HOCHTIEF POLSKA

OUR REFERENCES

ARE BASED ON A SOLID

FOUNDATION

(2)

HOCHTIEF POLSKA

INDIVIDUAL SOLUTIONS

ARE A SOURCE OF BENEFITS

TO OUR CLIENTS

(3)

Individual solutions

are a source of benefits

to our clients

Dear Business Partners,

Since 1996 HOCHTIEF Polska has been successfully implementing projects which blend with the landscape of polish cities permanently. Many examples of such buildings can be found on the maps of Warsaw, Poznań and Kraków where the branches of our company are located. For many years now, private investors and public institutions have been placing their trust in our hands, contracting us to carry out major investments. Our best recommendation are our clients who, after our having executed one project, trust us with the realisation of the next. This is due to our comprehensive attitude to the market, implementation of the projects to the highest standards and quality as well as applying fair-play principle in contacts with our business partners - not only investors but also designers, architects and subcontractors. Through this brochure we would like to to acquaint you with the offer of our selected reference projects in which we combine local experience and knowledge of HOCHTIEF Polska with the international expertise of HOCHTIEF Group. Henryk Liszka

CEO

HOCHTIEF Polska

CONTENTS

Construction of office buildings 8

Construction of residential buildings 18

Construction of infrastructural objects 24

Construction of public facilities 30

Construction of shopping and entertainment centers 36

(4)

The Nowy Dom Jabłkowskich office building in Warsaw

HOCHTIEF POLSKA

EXCELLENT WORKING

CONDITIONS LEAD TO BETTER

EFFICIENCY AND HIGHER PROFITS

(5)

The Brama Portowa I, II office complex in Szczecin

Investor: SwedeCenter

General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 12.2010 - 11.2012

Total area: 4,500 square meters (Brama Portowa I), 8,000 square meters (Brama Portowa II)

A modern office complex with two independent buildings in the center of Szczecin, at Brama Portowa square. The project has been implemented complete with ecological solutions enabling application for LEED certification. In accordance with the rules of sustainable construction, the project is unique with innovative water and energy saving systems, optimal access for sunlight, waste degradation, and roofing providing protection against the “heat island effect”, and bicycle parking spaces for the lessees.

The Business Garden Warszawa office complex in Warsaw (1st stage)

Investor: SwedeCenter

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 02.2011 – 12.2012

Total area: 58,000 square meters

Both buildings form 1st stage of the Business Garden complex. They house office space, a business hotel as well as conference center and restaurants. The construction involved the application of modern design and technical solutions compliant with the principles of sustainable construction. A LEED certificate has been applied for in relation to B2 office building.

The Nowy Dom Jabłkowskich office building in Warsaw

Investor: LHI and Dom Towarowy Bracia Jabłkowscy General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 01.2010 – 09.2011

Total area: 4,500 square meters

The prestigious investment was designed so that its shell would be reminiscent of the pre-war buildings while the architectonic solutions could combine with the style of the neighbouring buildings.

The Francuska office center in Katowice

Investor: Cyril (Globe Trade Center subsidiary)

General contractor: HOCHTIEF Polska Branch in Kraków Time of construction: 06.2008 – 07.2010

Usable area: 27,100 square meters

The Francuska office center consists of two seven-storey, class A office buildings founded on two-storey car park. The Brama Portowa I, II office complex in Szczecin

The Business Garden Warszawa

The Francuska office center in Katowice

The best solutions

(6)

The Poloneza office building in Warsaw

Investor: Poloneza Investment

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 07.2009 – 08.2010

Total area: 7,200 square meters

The three-storey office building with an underground car park, above-ground parking space and a warehouse part.

The Canal + office building in Warsaw

Investor: LHI Leasing Group

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 01.2007 – 03.2008

Total area: 14,800 square meters

The Canal + is a modern six-storey office building with a three-storey underground car park for 137 park places. With facades finished predominantly in glass, steel and concrete, it has a modern and simple form and a light structure.

The Globis office building in Wrocław

The Adgar Plaza A and B office complex in Warsaw

The Flanders Business Park in Warsaw

The Canal + office building in Warsaw

The Flanders Business Park in Warsaw

Investor: Ceresco Poland

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 04.2008 – 05.2009

Office space: 12,915 square meters

The A building consists of two parts: five- and six-storey part and an underground storey serving as a car park. Additionally, there are technical storeys constructed in both parts.

The Adgar Plaza A and B office complex in Warsaw

Investor: Adgar Postępu

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 01.2007 – 10.2008 (A building) 06.2008 – 11.2009 (B building)

Usable space: 40,900 square meters

A modern 10-storey class A office complex consists of two buildings with conference center for 300 people and an underground car park.

The Globis office building in Wrocław

Investor: GLOBIS Wrocław (Globe Trade Center subsidiary) General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 12.2006 – 10.2008

Usable area: 19,600 square meters

The 13-storey structure not only accommodates office space but also a commercial and restaurant. Three underground storeys are used for car parks.

(7)

The Tulipan House in Warsaw

Investor: Segro Poland

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 02.2007 – 05.2008

Usable space: 17,894 square meters

The Tulipan House stands out as a unique architectural work - the building having been designed on the plan of a flower and providing the optimal amount of natural light with a 14 m glass atrium giving the building its thoroughly modern look.

The Diamante Plaza in Kraków

Investor: Aldesa Polska

General contractor: HOCHTIEF Polska Branch in Kraków Time of construction: 06.2008 – 08.2009

Usable space: 17,900 square meters

The Diamante Plaza is a four-storey class A building. The modern shape of the building resembles an irregularly cut diamond. Complete glazing gives the maximum amount of natural light inside the building.

The International Business Center in Warsaw (1st and 2nd stage)

Investor: INTERBUS I, INTERBUS II (Golub Europe LLC) General contractor: HOCHTIEF Polska Branch in Warsaw

Time of construction: 03.2001 - 01.2003 (1st stage) 04.2006 -05.2007 (2nd stage) Total area: 54,095 square meters

The International Business Center is situated close to the Warsaw metropolitan subway line and is an “intelligent” office object of the highest class. The complex was designed to offer office space at the higher floors, space for commerce and services at the ground floor and three storeys of an underground car park.

The Tulipan House in Warsaw

The Andersia Tower in Poznań

The Andersia Tower in Poznań

Investor: Andersia Tower

General contractor: HOCHTIEF Polska Branch in Poznań, HOCHTIEF Polska Branch in Warsaw

Time of construction: 09.2005 - 10.2007 Total area: 42,518 square meters

The Andersia Tower is a mixed-use development comprising office, hotel, and retail space. The lower floors are used for a deluxe hotel with retail outlets, restaurants, conference center and a large banquet & ball room. The upper floors of the “Andersia Tower” are designated for class “A” office space.

The Diamante Plaza in Kraków

The International Business Center in Warsaw (1st and 2nd stage)

(8)

The Stock Exchange Center

Investor: Centrum Giełdowe

General contractor: Consortium of HOCHTIEF Polska Branch in Warsaw and Porr Polska

Time of construction: 03.1998 - 04.2000 Total area: 33,657 square meters

A modern nine-storey building of the new Stock Exchange Center in Warsaw. Its architectural assets allow the building to seamlessly integrate with the surrounding urban landscape. Another assets of the project are state-of-the-art interior design and location right in the middle of the city.

The Liberty Corner office building in Warsaw

Investor: Von der Heyden Group

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 10.2001 - 12.2003

Total area: 13,016 square meters

Eight-storey office building has been designed as two separate parts A and B. Precious materials have been selected for the exterior façade, where white and light-yellow sandstone is dominant. Statues preserved from ex-censorship building and placed now in the main corridor on the ground floor are an interesting interior element.

The Rondo 1 office complex in Warsaw

Developer: HOCHTIEF Development Poland

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 03.2003 – 12.2006

Total area: 103,000 square meters

The Rondo 1 is one of the most well-known building in Warsaw, distinctive because of its: modernistic architecture, cutting-edge technology, top notch standards and a prestigious location. The building Rondo 1 is the first office building in Europe which has been awarded the certificate LEED Gold in the category "existing building". The office project Rondo 1 consists of two elements: 40-storey skyscraper with ca. 58,000 square meters office area and 10-storey building offering retail rooms and car park places. Both structures are connected by a 14 m high, glass space called „winter garden” accessible to the wider public.

The Rondo 1 office complex in Warsaw The Liberty Corner office building in Warsaw

The Metropolitan office building in Warsaw

Investor: Hines Polska

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 09.2001 - 09.2003

Total area: 66,800 square meters

The object consists of three independent seven-storey buildings located within a pentagonal shape, hence the nickname of the building, which is often called “the Warsaw Pentagon”. The Metropolitan was the first AAA-class object in Poland and the only one such object in Central Europe. It has been designed

by the world-famous architect, Lord Norman Foster. The Metropolitan office building in Warsaw

(9)

The Kalinowe residential complex in Rokietnica

HOCHTIEF POLSKA

SAFETY AND BETTER LIVING

CONDITIONS ARE AN INVESTMENT

IN THE FUTURE

(10)

The Holland Park II residential complex in Warsaw

Investor: Holland Park II

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 08.1999 - 01.2001

Total area: 14,150 square meters

The housing project includes buildings of eight, seven and five storeys.

The Olbrachta residential complex in Warsaw

Investor: Dom Development

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 04.2007 – 12.2008

Total area: 55,000 square meters

The scope of the project included construction of three residential buildings with 448 apartments.

The best solutions

in residential segment

The Platinum Towers in Warsaw

Investor: Platinum Towers

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 08.2007 – 07.2009

Total area: 58,450 square meters

The Platinum Towers is one of the technologically most advanced and most prestigious residential investment in the center of Warsaw. Built between Grzybowska and Wronia streets, is a part of a luxury hotel, conference and residential complex.

The CityZen I, II residential complex in Warsaw

Investor: Espais

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 07.2008 - 06.2010 (CityZen I) 07.2011 – 06.2012 (CityZen II)

Area: 24,500 square meters (CityZen I) 13,325 square meters (CityZen II)

The state-of-the-art architecture of the complex is a combination of glass, stainless steel and natural stone panels used both in its facades and in the interiors. The internal garden in the Zen style of an area of 5,000 square meters is available to residents only.

The Holland Park II residential complex in Warsaw The CityZen I, II residential complex in Warsaw

(11)

The Opera Residence in Warsaw

The Villa Poema residential building in Warsaw

Investor: Hepolico Investments (the company of HOCHTIEF Polska) General contractor: HOCHTIEF Polska Branch in Warsaw

Time of construction: Q2 2011 - 11.2012 Area: 2,690 square meters

The organisation of the entire development process of the Villa Poema project was carried out by HOCHTIEF Polska. The scope of works included a construction of five-storey building with 42 apartments. The intimate nature of the object, the greenery in the immediate area, proximity to the city center and the shopping center as well as the specific

atmosphere of Zoliborz are the main features of the Villa Poema project. The building has a total usable area of 2,690 square meters and has apartments with floor areas ranging from 39 to 92 square meters.

The Opera Residence in Warsaw

Investor: Dom Development

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 07.2003 – 10.2005

Usable space: ca. 8,300 square meters

An apartment building located in the city center near the Saski Park. The façade of the building and interior design refer to the style of the buildings from the late nineteenth and early twentieth century.

The Meridian in Warsaw

The Gemini residential building in Warsaw

The Gemini residential building in Warsaw

Investor: Ronson Development Buildings

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 09.2008 – 09.2010

Total area: 19,000 square meters

The building meets top architectural standards and best usability requirements (large wooden windows, spacious terraces, loggias and balconies). It has a very attractive location in direct neighbourhood of the Ursynów Borough Office Building, an underground station and the proximity of the rich infrastructure of the district.

The Meridian in Warsaw

Investor: Ronson Development Investment

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 12.2005 – 09.2007

Total area: 30,408 square meters

With its high standard of finishing work and favorable location in the center of Warsaw in the proximity of Chłodna Street's historical architecture, this project is an example of the finest architecture.

The Villa Poema residential building in Warsaw

The Kalinowe Residential Estate in Rokietnica

Investor: Kalbud Deweloper

General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 10.2007 – Q2 2008 (1st stage) 10.2008 – 07.2011 (2nd stage)

Area: 13,760 square meters (1st stage) 19,607 square meters (2nd stage)

The Kalinowe Estate was built in close proximity to green landscapes, the project envisages solutions combined with the natural surrounding: wooden elevation panels, blinds made of Siberian Larch, exterior window trims in harmony with the wooden elevation elements and sunken waste containers.

(12)

HOCHTIEF POLSKA

WE LAY EMPHASIS

ON THE HIGHEST

COMPETENCIES

(13)

Expansion of the passenger terminal at the Chopin Airport in Warsaw

Investor: Przedsiębiorstwo Państwowe „Porty Lotnicze”

General contractor: HOCHTIEF Polska Branch in Warsaw and HOCHTIEF Solutions Time of construction: 02.2010 – 08.2011

Area: 18,316 square meters

The scope of works included construction of the central pier and completing the construction of the southern pier of terminal as well as five gates and five lifts.

The Deep-sea Container Terminal Gdansk (DCT) in the Northern Port in Gdansk

Investor: DCT Gdańsk

General contractor: Consortium of HOCHTIEF Construction AG Infrastructure Polska, HOCHTIEF Construction AG Civil Engineering and Marine Works and HOCHTIEF Polska Time of construction: 10.2005 - 10.2007

The construction site had the area of 44 ha

The Deepwater container terminal in Gdańsk North Harbour is the first within the Baltic Sea to have the capability to service most post-Panamax container vessels with regards to access, depth of water, quay facilities and equipment. The terminal was built on an artificially formed solid pier measuring 800 m where two container reloading stations were built:

– the first section of the quay is 385 m long and the water depth at it is 16,5 m

– the other section is 265 m long and has 13,5 m water depth. This section is additionally ended with a ramp for Ro-Ro ship handling.

The project also included the construction of transport routes and a railway line, each 2 km in length as well as an office building with ca. 3,000 square meters of usable area and Cargo Freight Station with total area amounts to 7,500 square meters.

The Deep-sea Container Terminal Gdansk (DCT) in the Northern Port in Gdansk

Expansion of the passenger terminal at the Chopin Airport in Warsaw

The best solutions

(14)

The passenger Terminal 3 of the Władysław Reymont International Airport

The passenger Terminal 3 of the Władysław Reymont International Airport

Investor: Port Lotniczy Łódź im. Władysława Reymonta

General contractor: Consortium of HOCHTIEF Polska Branch in Warsaw, HOCHTIEF Solutions and Warbud (leader) Time of construction: 12.2009 - 06.2012

Total area: 28,000 square meters

The new terminal hall includes three usable above-ground storeys, as well as a technical storey, an entresol and an underground storey. With above 9,000 square meters of the designed base area, the terminal has a total area of 28,000 square meters.

Expansion of the Poznań-Ławica Airport (1st stage)

Investor: Port Lotniczy Poznań-Ławica

General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 03.2011 – 03.2012

Total area: 17,800 square meters

The first stage of the works covered the construction of a new part for the terminal. The check-in hall and new arrivals zone (on the ground floor) as well as technical facilities for the whole building on the underground storey are housed in this building.

Extension of the passenger terminal at the Wrocław-Strachowice Airport

Expansion of the Poznań-Ławica Airport (1st stage)

Extension of the passenger terminal at the Wrocław-Strachowice Airport

Investor: Port Lotniczy Wrocław

General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 09.2009 – 02.2012

Usable area: 38,670 square meters

The scope of works included the construction of the new passenger terminal with the infrastructure and equipment of the new location. Project was designed to comply with IATA's standard C, as a hall with three above-ground storeys and one underground storey.

(15)

HOCHTIEF POLSKA

UNIQUE PROJECTS ARE

OFTEN A SCENE OF

GREAT EVENTS

(16)

Expansion of the Eugeniusz Geppert Academy of Fine Arts in Wrocław

Investor: Eugeniusz Geppert Academy of Fine Arts General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 09.2010 – 12.2012

Area: 13,000 square meters

The new building located at the junction of Traugutta and Krasińskiego streets houses the Center of Practical Art and the Innovation Center. With the attic level as high as 25 m above the ground, it has four storeys and one underground floor. It also includes a small-sized glass mill dedicated for the exclusive use of the Academy’s students.

The Kraków Opera

Investor: Opera Krakowska

General contractor: HOCHTIEF Polska Branch in Kraków Time of construction: 09.2004 – 11.2008

Area: 11,914 square meters

The modern building for the Kraków Opera was created as reconstruction of the former manège, which was enhanced by a new structure on its backyard. The entire complex consists of three integrated parts: administration & technical building, main opera house with seats, stage and audience zones, and commercial building with box-office lobby, space for lease and restaurants.

The Dialog Arena football stadium

Investor: Zagłębie Lubin SSA (KGHM Polska Miedź SA Group) General contractor: Consortium with HOCHTIEF Polska and PeBeKa Time of construction: 09.2007 – 06.2010

Capability: 16 000 football fans

The facility meets the highest security standards and UEFA requirements for class 3 stadi-ums. All the stands of the new football stadium are covered. Within the contract frame new technical and sanitary facilities, changing rooms and a VIP zone were constructed. To  ensure continuity of football matches during most of the coming seasons the  construction of the new stadium was accomplished in stages. The new stadium was introduced into the partly preserved and existing banks of the current stands.

The Aula Nova - the Concert Hall of the I. J. Paderewski Music Academy in Poznań

Investor: I. J. Paderewski Music Academy in Poznań General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 04.2005 - 06.2006

Area: 4,520 square meters

The Aula Nova is often called a musical landmark of Poznan. The building is also a perfect venue for cultural and artistic events for the Music Academy as well as for the entire region of Wielkopolska. The building meets the highest acoustic standards and holds around 540 people.

The best solutions

in public facilities segment

(17)

The Pałac Sprawiedliwości (Palace of Justice) in Warsaw

Investor: The Ministry of Justice, The Supreme Court, Warsaw Centrum Borough General contractor: Consortium with HOCHTIEF Polska

Time of construction: 06.1996 - 11.1999 Area: 44,744 square meters

The four-storey object is the seat of the Supreme Court as well as the Appellation Court. With its characteristic design and symbolic form, the building has become one of the new architectural landmarks of the capital of Poland.

The Pałac Sprawiedliwości (Palace of Justice) in Warsaw

The Andrzej Frycz Modrzewski Krakow University Collage

Investor: The Andrzej Frycz Modrzewski Krakow University Collage General contractor: HOCHTIEF Polska Branch in Kraków Time of construction:

1st stage: 03.2003 - 08.2004 2nd stage: 07.2004 - 07.2005 3rd stage: 08.2007 - 12.2008 Area:

1st stage: 10,784 square meters 2nd stage: 5,500 square meters 3rd stage: 8,985 square meters

Three stages of the Andrzej Frycz Modrzewski Krakow University College form a coherent architectural complex:

– two buildings constructed in the 1st and 2nd stages with three storeys and underground parts,

– the building constructed in the 3rd stage with four-storey and underground car park. Its lenght amounts to 120 meters.

The Qubus Hotel Cracow

Investor: Echo Investment

General contractor: HOCHTIEF Polska Branch in Kraków Time of construction: 11.2004 - 05.2006

Area: 12,000 square meters

Building of a modern hotel in monumental surroundings of the old city required a skilful adjustment of the architecture of the building to the existing building frontage of 19th century Podgórze. Thanks to the architectonic solutions applied, the structure has been perfectly adjusted to the existing urban arrangement of the surroundings, maintaining the historical character of the city.

Modernization of the C level of MTP exhibition hall No.15 in Poznań

Investor: Międzynarodowe Targi Poznańskie

General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 03.2012 – 12.2012

Area: 6,500 square meters

As a result of disassembly of the central part of an existing roof and construction of the new one was developed a multi-purpose amphitheatre conference room for around 2,000 people. Owing to mobile walls and telescopic auditorium areas, the building became more functional.

(18)

HOCHTIEF POLSKA

BECAUSE UNIQUE

ARCHITECTURE COMPLIES

WITH THE UNIQUE STYLE

(19)

The Marine Commercial Park in Gdańsk The Malta Gallery in Poznań

The best solutions in shopping

and entertainment centers

The Malta Gallery in Poznań

Investor: Neinver Polska

General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 02.2007 – 03.2009

Total area: 162,000 square meters

The modern, three-storey steel-and-glass Malta Gallery building is the largest commercial and entertainment cent-er in the Wielkopolska Region.

The Castorama shopping center in Oświęcim

Investor: Castim

General contractor: HOCHTIEF Polska Branch in Kraków Time of construction: 03.2012 – 08.2012

Area: 7,000 square meters

The building with three zones of functionality: – one-storey shopping hall,

– two-storey social-office back-room facilities, – one-storey technical-storage back-room facilities.

The Marine Commercial Park in Gdańsk

Investor: Librecht&Wood Polska

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 03.2010 – 03.2011

Total area: 27,700 square meters

The project consists of buildings B and C of the complex, including their technical infrastructure, access roads and car parks. The single-storey Building C is dedicated

to independent tenants.

The Baltic Gallery in Gdańsk - Wrzeszcz The Castorama shopping center in Oświęcim

The Baltic Gallery in Gdańsk - Wrzeszcz

Investor: ECE Projektmanagement

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 03.2006 – 09.2007

Area: 110,000 square meters

The project consists of five-storey shopping center located by the crossing of Grunwaldzka and Kościuszki streets. Two last storeys are designed as a multilevel parking with 1 100 park places.

(20)

The Leroy Merlin retail hall in Modlniczka near Kraków

Investor: Leroy Merlin Inwestycje

General contractor: HOCHTIEF Polska Branch in Kraków Time of construction: 04.2004 – 09.2004

Area: 12, 600 square meters

Simply and elegance commercial hall of the House and Garden Department of Leroy Merlin is one of the several projects constructed by HOCHTIEF Polska for the distributor of building and finishing materials. Another projects were

implemented in Bielsko-Biała, Żory, Gliwice, Krasne near Rzeszów, Poczesna, Mikołów, Nowa Wieś near Częstochowa and in Katowice.

The Old Brewery (Stary Browar) Commerce, Art and Business Center (1st stage and 2nd stage)

The Old Brewery (Stary Browar) Commerce, Art and Business Center (1st stage and 2nd stage)

Investor: Fortis

General contractor: Consortium of HOCHTIEF Polska Branch in Poznań and Porr Polska Time of construction: 06.2002 - 11.2003 (1st stage), 09.2005 - 03.2007 (2st stage) Area: 68,942 square meters (1st stage), 65,477 square meters (2st stage)

The Old Brewery Commerce, Art and Business Center is an example of a modern building which is compliant to history. Nineteenth-century buildings of Hugger’s Brewery in the center of Poznań was adapted as a commercial center and an office park. The second construction stage included an expansion of the complex by adding a new office and commercial building.

The Leroy Merlin retail hall in Modlniczka near Kraków The Futura Park complex in Modlniczka near Kraków

The Futura Park complex in Modlniczka near Kraków

Investor: Neinver Polska

General contractor: HOCHTIEF Polska Branch in Kraków Time of construction: 06.2010 – 08.2011

Area: 49,000 square meters

The project consists of a two-storey building of an area exceeding 49,000 square meters and a 1,400-vehicle car park. The Futura commercial park provides space for small and medium-sized shops and an outlet center. Futura is the first project executed by HOCHTIEF Polska according to demands of BREEAM. The building got the certificate BREEAM with rating of very good in 2012.

(21)

HOCHTIEF POLSKA

TECHNOLOGIES WHICH

TAKE A CARE OF

FUTURE GENERATIONS

(22)

The Kronospan production hall in Strzelce Opolskie

Investor: Kronospan Szczecinek

General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 03.2008 – 09.2009

Area: 37,000 square meters

Five manufacturing halls were constructed in steel structure with firewalls and technical buildings.

The production facility for Polynt in Niepołomice

Inwestor: Polynt

General contractor: HOCHTIEF Polska Branch in Kraków Time of construction: 11.2006 – 02.2009

Usable area: 3,300 square meters

The scope of the works included construction of five production facilities as well as extension of office building.

Extension of Tyskie Browar Książęcy in Tychy

The Eaton production plant in Bielsko-Biała

The production facility for Polynt in Niepołomice

The Enginova manufacturing and storage facility in Kutno

Investor: Enginova

General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 11.2009 – 06.2010

Area: 11,000 square meters

Construction of production and warehouse hall with office and infrastructure facilities (roads, green area).

The Bridgestone tyre production halls and warehouses in Poznań

Investor: Bridgestone Poznań

General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 07.2010 – 04.2011

Usable area: 40,800 square meters

The scope of the project included a 12 m high warehouse hall and over 800 square meters of gross office space.

The best solutions

in industrial buildings segment

Extension of Tyskie Browar Książęcy in Tychy

Investor: Kompania Piwowarska

General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 06.2006 – 03.2008

Area: 3,100 square meters

The scope of the works included extension of storage facilities as well as fermentation unit and the construction of a new brewhouse.

(23)

The Euroglas float glass works in Ujazd near Łódź

Investor: Euroglas Polska

General contractor: HOCHTIEF Polska Branch in Kraków, HOCHTIEF Polska Branch in Poznań

Construction period: 05.2008 - 09.2009 Area: 85,000 square meters

The float glass factory is one of the key projects in the Łódź Economic Zone. The factory has the world's largest glass production furnace with an efficiency of 1,000 tonnes of glass per day and the longest glasswork production line in Poland. To minimise its environmental footprint, the plant leverages the most advanced equipment and procedures.

The BYŚ waste processing facility in Warsaw

Investor: BYŚ Wojciech Byśkiniewicz

General contractor: HOCHTIEF Polska Branch in Warsaw Time of construction: 02.2010 – 12.2010

Area: ca. 5,000 square meters

In addition to the sorting hall and its auxiliary facilities, the project also includes construction of roads, vehicle manoeuvre areas and car parks. The plant has an annual sorting capacity of about 150,000 tonnes.

The Phoenix Contact production hall in Nowy Tomyśl

Investor: Phoenix Contact Wielkopolska

General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 02.2009 – 02.2010

Area: 8,000 square meters

The scope of the works included construction of single-storey hall with two additional technical storeys above the roof height. Besides offices the building also has training rooms and community rooms.

The production facility for Kimball Electronics in Tarnowo Podgórne

Investor: KronoKimball Electronics Poland

General contractor: HOCHTIEF Polska Branch in Poznań Time of construction: 11.2008 – 07.2009

Area: 10,000 square meters (production hall with a warehouse) 5,100 square meters (office and technical building) The complex includes a production hall with a warehouse and a two-storey office and technical building. The project also covered internal roads and an exit from National Route 92 too.

The Euroglas float glass works in Ujazd near Łódź

The production facility for Kimball Electronics in Tarnowo Podgórne

(24)

HOCHTIEF POLSKA

INDIVIDUAL SOLUTIONS

ARE A SOURCE OF BENEFITS

TO OUR CLIENTS

(25)

HOCHTIEF Polska 14 Elbląska Street 01-737 Warsaw tel.: +48 22 560 08 00 fax: +48 22 633 97 86 www.hochtief-polska.pl [email protected] Branch in Poznań 6 Niepodległości Avenue 60-967 Poznań tel. +48 61 859 22 00 fax: +48 61 852 09 67 Office in Rzeszów

35A F. Chopina Street 35-055 Rzeszów tel. +48 17 250 99 90 Branch in Kraków 27 Lubicz Street 31-503 Kraków tel. +48 12 628 91 00 fax: +48 12 628 92 00 Branch in Warsaw 8/12 Młynarska Street 01-194 Warsaw tel. +48 22 433 57 00 fax: +48 22 433 57 99 Representative Office in Katowice 79 W. Korfantego Avenue 40-166 Katowice tel. +48 32 259 28 23 fax: +48 32 259 28 24