A) Contract ID No. : 15HC0131

Contract Name : Cluster 1 - Local Infrastructure Program

Repair/Rehabilitation of Multi-Purpose Buildings at: A) Sagbayan, Bohol

1. Barangay Langtad 2. Barangay Mantalongon B) San Isidro, Bohol

1. Barangay Candungao 2. Barangay Baunos 3. Barangay Abehilan C) Danao, Bohol

1. Barangay San Carlos

Brief Description of Work/Scope of Work (BARANGAY LANGTAD, SAGBAYAN, BOHOL): PART B: EARTHWORKS:

803 - Structure Excavation PART F : CONCRETE WORKS:

900 - Reinforced Concrete PART G : MASONRY WORKS:

506(1) - Masonry Unit (CHB)

PART H : CARPENTRY AND JOINERY WORKS: 1003(d) - Wooden Stairs

PART I : FABRICATED MATERIALS AND HARDWARE

1008 - Aluminum Glass Window (Sliding 2nd Floor Only) PART J : ROOF FRAMING WORKS:

402(2) - Timber Trusses PART K : ROOFING WORKS:

1014 - Pre-painted Metal Sheets PART L : FINISHES

1027 - Cement Plaster Finish

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Brief Description of Work/Scope of Work (BARANGAY MANTALONGON, SAGBAYAN, BOHOL): PART B: EARTHWORKS:

803 - Structure Excavation PART F : CONCRETE WORKS:

August 12, 2015 Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE DISTRICT ENGINEER

Bohol 2nd District Engineering Office Ubay, Bohol

INVITATION TO BID

(2)

900 - Reinforced Concrete PART J : ROOF FRAMING WORKS: 402(2) - Timber Trusses PART K : ROOFING WORKS:

1014 - Pre-painted Metal Sheets SPL 1 : PUBLIC TOILET

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 2 - Personal Protective Equipment (PPE), SPL 3 - Safety and Health Personnel, SPL 4 - Project Billboard

Brief Description of Work/Scope of Work (BARANGAY CANMAYA DIOT, SAGBAYAN, BOHOL): PART B: EARTHWORKS:

803 - Structure Excavation PART F : CONCRETE WORKS:

900 - Reinforced Concrete PART J : ROOF FRAMING WORKS:

403 - Metal Structure PART K : ROOFING WORKS:

1014 - Pre-painted Metal Sheets

PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS: 1032(a-3) - Metal Painting

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Brief Description of Work/Scope of Work (BARANGAY CANDUNGAO, SAN ISIDRO, BOHOL): PART B : EARTHWORKS

803 - Structure Excavation PART F : CONCRETE WORKS

900 - Reinforced Concrete includes Footing, Column, Tie Beam, RC Beam, Concrete Slab 2nd Floor & RC Roof Beam

PART G : MASONRY WORKS:

506(1) - Masonry Unit (CHB)

PART H : CARPENTRY AND JOINERY WORKS 1003(a) - Wooden Ceiling

PART I : FABRICATED MATERIALS AND HARDWARE 1010 - Wooden Doors and Windows

PART J : ROOF FRAMING WORKS 402(2) - Timber Trusses PART K : ROOFING WORKS

1014 - Pre-painted Metal Sheets PART L : FINISHES

1027 - Cement Plaster Finish, SPL 1 - Stairways, SPL 2 - Railings PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 3 - Personal Protective Equipment (PPE), SPL 4 - Safety and Health Personnel, SPL 5 - Project Billboard

(3)

PART B : EARTHWORKS

803 - Structure Excavation PART F : CONCRETE WORKS

900 - Reinforced Concrete includes Footing, Columns, Tie Beam, RC Beam, Concrete Slab

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Brief Description of Work/Scope of Work (BARANGAY ABEHILAN, SAN ISIDRO, BOHOL) PART B : EARTHWORKS

803 - Structure Excavation PART F : CONCRETE WORKS

900 - Reinforced Concrete includes Footing, Columns, Tie Beam, RC Beam, Concrete Slab (2nd Floor)

PART J: ROOF FRAMING WORKS 402(2) - Timber Trusses

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Brief Description of Work/Scope of Work (BARANGAY SAN CARLOS, DANAO, BOHOL) PART B : EARTHWORKS

803 - Structure Excavation PART F : CONCRETE WORKS

900 - Reinforced Concrete PART J : ROOF FRAMING WORKS

403 - Metal Structure PART K : ROOFING WORKS

1014 - Pre-Painted Metal Sheets

PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS: 1032(a-3) - Metal Painting

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Location of the Contract : Sagbayan, San Isidro and Danao, Bohol Total Approved Budget for

the Contract (ABC) : P 4,933,496.70 Contract Duration : 110 calendar days Cost of Bidding Documents : P 5,000.00 B) Contract ID No. : 15HC0132

Contract Name : Cluster 2 - Local Infrastructure Program

Repair/Rehabilitation of Multi-Purpose Buildings at: A) Trinidad, Bohol

1. Barangay Poblacion B) Bien Unido, Bohol

(4)

C) Talibon, Bohol

1. Barangay Burgos D) Ubay, Bohol

1. Barangay Tubog 2. Barangay Bood

Brief Description of Work/Scope of Work (BARANGAY POBLACION, TRINIDAD, BOHOL) PART F : CONCRETE WORKS

900 - Reinforced Concrete PART G : MASONRY WORKS

506(1) - Masonry Unit (CHB)

PART H : CARPENTRY AND JOINERY WORKS 1003(a) - Wooden (Ceiling & Trusses) PART I : FABRICATED MATERIALS AND HARDWARE

1010 - Wooden Doors and Windows

PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032 - Painting Works

SPL 1 - Concrete Paving

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 2 - Personal Protective Equipment (PPE), SPL 3 - Safety and Health Personnel, SPL 4 - Project Billboard

Brief Description of Work/Scope of Work (BARANGAY NUEVA ESPERANZA, BIEN UNIDO, BOHOL)

PART B : EARTHWORKS

803 - Structure Excavation PART F : CONCRETE WORKS

900 - Reinforced Concrete PART J : ROOF FRAMING WORKS

403 - Metal Structure PART K : ROOFING WORKS

1014 - Pre-Painted Metal Sheets

PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Brief Description of Work/Scope of Work (BARANGAY BURGOS, TALIBON, BOHOL) PART B : EARTHWORKS

803 - Structure Excavation PART F : CONCRETE WORKS

900 - Reinforced Concrete PART J : ROOF FRAMING WORKS

403 - Metal Structure PART K : ROOFING WORKS

1014 - Pre-Painted Metal Sheets

PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting

Page 4 of 9

(5)

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Brief Description of Work/Scope of Work (BARANGAY TUBOG, UBAY, BOHOL) PART B : EARTHWORKS

803 - Structure Excavation PART F : CONCRETE WORKS

900 - Reinforced Concrete PART J : ROOF FRAMING WORKS

403 - Metal Structure PART K : ROOFING WORKS

1014 - Pre-Painted Metal Sheets

PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Brief Description of Work/Scope of Work (BARANGAY BOOD, UBAY, BOHOL) PART B : EARTHWORKS

803 - Structure Excavation PART F : CONCRETE WORKS

900 - Reinforced Concrete PART J : ROOF FRAMING WORKS

403 - Metal Structure PART K : ROOFING WORKS

1014 - Pre-Painted Metal Sheets

PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Location of the Contract : Trinidad, Bien Unido, Talibon and Ubay, Bohol Total Approved Budget for

the Contract (ABC) : P 3,642,025.86 Contract Duration : 110 calendar days Cost of Bidding Documents : P 5,000.00

C) Contract ID No. : 15HC0133

Contract Name : Cluster 3 - Local Infrastructure Program

Repair/Rehabilitation of Multi-Purpose Buildings at: A) Ubay, Bohol

1. Barangay Pag-asa 2. Barangay Los Angeles 3. Barangay Sentinela

Page 5 of 9

(6)

4. Barangay San Isidro 5. Barangay Juagdan 6. Barangay Ilihan

Brief Description of Work/Scope of Work (BARANGAY PAG-ASA, UBAY, BOHOL) PART B : EARTHWORKS

803 - Structure Excavation PART F : CONCRETE WORKS

900 - Reinforced Concrete PART J : ROOF FRAMING WORKS

403 - Metal Structure PART K : ROOFING WORKS

1014 - Pre-Painted Metal Sheets

PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Brief Description of Work/Scope of Work (BARANGAY LOS ANGELES, UBAY, BOHOL) PART B : EARTHWORKS

803 - Structure Excavation PART F : CONCRETE WORKS

900 - Reinforced Concrete PART J : ROOF FRAMING WORKS

403 - Metal Structure PART K : ROOFING WORKS

1014 - Pre-Painted Metal Sheets

PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Brief Description of Work/Scope of Work (BARANGAY SENTINELA, UBAY, BOHOL) PART B : EARTHWORKS

803 - Structure Excavation PART F : CONCRETE WORKS

900 - Reinforced Concrete PART J : ROOF FRAMING WORKS

403 - Metal Structure PART K : ROOFING WORKS

1014 - Pre-Painted Metal Sheets

PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Page 6 of 9

(7)

Brief Description of Work/Scope of Work (BARANGAY SAN ISIDRO, UBAY, BOHOL) PART B : EARTHWORKS

803 - Structure Excavation PART F : CONCRETE WORKS

900 - Reinforced Concrete PART J : ROOF FRAMING WORKS

403 - Metal Structure PART K : ROOFING WORKS

1014 - Pre-Painted Metal Sheets

PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Brief Description of Work/Scope of Work (BARANGAY JUAGDAN, UBAY, BOHOL) PART B : EARTHWORKS

803 - Structure Excavation PART F : CONCRETE WORKS

900 - Reinforced Concrete PART J : ROOF FRAMING WORKS

403 - Metal Structure PART K : ROOFING WORKS

1014 - Pre-Painted Metal Sheets

PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a-3) - Metal Painting

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 1 - Personal Protective Equipment (PPE), SPL 2 - Safety and Health Personnel, SPL 3 - Project Billboard

Brief Description of Work/Scope of Work (BARANGAY ILIHAN, UBAY, BOHOL) PART B : EARTHWORKS

801 - Removal of Structures and Obstructions PART G : MASONRY WORKS

560(1)A - Masonry Unit

PART H : CARPENTRY AND JOINERY WORKS 1003 (a & b) - Wooden Partition/Ceiling PART I : FABRICATED MATERIALS AND HARDWARE

1010 - Wooden Doors and Windows PART L : FINISHES

1018 - Ceramic Tiles

1027 - Cement Plaster Finish

PART M : PAINTING, VARNISHING AND OTHER RELATED WORKS 1032(a.1) - Painting Works (Masonry Paint)

1032(a.2) - Painting Works (Wooden Paint) PART P : ELECTRICAL WORKS

(8)

Works (Perimeter Fence)

PART R : CONSTRUCTION SAFETY AND HEALTH

SPL 4 - Personal Protective Equipment (PPE), SPL 5 - Safety and Health Personnel, SPL 6 - Project Billboard

Location of the Contract : Ubay, Bohol Total Approved Budget for

the Contract (ABC) : P 4,327,712.73 Contract Duration : 110 calendar days Cost of Bidding Documents : P 5,000.00 1. 2. 3. 4. 5. 6. 7.

Interested bidders may obtain further information from the DPWH, Bohol 2nd District Engineering Office, Ubay, Bohol and inspect the Bidding Documents at the address given below from 8:00 A.M. to 5:00 P.M.

A complete set of Bidding Documents may be purchased by interested Bidders from the address given below and upon payment of a non-refundable fee for the Bidding Documents in the amount stated above.

It may also be downloaded free of charge from the website of the Philippine Government Electronic Procurement System (PhilGEPS) and the website of the Procuring Entity, provided that bidders shall pay the fee for Bidding Documents not later than the submission of their bids.

Contract Profile Eligibility Processing will be on September 01, 2015 at 10:00 A.M. Bids must be delivered to the address below on or before September 01, 2015 at 2:00 P.M. at the DPWH Bohol 2ndDistrict Engineering Office, Ubay, Bohol. All bids must be accompanied by a bid security in any of the acceptable forms and in the amount stated in the ITB Clause 18.

Bids will be opened on September 01, 2015 at 2:00 P.M. in the presence of the bidder's representative who choose to attend at the address below. Late bids shall not be accepted.

The DPWH, Bohol 2nd District Engineering Office, Ubay, Bohol, now invites bids for the above-mentioned works description. Completion of the Works is required for the above-stated contract duration. Bidders should have completed within ten (10) years from the date of submission and receipt of bids, a contract similar to the Project. The description of an eligible bidder is contained in the Bidding Documents, particulary, in Section II, Instruction to Bidders.

The DPWH Bohol 2ndDistrict Engineering Office, Ubay, Bohol will hold a Pre-Bid Conference on August 20, 2015_ at 2:00 P.M. at the Conference Room, DPWH Bohol 2nd District Engineering Office, Ubay, Bohol which shall be open only to all interested parties who have purchased the Bidding Documents.

Bidding is restricted to Filipino Citizens/sole proprietorships, partnerships or organizations with at least seventy five (75%) interest or oustanding capital stock belonging to citizens of the Philippines.

The DPWH, Bohol 2nd District Engineering Office, Ubay, Bohol, through the Local Infrastructure Program CY 2015, intends to apply the sum stated above being the Approved Budget for the Contract (ABC) to payments under contract for the above-mentioned contract projects. Bids received in excess of the ABC shall be automatically rejected at bid opening.

Bidding will be conducted through open competitive bidding procedures using non-discretionary pass/fail criterion as specified in the Implementing Rules and Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise known as the "Government Procurement Reform Act".

(9)

8.

9.

10. For further information, please refer to:

JUNIBE C. FROILAN Engineer III

OIC-Asst. District Engineer BAC Chairman

Attention: BAC Secretariat

DPWH - Bohol II DEO,Ubay, Bohol Telefax No. (038) 518-8051

Email add: dpwhbohol2@yahoo.com

To bid for this contract, a contractor must submit a Net Financial Contracting Capacity (NFCC) at least equal to ABC and the Original Receipt (OR) for payment of bidding documents before dropping of bids. Bidders shall likewise submit their bids through their duly Authorized Liaison Officers as specified in the Contractor's Information (CI). Submission of Letter of Intent (LOI) is no longer required pursuant to Item C.3 of D.O. 64 S. 2012, dated September 17, 2012.

The DPWH, Bohol 2ndDistrict Engineering Office, Ubay, Bohol reserves the right to accept or reject any bid, to annul the bidding process, and the reject all bids at any time prior to contract award, without thereby incurring any liability to the affected bidder or bidders.

choose to attend at the address below. Late bids shall not be accepted.

References

Related documents

• The City reserves the right to reject any and all bids, to waive any informalities in bids received, to accept or reject any or all of the items bid, and to award the contract

6.4.1 The Bank reserves the right to accept or reject any EOI or annul the short listing process at any time in the process. Information in any other language, if not accompanied

McKinney Independent School District reserves the right to accept or reject any and/or all bids/proposals for any or all products and/or services covered in this bid/proposal

addressed on the City’s website under current Bids. b) The City reserves the right to reject any and all bids, to waive any minor informality or irregularity in any bid, to

MCS reserves the right to waive technicalities, to accept or reject any and all proposals and to waive any irregularity in proposals received, to award the entire bid to one bidder

The Employer reserves the right to accept or reject any bid, and to annul the bidding process and reject all bids, at any time prior to award of Contract,

The Bank reserves the right to accept or reject any bid and annul the bidding process and reject all bids at any time prior to award of contract, without thereby incurring

The IIITD reserves the right to accept or reject any Bid and annul the Bidding process or even reject all Bids at any time prior to award of contract, without thereby incurring