, Bohol
1. Barangay Langtad 2. Barangay Mantalongon B) San Isidro, Bohol
1. Barangay Candungao 2. Barangay Baunos 3. Barangay Abehilan C) Danao, Bohol
1. Barangay San Carlos
Brief Description of Work/Scope of Work (BARANGAY LANGTAD, SAGBAYAN, BOHOL): PART B: EARTHWORKS:
803 - Structure Excavation PART F : CONCRETE WORKS:
900 - Reinforced Concrete PART G : MASONRY WORKS:
506(1) - Masonry Unit (CHB)
PART H : CARPENTRY AND JOINERY WORKS: 1003(d) - Wooden Stairs
PART I : FABRICATED MATERIALS AND HARDWARE
1008 - Aluminum Glass Window (Sliding 2nd Floor Only) PART J : ROOF FRAMING WORKS:
402(2) - Timber Trusses PART K : ROOFING WORKS:
1014 - Pre-painted Metal Sheets PART L : FINISHES
1027 - Cement Plaster Finish
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Brief Description of Work/Scope of Work (BARANGAY MANTALONGON, SAGBAYAN, BOHOL): PART B: EARTHWORKS:
803 - Structure Excavation PART F : CONCRETE WORKS:
August 12, 2015 Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE DISTRICT ENGINEER
Bohol 2nd District Engineering Office Ubay, Bohol
INVITATION TO BID
900 - Reinforced Concrete PART J : ROOF FRAMING WORKS: 402(2) - Timber Trusses PART K : ROOFING WORKS:
1014 - Pre-painted Metal Sheets SPL 1 : PUBLIC TOILET
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 2 - Personal Protective Equipment (PPE), SPL 3 - Safety and Health Personnel, SPL 4 - Project Billboard
Brief Description of Work/Scope of Work (BARANGAY CANMAYA DIOT, SAGBAYAN, BOHOL): PART B: EARTHWORKS:
803 - Structure Excavation PART F : CONCRETE WORKS:
900 - Reinforced Concrete PART J : ROOF FRAMING WORKS:
403 - Metal Structure PART K : ROOFING WORKS:
1014 - Pre-painted Metal Sheets
PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS: 1032(a-3) - Metal Painting
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Brief Description of Work/Scope of Work (BARANGAY CANDUNGAO, SAN ISIDRO, BOHOL): PART B : EARTHWORKS
803 - Structure Excavation PART F : CONCRETE WORKS
900 - Reinforced Concrete includes Footing, Column, Tie Beam, RC Beam, Concrete Slab 2nd Floor & RC Roof Beam
PART G : MASONRY WORKS:
506(1) - Masonry Unit (CHB)
PART H : CARPENTRY AND JOINERY WORKS 1003(a) - Wooden Ceiling
PART I : FABRICATED MATERIALS AND HARDWARE 1010 - Wooden Doors and Windows
PART J : ROOF FRAMING WORKS 402(2) - Timber Trusses PART K : ROOFING WORKS
1014 - Pre-painted Metal Sheets PART L : FINISHES
1027 - Cement Plaster Finish, SPL 1 - Stairways, SPL 2 - Railings PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 3 - Personal Protective Equipment (PPE), SPL 4 - Safety and Health Personnel, SPL 5 - Project Billboard
PART B : EARTHWORKS
803 - Structure Excavation PART F : CONCRETE WORKS
900 - Reinforced Concrete includes Footing, Columns, Tie Beam, RC Beam, Concrete Slab
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Brief Description of Work/Scope of Work (BARANGAY ABEHILAN, SAN ISIDRO, BOHOL) PART B : EARTHWORKS
803 - Structure Excavation PART F : CONCRETE WORKS
900 - Reinforced Concrete includes Footing, Columns, Tie Beam, RC Beam, Concrete Slab (2nd Floor)
PART J: ROOF FRAMING WORKS 402(2) - Timber Trusses
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Brief Description of Work/Scope of Work (BARANGAY SAN CARLOS, DANAO, BOHOL) PART B : EARTHWORKS
803 - Structure Excavation PART F : CONCRETE WORKS
900 - Reinforced Concrete PART J : ROOF FRAMING WORKS
403 - Metal Structure PART K : ROOFING WORKS
1014 - Pre-Painted Metal Sheets
PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS: 1032(a-3) - Metal Painting
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Location of the Contract : Sagbayan, San Isidro and Danao, Bohol Total Approved Budget for
the Contract (ABC) : P 4,933,496.70 Contract Duration : 110 calendar days Cost of Bidding Documents : P 5,000.00 B) Contract ID No. : 15HC0132
Contract Name : Cluster 2 - Local Infrastructure Program
Repair/Rehabilitation of Multi-Purpose Buildings at: A) Trinidad, Bohol
1. Barangay Poblacion B) Bien Unido, Bohol
C) Talibon, Bohol
1. Barangay Burgos D) Ubay, Bohol
1. Barangay Tubog 2. Barangay Bood
Brief Description of Work/Scope of Work (BARANGAY POBLACION, TRINIDAD, BOHOL) PART F : CONCRETE WORKS
900 - Reinforced Concrete PART G : MASONRY WORKS
506(1) - Masonry Unit (CHB)
PART H : CARPENTRY AND JOINERY WORKS 1003(a) - Wooden (Ceiling & Trusses) PART I : FABRICATED MATERIALS AND HARDWARE
1010 - Wooden Doors and Windows
PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032 - Painting Works
SPL 1 - Concrete Paving
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 2 - Personal Protective Equipment (PPE), SPL 3 - Safety and Health Personnel, SPL 4 - Project Billboard
Brief Description of Work/Scope of Work (BARANGAY NUEVA ESPERANZA, BIEN UNIDO, BOHOL)
PART B : EARTHWORKS
803 - Structure Excavation PART F : CONCRETE WORKS
900 - Reinforced Concrete PART J : ROOF FRAMING WORKS
403 - Metal Structure PART K : ROOFING WORKS
1014 - Pre-Painted Metal Sheets
PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Brief Description of Work/Scope of Work (BARANGAY BURGOS, TALIBON, BOHOL) PART B : EARTHWORKS
803 - Structure Excavation PART F : CONCRETE WORKS
900 - Reinforced Concrete PART J : ROOF FRAMING WORKS
403 - Metal Structure PART K : ROOFING WORKS
1014 - Pre-Painted Metal Sheets
PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting
Page 4 of 9
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Brief Description of Work/Scope of Work (BARANGAY TUBOG, UBAY, BOHOL) PART B : EARTHWORKS
803 - Structure Excavation PART F : CONCRETE WORKS
900 - Reinforced Concrete PART J : ROOF FRAMING WORKS
403 - Metal Structure PART K : ROOFING WORKS
1014 - Pre-Painted Metal Sheets
PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Brief Description of Work/Scope of Work (BARANGAY BOOD, UBAY, BOHOL) PART B : EARTHWORKS
803 - Structure Excavation PART F : CONCRETE WORKS
900 - Reinforced Concrete PART J : ROOF FRAMING WORKS
403 - Metal Structure PART K : ROOFING WORKS
1014 - Pre-Painted Metal Sheets
PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Location of the Contract : Trinidad, Bien Unido, Talibon and Ubay, Bohol Total Approved Budget for
the Contract (ABC) : P 3,642,025.86 Contract Duration : 110 calendar days Cost of Bidding Documents : P 5,000.00
C) Contract ID No. : 15HC0133
Contract Name : Cluster 3 - Local Infrastructure Program
Repair/Rehabilitation of Multi-Purpose Buildings at: A) Ubay, Bohol
1. Barangay Pag-asa 2. Barangay Los Angeles 3. Barangay Sentinela
Page 5 of 9
4. Barangay San Isidro 5. Barangay Juagdan 6. Barangay Ilihan
Brief Description of Work/Scope of Work (BARANGAY PAG-ASA, UBAY, BOHOL) PART B : EARTHWORKS
803 - Structure Excavation PART F : CONCRETE WORKS
900 - Reinforced Concrete PART J : ROOF FRAMING WORKS
403 - Metal Structure PART K : ROOFING WORKS
1014 - Pre-Painted Metal Sheets
PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Brief Description of Work/Scope of Work (BARANGAY LOS ANGELES, UBAY, BOHOL) PART B : EARTHWORKS
803 - Structure Excavation PART F : CONCRETE WORKS
900 - Reinforced Concrete PART J : ROOF FRAMING WORKS
403 - Metal Structure PART K : ROOFING WORKS
1014 - Pre-Painted Metal Sheets
PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Brief Description of Work/Scope of Work (BARANGAY SENTINELA, UBAY, BOHOL) PART B : EARTHWORKS
803 - Structure Excavation PART F : CONCRETE WORKS
900 - Reinforced Concrete PART J : ROOF FRAMING WORKS
403 - Metal Structure PART K : ROOFING WORKS
1014 - Pre-Painted Metal Sheets
PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Page 6 of 9
Brief Description of Work/Scope of Work (BARANGAY SAN ISIDRO, UBAY, BOHOL) PART B : EARTHWORKS
803 - Structure Excavation PART F : CONCRETE WORKS
900 - Reinforced Concrete PART J : ROOF FRAMING WORKS
403 - Metal Structure PART K : ROOFING WORKS
1014 - Pre-Painted Metal Sheets
PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Brief Description of Work/Scope of Work (BARANGAY JUAGDAN, UBAY, BOHOL) PART B : EARTHWORKS
803 - Structure Excavation PART F : CONCRETE WORKS
900 - Reinforced Concrete PART J : ROOF FRAMING WORKS
403 - Metal Structure PART K : ROOFING WORKS
1014 - Pre-Painted Metal Sheets
PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard
Brief Description of Work/Scope of Work (BARANGAY ILIHAN, UBAY, BOHOL) PART B : EARTHWORKS
801 - Removal of Structures and Obstructions PART G : MASONRY WORKS
560(1)A - Masonry Unit
PART H : CARPENTRY AND JOINERY WORKS 1003 (a & b) - Wooden Partition/Ceiling PART I : FABRICATED MATERIALS AND HARDWARE
1010 - Wooden Doors and Windows PART L : FINISHES
1018 - Ceramic Tiles
1027 - Cement Plaster Finish
PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a.1) - Painting Works (Masonry Paint)
1032(a.2) - Painting Works (Wooden Paint) PART P : ELECTRICAL WORKS
Works (Perimeter Fence)
PART R : CONSTRUCTION SAFETY AND HEALTH
SPL 4 - Personal Protective Equipment (PPE), SPL 5 - Safety and Health Personnel, SPL 6 - Project Billboard
Location of the Contract : Ubay, Bohol Total Approved Budget for
the Contract (ABC) : P 4,327,712.73 Contract Duration : 110 calendar days Cost of Bidding Documents : P 5,000.00 1. 2. 3. 4. 5. 6. 7.
Interested bidders may obtain further information from the DPWH, Bohol 2nd District Engineering Office, Ubay, Bohol and inspect the Bidding Documents at the address given below from 8:00 A.M. to 5:00 P.M.
A complete set of Bidding Documents may be purchased by interested Bidders from the address given below and upon payment of a non-refundable fee for the Bidding Documents in the amount stated above.
It may also be downloaded free of charge from the website of the Philippine Government Electronic Procurement System (PhilGEPS) and the website of the Procuring Entity, provided that bidders shall pay the fee for Bidding Documents not later than the submission of their bids.
Contract Profile Eligibility Processing will be on September 01, 2015 at 10:00 A.M. Bids must be delivered to the address below on or before September 01, 2015 at 2:00 P.M. at the DPWH Bohol 2ndDistrict Engineering Office, Ubay, Bohol. All bids must be accompanied by a bid security in any of the acceptable forms and in the amount stated in the ITB Clause 18.
Bids will be opened on September 01, 2015 at 2:00 P.M. in the presence of the bidder's representative who choose to attend at the address below. Late bids shall not be accepted.
The DPWH, Bohol 2nd District Engineering Office, Ubay, Bohol, now invites bids for the above-mentioned works description. Completion of the Works is required for the above-stated contract duration. Bidders should have completed within ten (10) years from the date of submission and receipt of bids, a contract similar to the Project. The description of an eligible bidder is contained in the Bidding Documents, particulary, in Section II, Instruction to Bidders.
The DPWH Bohol 2ndDistrict Engineering Office, Ubay, Bohol will hold a Pre-Bid Conference on August 20, 2015_ at 2:00 P.M. at the Conference Room, DPWH Bohol 2nd District Engineering Office, Ubay, Bohol which shall be open only to all interested parties who have purchased the Bidding Documents.
Bidding is restricted to Filipino Citizens/sole proprietorships, partnerships or organizations with at least seventy five (75%) interest or oustanding capital stock belonging to citizens of the Philippines.
The DPWH, Bohol 2nd District Engineering Office, Ubay, Bohol, through the Local Infrastructure Program CY 2015, intends to apply the sum stated above being the Approved Budget for the Contract (ABC) to payments under contract for the above-mentioned contract projects. Bids received in excess of the ABC shall be automatically rejected at bid opening.
Bidding will be conducted through open competitive bidding procedures using non-discretionary pass/fail criterion as specified in the Implementing Rules and Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise known as the "Government Procurement Reform Act".
8.
9.
10. For further information, please refer to:
JUNIBE C. FROILAN Engineer III
OIC-Asst. District Engineer BAC Chairman
Attention: BAC Secretariat
DPWH - Bohol II DEO,Ubay, Bohol Telefax No. (038) 518-8051
Email add: dpwhbohol2@yahoo.com
To bid for this contract, a contractor must submit a Net Financial Contracting Capacity (NFCC) at least equal to ABC and the Original Receipt (OR) for payment of bidding documents before dropping of bids. Bidders shall likewise submit their bids through their duly Authorized Liaison Officers as specified in the Contractor's Information (CI). Submission of Letter of Intent (LOI) is no longer required pursuant to Item C.3 of D.O. 64 S. 2012, dated September 17, 2012.
The DPWH, Bohol 2ndDistrict Engineering Office, Ubay, Bohol reserves the right to accept or reject any bid, to annul the bidding process, and the reject all bids at any time prior to contract award, without thereby incurring any liability to the affected bidder or bidders.
choose to attend at the address below. Late bids shall not be accepted.